Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tyngsborough, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 203ft / 62.1mTotal length
  • $24,650,000Total costs
  • 431,118Total average daily traffic
  • 40,607Total average daily truck traffic
  • 603,466Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tyngsborough
  • No street view available for this location

New bridges in Tyngsborough, MA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 82000-2009
Average Bridge Daily Traffic in Tyngsborough, MA
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 60.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 80.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: T090012ENDOTNBI,  Location: JUST EAST OF MIDDLESEX RD (Lat: 42.676147,  Lng: -71.421200),  Route carried "on" structure: State highway 113,  Year Built: 1930,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 18.00m (59.06ft),  Average Daily Traffic: 31,000 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 35,218 (year 2033),  Design Load: HS 20,  Features Intersected: WATER MERRIMACK RIVER
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 117.892,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 166.7m (546.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 18.10m (59.38ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $9,030,000,  Roadway Improvement Cost: $904,000,  Total Project Cost: $13,546,000 ( Estimate for 2022),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T090022EMDOTNBI,  Location: AT TYNGSBOROUGH BRIDGE (Lat: 42.676208,  Lng: -71.422369),  Route carried "on" structure: State highway 113,  Year Built: 1930,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 22,300 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,741 (year 2033),  Design Load: HS 20,  Features Intersected: RR BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 117.892,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $852,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,279,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T090108HKDOTNBI,  Location: 5.3 MI S OF NH LINE (Lat: 42.658975,  Lng: -71.428197),  Route carried "on" structure: US 3,  Year Built: 2004,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 50,100 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 68,779 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: HWY WESTFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.706,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.8m (94.5ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.7m (133.5ft),  Curb-To-Curb Width: 28.8m (94.5ft),  Out-to-Out Width: 29.8m (97.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $740,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T090108HLDOTNBI,  Location: 3.3 MI S OF NH LINE (Lat: 42.658750,  Lng: -71.428406),  Route carried "on" structure: US 3,  Year Built: 2004,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 60,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 68,779 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: HWY WESTFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.706,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.7m (133.5ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 23.7m (77.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 98.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $587,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T090118HHDOTNBI,  Location: 1.5 MI. N OF RTE 40 (Lat: 42.651539,  Lng: -71.422031),  Route carried "on" structure: US 3,  Year Built: 2004,  Status: Open,  Structure Length: 4.50m (14.76ft),  Average Daily Traffic: 82,679 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 123,027 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: HWY DUNSTABLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 136.791,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.7m (143.4ft),  Curb-To-Curb Width: 22.0m (72.2ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 60.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $416,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $625,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T090118HJDOTNBI,  Location: 1.5 MI. N. OF RTE 40 (Lat: 42.651708,  Lng: -71.422631),  Route carried "on" structure: US 3,  Year Built: 2004,  Status: Open,  Structure Length: 4.90m (16.08ft),  Average Daily Traffic: 77,900 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 123,027 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: HWY DUNSTABLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 136.791,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.7m (156.5ft),  Curb-To-Curb Width: 22.0m (72.2ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 60.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $452,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $679,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T09014AYDDOTNBI,  Location: RT 113 AT RT 3 (Lat: 42.680344,  Lng: -71.441225),  Route carried "on" structure: State highway 113,  Year Built: 2004,  Status: Open,  Structure Length: 9.06m (29.72ft),  Average Daily Traffic: 13,448 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,743 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: US 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.298,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 20.0m (65.6ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.3m (145.3ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 20.0m (65.6ft),  Out-to-Out Width: 22.5m (73.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 87.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.10m (29.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,802,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $2,704,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T090216G9DOTNBI,  Location: 1.1 MI S NEW HAMP. LINE (Lat: 42.685906,  Lng: -71.442539),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 7.34m (24.08ft),  Average Daily Traffic: 3,491 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,332 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: US 3,  Facility Carried by Structure: HWY LOCUST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.2m (33.5ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.8m (117.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 97.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,233,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $3,350,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T0902284YDOTNBI,  Location: 0.25 M SLY N.H. LINE (Lat: 42.697592,  Lng: -71.447703),  Route carried "on" structure: US 3,  Year Built: 2004,  Status: Open,  Structure Length: 3.74m (12.27ft),  Average Daily Traffic: 48,000 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 67,910 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: US 3 SB CONNECTOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.1m (75.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 23.1m (75.8ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $544,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T09022854DOTNBI,  Location: 0.25 MI SLY NH LINE (Lat: 42.697242,  Lng: -71.447872),  Route carried "on" structure: US 3,  Year Built: 2004,  Status: Open,  Structure Length: 4.19m (13.75ft),  Average Daily Traffic: 42,200 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 67,910 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: US 3 SB CONNECTOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.3m (132.2ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 97.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $596,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Tyngsborough, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.