Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Canton, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 358ft / 109mTotal length
  • $92,614,000Total costs
  • 1,194,933Total average daily traffic
  • 89,003Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Canton
  • No street view available for this location

New bridges in Canton, MA - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 11910-1919
  • 21930-1939
  • 11940-1949
  • 21950-1959
  • 161960-1969
  • 11980-1989
  • 42000-2009
  • 12020-2022
Reconstructed bridges in Canton, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 31990-1999
Average Bridge Daily Traffic in Canton, MA
Average Bridge Truck Traffic in Canton, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.8%Very good
  • 61.9%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.4%Very good
  • 21.7%Good
  • 34.8%Satisfactory
  • 21.7%Fair
  • 4.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.7%Very good
  • 34.8%Good
  • 30.4%Satisfactory
  • 26.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 50.0%Good
  • 16.7%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: C0200136JDOTNBI,  Location: .32 KM.NW OF I 95 (Lat: 42.209208,  Lng: -71.145889),  Route carried "on" structure: Other road ,  Year Built: 1931,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 1,500 (year 2019),  Average Future Daily Traffic: 1,263 (year 2032),  Features Intersected: WATER NEPONSET RIVER,  Facility Carried by Structure: HWY GREENLDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.0m,  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $1,082,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,624,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C02002ADAMUNNBI,  Location: T/LWESTWOOD/NORWOOD (Lat: 42.196944,  Lng: -71.154836),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 3.09m (10.14ft),  Average Daily Traffic: 22,000 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,585 (year 2032),  Design Load: HS 20,  Features Intersected: WATER NEPONSET RIVER,  Facility Carried by Structure: HWY DEDHAM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,082,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,624,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C0200636YDOT634,  Location: .16 KM.E OF CHAPMAN ST (Lat: 42.164981,  Lng: -71.153936),  Route carried "on" structure: City street ,  Year Built: 1888,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.18m (7.15ft),  Average Daily Traffic: 7,000 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,265 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY SPAULDING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.6m (67.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,253,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $4,880,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C02008AE6DOT634,  Location: .16 KM .E OF SHARON T. L (Lat: 42.148061,  Lng: -71.160542),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 20.31m (66.63ft),  Average Daily Traffic: 4,000 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,317 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY HIGH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 91.8m (301.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.40m (66.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $9,425,000,  Roadway Improvement Cost: $943,000,  Total Project Cost: $14,138,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C02009370DOT634,  Location: .32 KM.NE OF NEPONSET ST (Lat: 42.166608,  Lng: -71.154097),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 15,000 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 21,794 (year 2032),  Design Load: H 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY CHAPMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.2m (115.5ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $646,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C0201433FMUNNBI,  Location: W. OF R.R. VIADUCT (Lat: 42.158697,  Lng: -71.154642),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1929,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 23,000 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 32,534 (year 2031),  Features Intersected: WATER E BR NEPONSET RIV,  Facility Carried by Structure: HWY NEPONSET ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.998,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 9 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $757,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C0201533GMUNNBI,  Location: .16 KM S OF REVERE ST. (Lat: 42.154497,  Lng: -71.145631),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 21,200 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 46,747 (year 2031),  Design Load: H 20,  Features Intersected: WATER E BR NEPONSET RIV,  Facility Carried by Structure: HWY WASHNGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 4.0m (13.1ft),  Right: 3.6m (11.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $921,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,382,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C0202033UMUNNBI,  Location: 3.5 KM S OF RT 95 (Lat: 42.146581,  Lng: -71.147578),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 260 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 474 (year 2033),  Design Load: H 15,  Features Intersected: WATER MASSAPOAG BROOK,  Facility Carried by Structure: HWY SHEPARD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.8m (25.6ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 97.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 50.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $973,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,460,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C02024371DOT634,  Location: .16 KM. SE. NEPONSET R. (Lat: 42.196172,  Lng: -71.153928),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 5.07m (16.63ft),  Average Daily Traffic: 17,650 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,953 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY DEDHAM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.7m (71.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,732,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $2,599,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C020268FWDOTNBI,  Location: I 95AT SOUTH END OF ST128 (Lat: 42.210158,  Lng: -71.144492),  Route carried "on" structure: Interstate 95,  Year Built: 2008,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 89,190 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 266,270 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WATER NEPONSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 24.5m (80.4ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 99.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $670,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C020278FTDOTNBI,  Location: I 95AT SOUTH END OF ST128 (Lat: 42.209958,  Lng: -71.144569),  Route carried "on" structure: Interstate 95,  Year Built: 2008,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 87,092 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 266,270 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WATER NEPONSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 24.5m (80.4ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 99.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $670,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C0202836ADOTNBI,  Location: ST 138 AT ST 128 (Lat: 42.203186,  Lng: -71.119275),  Route carried "on" structure: State highway 138,  Year Built: 1955,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 77,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 72,648 (year 2032),  Design Load: HS 20,  Features Intersected: I 93 /US1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.068,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $5,107,000,  Roadway Improvement Cost: $511,000,  Total Project Cost: $7,661,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C0203135BDOTNBI,  Location: .32 KM SW OF NEPONSET ST (Lat: 42.164817,  Lng: -71.176539),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 94,655 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 178,461 (year 2032),  Design Load: HS 20,  Features Intersected: WATER NEPONSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,952,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,929,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C0203135LDOTNBI,  Location: .32 KM SW OF NEPONSET ST (Lat: 42.165042,  Lng: -71.176969),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 65,819 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 178,461 (year 2032),  Design Load: HS 20,  Features Intersected: WATER NEPONSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,360,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C0203335CDOTNBI,  Location: .32 KM SW OF DEDHAM ST (Lat: 42.187589,  Lng: -71.155472),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 98,275 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 181,620 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,680,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $2,521,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C0203335DDOTNBI,  Location: .32 KM SW OF DEDHAM ST (Lat: 42.188206,  Lng: -71.155533),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 98,200 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 181,620 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,680,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $2,521,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C0203436HDOTNBI,  Location: .2 MI.SE OF WESTWOOD T.L. (Lat: 42.192603,  Lng: -71.151167),  Route carried "on" structure: Other road ,  Year Built: 1964,  Status: Open,  Structure Length: 10.27m (33.69ft),  Average Daily Traffic: 15,300 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 33,955 (year 2032),  Design Load: H 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY DEDHAM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,058,000,  Roadway Improvement Cost: $506,000,  Total Project Cost: $7,588,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C0203536MDOTNBI,  Location: .16 KM SW OF ST128 (Lat: 42.204408,  Lng: -71.141806),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 11.40m (37.40ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,474 (year 2032),  Design Load: HS 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY GREENLDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Length Of Structure Improvement: 11.50m (37.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $5,602,000,  Roadway Improvement Cost: $561,000,  Total Project Cost: $8,404,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C0203635HDOTNBI,  Location: I 95 AT ST 128 (Lat: 42.207581,  Lng: -71.140000),  Route carried "on" structure: Interstate 95,  Year Built: 1966,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 32,700 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 173,723 (year 2032),  Design Load: HS 20,  Features Intersected: I 95 /US1/ST128
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.8m (97.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 37.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $9,599,000,  Roadway Improvement Cost: $960,000,  Total Project Cost: $14,399,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C0203635JDOTNBI,  Location: I 95 AT ST 128 (Lat: 42.207861,  Lng: -71.140425),  Route carried "on" structure: Interstate 95,  Year Built: 1966,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 40,100 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 173,723 (year 2032),  Design Load: HS 20,  Features Intersected: I 95 /US1/ST128
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $5,702,000,  Roadway Improvement Cost: $571,000,  Total Project Cost: $8,554,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C02037368DOTNBI,  Location: .16 KM SE OF I 95 (Lat: 42.168700,  Lng: -71.167775),  Route carried "on" structure: City street ,  Year Built: 1963,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 37,000 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 50,380 (year 2033),  Design Load: HS 20,  Features Intersected: WATER NEPONSET RIVER,  Facility Carried by Structure: HWY NEPONSET ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.8m (58.4ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2022,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,786,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $4,180,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C0204233VMUNNBI,  Location: 2.4 KM SE OF RTE. 95 (Lat: 42.154472,  Lng: -71.147083),  Route carried "on" structure: City street ,  Year Built: 1910,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 800 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 790 (year 2031),  Features Intersected: WATER E BR NEPONSET RIV,  Facility Carried by Structure: HWY REVERE CT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 3.3m (10.8ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $1,364,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,047,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C02051BYQMUNNBI,  Location: AT/NEAR NEPONSET STREET (Lat: 42.154719,  Lng: -71.152522),  Route carried "on" structure: City street ,  Year Built: 2020,  Status: Open,  Structure Length: 3.06m (10.04ft),  Design Load: HL 93,  Features Intersected: WATER EB NEPONSET RIVER,  Facility Carried by Structure: HWY REVOLUTION W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.6m (100.4ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C0203436HDOTNBI,  Location: .2 MI.SE OF WESTWOOD T.L. (Lat: 42.200000,  Lng: -71.150000),  Route carried "under" structure: Interstate 95,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 59,750 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY DEDHAM ST
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: C0203436HDOTNBI,  Location: .2 MI.SE OF WESTWOOD T.L. (Lat: 42.200000,  Lng: -71.150000),  Route carried "under" structure: Interstate 95,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 59,750 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY DEDHAM ST
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: C0203536MDOTNBI,  Location: 000065 STATUTORY (Lat: 42.200000,  Lng: -71.150000),  Route carried "under" structure: Interstate 95,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 59,750 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY GRNLDGE ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: C0203536MDOTNBI,  Location: .1 MI.SW OF ST 128 (Lat: 42.200000,  Lng: -71.150000),  Route carried "under" structure: Interstate 95,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 59,750 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY GRNLDGE ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: C0203635HDOTNBI,  Location: I 95 AT ST 128 (Lat: 42.216667,  Lng: -71.150000),  Route carried "under" structure: Interstate 95,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 35,964 (year 0000),  Features Intersected: I 95 SB
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: C0203635JDOTNBI,  Location: I 95 AT ST 128 (Lat: 42.200000,  Lng: -71.133333),  Route carried "under" structure: Interstate 95,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 35,964 (year 0000),  Features Intersected: I 95 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: C0203635JDOTNBI,  Location: I 95 AT ST 128 (Lat: 42.216667,  Lng: -71.150000),  Route carried "under" structure: Interstate 95,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 35,964 (year 0000),  Features Intersected: I 95 SB
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Discuss Canton, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.