Bridge Statistics for Arlington, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 82ft / 24.7mTotal length
  • $25,950,000Total costs
  • 479,271Total average daily traffic
  • 25,917Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Arlington
  • No street view available for this location

New bridges in Arlington, MA - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11910-1919
  • 31930-1939
  • 61960-1969
  • 11980-1989
  • 11990-1999
  • 12000-2009
Reconstructed bridges in Arlington, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Arlington, MA
Average Bridge Truck Traffic in Arlington, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 71.4%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.5%Good
  • 36.4%Satisfactory
  • 18.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Good
  • 63.6%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: A100012MLDOT634,  Location: 91.4 M NO OF MASS AVE (Lat: 42.425436,  Lng: -71.182261),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 18,500 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 13,677 (year 2032),  Design Load: HS 20,  Features Intersected: COMB MINUTMN BP & BROOK,  Facility Carried by Structure: HWY PARK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $793,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A100042MMDOT634,  Location: 200 FT SO PARK AVE (Lat: 42.425547,  Lng: -71.180711),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.70m (5.58ft),  Average Daily Traffic: 4,914 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,370 (year 2032),  Design Load: HS 20,  Features Intersected: OTHER MINUTMN BP & BROOK,  Facility Carried by Structure: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $713,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,070,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A100084D3DOTNBI,  Location: TOWN LINE MED ARL (Lat: 42.415544,  Lng: -71.138394),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 5,302 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,738 (year 2032),  Features Intersected: WATER MYSTIC RIVER,  Facility Carried by Structure: HWY RIVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $323,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A100094D2DOTNBI,  Location: TOWN LINE MED ARL (Lat: 42.420569,  Lng: -71.142881),  Route carried "on" structure: State highway 60,  Year Built: 1936,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 24,310 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 44,220 (year 2032),  Features Intersected: WATER MYSTIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $862,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: A10011AE2DOTNBI,  Location: JUST W OLD ALEWIFE ROTARY (Lat: 42.398264,  Lng: -71.143861),  Route carried "on" structure: State highway 2,  Year Built: 2004,  Status: Open,  Structure Length: 3.80m (12.47ft),  Average Daily Traffic: 70,300 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 120,027 (year 2032),  Design Load: HS 20,  Features Intersected: TR MNUTEMAN BP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 222.727,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.4m (86.6ft),  Skew: 34 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.9m (117.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $868,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A100139WPDOTNBI,  Location: 072288 128465599 (Lat: 42.404392,  Lng: -71.134536),  Route carried "on" structure: City street ,  Year Built: 1913,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 650 (year 2017),  Truck Traffic: 20%,  Average Future Daily Traffic: 790 (year 2032),  Features Intersected: WATER ALEWIFE BROOK,  Facility Carried by Structure: HWY HENDERSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $935,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A100144D1DOTNBI,  Location: .4 MI N OF BROADWAY (Lat: 42.414608,  Lng: -71.132461),  Route carried "on" structure: City street ,  Year Built: 1908,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 16,200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,849 (year 2032),  Features Intersected: WATER ALEWIFE BROOK,  Facility Carried by Structure: HWY MYST VAL PKY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 3.6m (11.8ft),  Right: 3.6m (11.8ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Inventory Rating: 67.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2020,  Underwater Inspection Date: March 2020,  Bridge Improvement Cost: $321,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $482,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: A100197XJMUNNBI,  Location: 0.4 MI W OF PARK AVE (Lat: 42.425667,  Lng: -71.189556),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 400 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 790 (year 2013),  Design Load: HS 20,  Features Intersected: OTHER MINUTEMAN BIKE PTH,  Facility Carried by Structure: HWY DRAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 77.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $487,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A100212DMDOTNBI,  Location: 0.5 MI E RT2 & RT60 (Lat: 42.402656,  Lng: -71.156344),  Route carried "on" structure: State highway 2,  Year Built: 1967,  Status: Posted for load,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 78,000 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 123,185 (year 2033),  Design Load: H 20,  Features Intersected: HWY LAKE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 216.195,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.8m (133.9ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.8m (91.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 40.8m (133.9ft),  Out-to-Out Width: 42.7m (140.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $8,890,000,  Roadway Improvement Cost: $890,000,  Total Project Cost: $13,336,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A100232DPDOTNBI,  Location: 0.75 MI W RT 2 & PARK AVE (Lat: 42.415381,  Lng: -71.194267),  Route carried "on" structure: State highway 2,  Year Built: 1967,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 67,100 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 105,971 (year 2033),  Design Load: H 20,  Features Intersected: HWY DOW AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 218.060,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.8m (133.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 40.8m (133.9ft),  Out-to-Out Width: 42.7m (140.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $4,529,000,  Roadway Improvement Cost: $453,000,  Total Project Cost: $6,794,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A100252DQDOTNBI,  Location: 1.2 KM E RT 2 & LAKE ST (Lat: 42.397431,  Lng: -71.143508),  Route carried "on" structure: ServiceUS 2,  Year Built: 1986,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 8,973 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 29,375 (year 2032),  Design Load: HS 20,  Features Intersected: WATER ALEWIFE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Underwater Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A100122DNDOTNBI,  Location: RT 60 AT RT 2 (Lat: 42.416667,  Lng: -71.166667),  Route carried "under" structure: State highway 2,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 53,811 (year 0000),  Features Intersected: ST 2 WB,  Facility Carried by Structure: ST 60
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 212.138,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: A100122DNDOTNBI,  Location: RT 60 AT RT 2 (Lat: 42.416667,  Lng: -71.166667),  Route carried "under" structure: State highway 2,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 53,811 (year 0000),  Features Intersected: ST 2 EB,  Facility Carried by Structure: ST 60
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: L100202KADOTNBI,  Location: 0.75 MI E PLEASANT ST (Lat: 42.416667,  Lng: -71.200000),  Route carried "under" structure: State highway 2,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 38,500 (year 0000),  Features Intersected: ST 2 WB,  Facility Carried by Structure: HWY WATERTOWN ST
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: L100202KADOTNBI,  Location: 0.75 MI E PLEASANT ST (Lat: 42.416667,  Lng: -71.200000),  Route carried "under" structure: State highway 2,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 38,500 (year 0000),  Features Intersected: ST 2 EB,  Facility Carried by Structure: HWY WATERTOWN ST
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)