Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fairhaven, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 344ft / 105mTotal length
  • $108,574,000Total costs
  • 290,229Total average daily traffic
  • 11,448Total average daily truck traffic
  • 474,103Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fairhaven
  • No street view available for this location

New bridges in Fairhaven, MA - historical statistics
  • New bridges - historical statistics
  • 41900-1909
  • 11920-1929
  • 11960-1969
  • 81970-1979
Reconstructed bridges in Fairhaven, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 01960-1969
  • 11970-1979
  • 01980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Fairhaven, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Very good
  • 28.6%Good
  • 42.9%Satisfactory
  • 21.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Good
  • 28.6%Satisfactory
  • 42.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 57.1%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 85.7%Good
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: F010013JBMUNNBI,  Location: AT NEW BEDFORD LINE (Lat: 41.656131,  Lng: -70.917233),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 14,783 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 48,958 (year 2031),  Design Load: H 20,  Features Intersected: WATER ACUSHNET RIVER,  Facility Carried by Structure: HWY HOWLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,041,000,  Roadway Improvement Cost: $305,000,  Total Project Cost: $4,562,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: F010023PFDOTNBI,  Location: .4 MI W OF NBED (Lat: 41.639158,  Lng: -70.917856),  Route carried "on" structure: US 6,  Year Built: 1900,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 19,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,269 (year 2032),  Design Load: H 15,  Features Intersected: WATER ACUSHNET RIVER
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 44.579,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Navigation Control: Yes ( Vertical Clearance: 1.8m (5.9ft), Horizontal Clearance: 29.0m (95.1ft)),  Material/Design: Steel,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.3m (142.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $7,348,000,  Roadway Improvement Cost: $735,000,  Total Project Cost: $11,023,000 ( Estimate for 2022),  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: F010023PGDOTNBI,  Location: AT NEW BEDFORD CITY LINE (Lat: 41.641592,  Lng: -70.910083),  Route carried "on" structure: US 6,  Year Built: 1901,  Year Reconstructed: 1962,  Status: Open,  Structure Length: 20.60m (67.59ft),  Average Daily Traffic: 21,000 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,269 (year 2032),  Design Load: H 15,  Features Intersected: WATER ACUSHNET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.70m (67.91ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $17,645,000,  Roadway Improvement Cost: $1,765,000,  Total Project Cost: $26,468,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010023PHDOTNBI,  Location: .4 MI W OF NBED C.L. (Lat: 41.639544,  Lng: -70.916758),  Route carried "on" structure: US 6,  Year Built: 1901,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 11.89m (39.01ft),  Average Daily Traffic: 19,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,269 (year 2032),  Design Load: H 15,  Features Intersected: WATER ACUSHNET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.90m (39.04ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $10,144,000,  Roadway Improvement Cost: $1,015,000,  Total Project Cost: $15,217,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010023PJDOTNBI,  Location: .7 MI W OF NBED C.L. (Lat: 41.638142,  Lng: -70.920681),  Route carried "on" structure: US 6,  Year Built: 1901,  Year Reconstructed: 1962,  Status: Posted for load,  Structure Length: 17.83m (58.50ft),  Average Daily Traffic: 19,012 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,269 (year 2032),  Design Load: H 15,  Features Intersected: COMB ACUS RIV/LOC ST/RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.2m (69.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.90m (58.73ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $14,906,000,  Roadway Improvement Cost: $1,491,000,  Total Project Cost: $22,360,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010063JCMUNNBI,  Location: .7 MI E OF SCONTICUT NECK (Lat: 41.596556,  Lng: -70.841667),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 5,900 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,581 (year 2032),  Design Load: H 20,  Features Intersected: WATER NASKETUCKET BAY,  Facility Carried by Structure: HWY GOULART MEM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.271,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 1.5m (4.9ft), Horizontal Clearance: 7.6m (24.9ft)),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 72.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 57.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $452,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010083T6DOTNBI,  Location: AT ACUSHNET RIVER N.B.C.L (Lat: 41.654789,  Lng: -70.917722),  Route carried "on" structure: Interstate 195,  Year Built: 1974,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 52,820 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 78,965 (year 2032),  Design Load: H 20,  Features Intersected: WATER ACUSHNET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.198,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.5m (146.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 36.0m (118.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,692,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $2,539,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010093PWDOTNBI,  Location: 1 MILE W OF ST 240 (Lat: 41.654058,  Lng: -70.908781),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 4.77m (15.65ft),  Average Daily Traffic: 7,114 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,110 (year 2031),  Design Load: H 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.1m (75.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $817,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010103PXDOTNBI,  Location: 1.0 MI W OF ST 240 (Lat: 41.654136,  Lng: -70.906800),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 11,900 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,423 (year 2031),  Design Load: H 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY ADAMS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,467,000,  Roadway Improvement Cost: $347,000,  Total Project Cost: $5,201,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010113T8DOTNBI,  Location: .5 MI W OF ST 240 (Lat: 41.656028,  Lng: -70.897375),  Route carried "on" structure: Interstate 195,  Year Built: 1972,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 52,000 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 67,594 (year 2032),  Design Load: H 20,  Features Intersected: HWY ALDEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.405,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.0m (85.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 35.1m (115.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $773,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,160,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010123PYDOTNBI,  Location: 1M N OF RTE 6 (Lat: 41.658692,  Lng: -70.887744),  Route carried "on" structure: State highway 240,  Year Built: 1972,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 12,100 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 38,061 (year 2031),  Design Load: H 20,  Features Intersected: I 195
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 29.5m (96.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $7,185,000,  Roadway Improvement Cost: $719,000,  Total Project Cost: $10,778,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010133Q0DOTNBI,  Location: .4 MI E OF ST 240 (Lat: 41.659258,  Lng: -70.881408),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 7.69m (25.23ft),  Average Daily Traffic: 1,300 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,053 (year 2031),  Design Load: H 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,614,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $3,922,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F010143T7DOTNBI,  Location: .2 M E OF NEW BEDFORD (Lat: 41.654292,  Lng: -70.913544),  Route carried "on" structure: Interstate 195,  Year Built: 1972,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 51,600 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 78,965 (year 2033),  Design Load: HL 93,  Features Intersected: HWY RIVER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.600,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 24.1m (79.1ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F010153PVDOTNBI,  Location: 1.3 MI E OF ST 240 (Lat: 41.661347,  Lng: -70.862881),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 2,300 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,317 (year 2032),  Design Load: H 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY NEW BOSTN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,716,000,  Roadway Improvement Cost: $272,000,  Total Project Cost: $4,075,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Fairhaven, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.