Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Freetown, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 151ft / 45.5mTotal length
  • $40,795,000Total costs
  • 220,715Total average daily traffic
  • 12,020Total average daily truck traffic
  • 326,127Total future (year 21) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Freetown
  • No street view available for this location

New bridges in Freetown, MA - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 11940-1949
  • 71950-1959
  • 21960-1969
  • 11980-1989
  • 22010-2019
Reconstructed bridges in Freetown, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Freetown, MA
Average Bridge Truck Traffic in Freetown, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 27.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Very good
  • 21.4%Good
  • 50.0%Satisfactory
  • 14.3%Fair
  • 7.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 42.9%Good
  • 35.7%Satisfactory
  • 7.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 71.4%Good
  • 28.6%Satisfactory
Find on map >>   Show street view

Structure Number: F090013X9DOTNBI,  Location: AT JCT WASHBURN RD (Lat: 41.774544,  Lng: -70.958269),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 6,900 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,951 (year 2031),  Features Intersected: WATER FALL BROOK,  Facility Carried by Structure: HWY COUNTY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 84.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,122,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,684,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F090023KPMUNNBI,  Location: .9 MI NE OF RTE 24 (Lat: 41.793894,  Lng: -71.067578),  Route carried "on" structure: City street 79,  Year Built: 1886,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 9,450 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 23,690 (year 2031),  Design Load: H 20,  Features Intersected: WATER ASSONET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $668,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,003,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F090033KQMUNNBI,  Location: .1 MI EAST OF ASSONET CTR (Lat: 41.795572,  Lng: -71.066031),  Route carried "on" structure: City street 79,  Year Built: 1822,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 9,587 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,214 (year 2031),  Design Load: HS 20,  Features Intersected: WATER ASSONET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.892,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 65.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $166,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F090043M6MUNNBI,  Location: .01 MI N OF RTE 79 (Lat: 41.799214,  Lng: -71.060047),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 3,300 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,896 (year 2032),  Design Load: H 20,  Features Intersected: WATER ASSONET RIVER,  Facility Carried by Structure: HWY LOCUST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $956,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: F09005BDCMUNNBI,  Location: @ ST 79 & RR CROSS (Lat: 41.802269,  Lng: -71.052364),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 600 (year 2020),  Design Load: HL 93,  Features Intersected: WATER ASSONET RIVER,  Facility Carried by Structure: HWY FORGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $571,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $857,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F09007418DOT634,  Location: MP QNF 5.65 (Lat: 41.770464,  Lng: -71.098828),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 3,300 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,317 (year 2033),  Design Load: H 20,  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY S MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $204,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $307,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F090083MUDOTNBI,  Location: .7 MI N OF ST 79 (Lat: 41.794497,  Lng: -71.077447),  Route carried "on" structure: State highway 24,  Year Built: 1951,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 55,000 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 67,752 (year 2032),  Design Load: H 20,  Features Intersected: WATER ASSONET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.668,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 29.5m (96.8ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Underwater Inspection Date: Febuary 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $5,678,000,  Roadway Improvement Cost: $568,000,  Total Project Cost: $8,518,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F090103VEDOTNBI,  Location: 1.0 S OF BERKLEY T.L. (Lat: 41.804147,  Lng: -71.076117),  Route carried "on" structure: Other road ,  Year Built: 1951,  Status: Open,  Structure Length: 5.41m (17.75ft),  Average Daily Traffic: 3,150 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,055 (year 2032),  Design Load: H 20,  Features Intersected: ST 24,  Facility Carried by Structure: HWY N MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $2,610,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $3,916,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F090113MTDOTNBI,  Location: ST 24 AT ST 79 (ASSONET) (Lat: 41.785153,  Lng: -71.079892),  Route carried "on" structure: State highway 24,  Year Built: 1951,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 46,745 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 54,486 (year 2032),  Design Load: H 20,  Features Intersected: ST 79 S MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.622,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 35 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 30.8m (101.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 91.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,438,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,158,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F090133X2DOTNBI,  Location: AT COPICUT RD (Lat: 41.778669,  Lng: -71.084217),  Route carried "on" structure: Other road ,  Year Built: 1951,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 642 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,579 (year 2031),  Design Load: H 20,  Features Intersected: ST 24,  Facility Carried by Structure: HWY COPICUT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $965,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,448,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F090173YNDOTNBI,  Location: 1.2 MI S OF LAKEVIL T.L. (Lat: 41.769133,  Lng: -70.961889),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 1968,  Status: Posted for load,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 10,500 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 23,690 (year 2031),  Design Load: H 20,  Features Intersected: ST140,  Facility Carried by Structure: HWY CHACE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.50m (27.89ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $7,258,000,  Roadway Improvement Cost: $726,000,  Total Project Cost: $10,888,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: F090183NNDOTNBI,  Location: 1.0 MI S OF LAKEVIL T.L. (Lat: 41.772892,  Lng: -70.962031),  Route carried "on" structure: State highway 140,  Year Built: 1957,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 33,700 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 51,327 (year 2031),  Design Load: H 20,  Features Intersected: WATER FALL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: November 2020,  Underwater Inspection Date: March 2022,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $214,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F090193NPDOTNBI,  Location: .9 MI S OF LAKEVIL TL (Lat: 41.773594,  Lng: -70.961856),  Route carried "on" structure: State highway 140,  Year Built: 1957,  Status: Open,  Structure Length: 3.92m (12.86ft),  Average Daily Traffic: 16,241 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 25,585 (year 2031),  Design Load: H 20,  Features Intersected: HWY WASHBURN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.023,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,357,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $3,536,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F090223NQDOTNBI,  Location: .9 MI S OF LAKEVIL T L (Lat: 41.773533,  Lng: -70.962317),  Route carried "on" structure: State highway 140,  Year Built: 1968,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 16,900 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,585 (year 2031),  Design Load: H 20,  Features Intersected: HWY WASHBURN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.420,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,006,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $3,010,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F09023AKYDOTNBI,  Location: 1.4 MILES NORTH OF EXIT 8 (Lat: 41.766806,  Lng: -71.097444),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 4,700 (year 2018),  Truck Traffic: 31%,  Design Load: HL 93,  Features Intersected: ST 24 NB & SB,  Facility Carried by Structure: HWY INNOVATION W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.527,  Lanes on structure: 5,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 29.9m (98.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,422,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $2,134,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Discuss Freetown, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.