Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for South Hadley, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 62ft / 18.9mTotal length
  • $9,751,000Total costs
  • 109,113Total average daily traffic
  • 5,644Total average daily truck traffic
  • 163,877Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for South Hadley
  • No street view available for this location

New bridges in South Hadley, MA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 71950-1959
  • 11970-1979
  • 11990-1999
  • 12000-2009
Reconstructed bridges in South Hadley, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in South Hadley, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 50.0%Good
  • 12.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 22.2%Good
  • 22.2%Satisfactory
  • 44.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 33.3%Good
  • 44.4%Satisfactory
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: S180010T0MUNNBI,  Location: BETWEEN RT47 & CONN RIVER (Lat: 42.263239,  Lng: -72.598814),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 2.61m (8.56ft),  Average Daily Traffic: 1,910 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,896 (year 2032),  Design Load: HS 15,  Features Intersected: WATER STONY BROOK,  Facility Carried by Structure: HWY FERRY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,021,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S180020RYMUNNBI,  Location: 1500' S OF PEARL STREET (Lat: 42.278219,  Lng: -72.575564),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 646 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 632 (year 2032),  Design Load: H 20,  Features Intersected: WATER BATCHELOR BROOK,  Facility Carried by Structure: HWY WOODBRDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.1m (36.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $602,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S180050VJDOTNBI,  Location: .3 M S GRANBY-HADLEY T.L. (Lat: 42.277736,  Lng: -72.562106),  Route carried "on" structure: State highway 116,  Year Built: 1956,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 8,534 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,161 (year 2031),  Design Load: H 20,  Features Intersected: WATER BACHELOR BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.183,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 56.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $752,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S180060VHDOTNBI,  Location: .1 M N JCT MOSIER ST. (Lat: 42.246167,  Lng: -72.580694),  Route carried "on" structure: State highway 116,  Year Built: 1950,  Status: Temporarily open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 10,589 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,564 (year 2031),  Design Load: H 20,  Features Intersected: WATER STONY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.101,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.0m (49.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,082,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,624,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S18007AQGDOTNBI,  Location: 1 MILE NORTH OF ST. 116 (Lat: 42.270092,  Lng: -72.587050),  Route carried "on" structure: State highway 47,  Year Built: 2008,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 6,077 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,159 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: WATER BACHELOR BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.648,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.0m (75.5ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 93.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $802,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,204,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S18009ANQMUNNBI,  Location: 1 M E OF RT 116 (Lat: 42.251206,  Lng: -72.559544),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 8,664 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,661 (year 2033),  Design Load: HS 20,  Features Intersected: WATER STONY BROOK,  Facility Carried by Structure: HWY MORGAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $379,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $569,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S180100N1MUNNBI,  Location: .2 MILE EAST OF RTE 116 (Lat: 42.252383,  Lng: -72.573536),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 2,974 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,885 (year 2032),  Design Load: H 15,  Features Intersected: WATER STONY BROOK,  Facility Carried by Structure: HWY MORGAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $446,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S180130VVDOTNBI,  Location: 100' N OF CONN RIVER (Lat: 42.218331,  Lng: -72.605872),  Route carried "on" structure: US 202,  Year Built: 1958,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 23,167 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 36,324 (year 2031),  Design Load: HS 20,  Features Intersected: HWY CANAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.837,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 24.0m (78.7ft),  Out-to-Out Width: 28.9m (94.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $421,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $632,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S180150VUDOTNBI,  Location: .4 M N CONN RIVER (Lat: 42.221775,  Lng: -72.598619),  Route carried "on" structure: US 202,  Year Built: 1958,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 15,300 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 24,163 (year 2031),  Design Load: HS 20,  Features Intersected: HWY BARDWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.625,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.5m (80.4ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 24.5m (80.4ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $447,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $671,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S180160VTDOTNBI,  Location: .9 M N CONN RIVER (Lat: 42.222019,  Lng: -72.589867),  Route carried "on" structure: US 202,  Year Built: 1958,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 14,700 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,216 (year 2031),  Design Load: HS 20,  Features Intersected: ST116 NEWTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.366,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.9m (104.7ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 25.9m (85.0ft),  Out-to-Out Width: 32.9m (107.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $621,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $932,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S180185QBDOTNBI,  Location: 250' W RT 202/116 BRDG (Lat: 42.222083,  Lng: -72.590222),  Route carried "on" structure: US 202,  Year Built: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 16,552 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 23,216 (year 2033),  Design Load: HS 20,  Features Intersected: WATER BUTTERY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.416,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $298,000 ( Estimate for 2022)
Discuss South Hadley, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.