Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Southbridge, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 66ft / 20.2mTotal length
  • $15,826,000Total costs
  • 49,794Total average daily traffic
  • 2,732Total average daily truck traffic
  • 101,707Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Southbridge
  • No street view available for this location

New bridges in Southbridge, MA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 11940-1949
  • 61950-1959
  • 11960-1969
  • 12000-2009
Reconstructed bridges in Southbridge, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Southbridge, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 33.3%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 45.5%Good
  • 27.3%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 54.5%Good
  • 27.3%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 45.5%Good
  • 18.2%Satisfactory
  • 27.3%Fair
Find on map >>   Show street view

Structure Number: S210021Y0DOTNBI,  Location: 300 FT W. OF HAMILTON ST (Lat: 42.081000,  Lng: -72.045422),  Route carried "on" structure: State highway 131,  Year Built: 1910,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 23,920 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 25,269 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: WATER QUINEBAUG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.285,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2020,  Underwater Inspection Date: Febuary 2019
Find on map >>   Show street view

Structure Number: S210031HBMUNNBI,  Location: 200 FT. NORTH OF ST-131 (Lat: 42.081169,  Lng: -72.044161),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Temporarily open,  Structure Length: 2.74m (8.99ft),  Average Future Daily Traffic: 948 (year 2032),  Design Load: H 20,  Features Intersected: WATER QUINEBAUG RIVER,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,380,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $2,071,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S210041D8MUNNBI,  Location: AT CORNER OF RIVER AVE (Lat: 42.083153,  Lng: -72.040808),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 2,600 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,106 (year 2031),  Design Load: HS 20,  Features Intersected: WATER QUINEBAUG RIVER,  Facility Carried by Structure: HWY RIVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: April 2020,  Underwater Inspection Date: March 2019,  Bridge Improvement Cost: $1,340,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,011,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S210051D9MUNNBI,  Location: .3MI. N. OF MAIN ST. (Lat: 42.077872,  Lng: -72.031767),  Route carried "on" structure: City street ,  Year Built: 1904,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 4,938 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 39,419 (year 2031),  Features Intersected: WATER QUINEBAUG RIVER,  Facility Carried by Structure: HWY CENTRAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $702,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $1,054,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S210061YADOTNBI,  Location: O.2 MI. NTH. OF ST-131 (Lat: 42.076917,  Lng: -72.026883),  Route carried "on" structure: State highway 169,  Year Built: 1956,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 7,548 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,424 (year 2032),  Design Load: H 20,  Features Intersected: WATER QUINEBAUG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.601,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2021,  Underwater Inspection Date: January 2019,  Bridge Improvement Cost: $1,851,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: S210091HCMUNNBI,  Location: 300 FT SOUTH OF RIVER ST (Lat: 42.083175,  Lng: -72.043956),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 468 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,642 (year 2033),  Design Load: HS 20,  Features Intersected: WATER MCKINSTRY BROOK,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $799,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,199,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S21010AMAMUNNBI,  Location: .15 MI N OF RTE 131 (Lat: 42.083958,  Lng: -72.044694),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 2,020 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,343 (year 2032),  Design Load: HS 20,  Features Intersected: WATER MCKINSTRY BROOK,  Facility Carried by Structure: HWY PLEASANT ST
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.5m (57.4ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,461,000,  Roadway Improvement Cost: $247,000,  Total Project Cost: $3,692,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S210121DCMUNNBI,  Location: 300 FEET EAST OF ST 169 (Lat: 42.090481,  Lng: -72.021778),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,500 (year 2014),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,369 (year 2033),  Design Load: H 20,  Features Intersected: WATER CADY BROOK,  Facility Carried by Structure: HWY VINTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $563,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: S210131DDMUNNBI,  Location: .1MI. E. OF MECHANIC ST. (Lat: 42.079522,  Lng: -72.026550),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 4,800 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,581 (year 2033),  Design Load: H 20,  Features Intersected: WATER CADY BROOK,  Facility Carried by Structure: HWY CHARLTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $913,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,370,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S210201HDMUNNBI,  Location: 300 FT. E. OF RT-169 (Lat: 42.100161,  Lng: -72.017392),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,579 (year 2032),  Design Load: H 20,  Features Intersected: WATER CADY BROOK,  Facility Carried by Structure: HWY BROOKSIDE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $562,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S210351HFMUNNBI,  Location: 600 FT E OF ST-169 (Lat: 42.081353,  Lng: -72.025897),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,000 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,027 (year 2033),  Design Load: H 20,  Features Intersected: WATER CADY BROOK,  Facility Carried by Structure: HWY RANDOLPH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $527,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Southbridge, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.