Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wakefield, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 95ft / 29.1mTotal length
  • $52,684,000Total costs
  • 1,067,539Total average daily traffic
  • 76,638Total average daily truck traffic
  • 1,597,085Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wakefield
  • No street view available for this location

New bridges in Wakefield, MA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 61940-1949
  • 41950-1959
  • 11970-1979
  • 12000-2009
Reconstructed bridges in Wakefield, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 51950-1959
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Wakefield, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 30.0%Good
  • 20.0%Satisfactory
  • 50.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Good
  • 54.5%Satisfactory
  • 18.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Good
  • 63.6%Satisfactory
  • 18.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: B110112TYDOTNBI,  Location: 0.3 MI E OF ST-97/1A (Lat: 42.575333,  Lng: -70.885033),  Route carried "on" structure: State highway 128,  Year Built: 1948,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 72,449 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 72,427 (year 2032),  Design Load: HS 20,  Features Intersected: COMB MBTA & TOZER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.155,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 31.1m (102.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,520,000,  Roadway Improvement Cost: $453,000,  Total Project Cost: $6,781,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B11013309DOTNBI,  Location: 0.2 MI E OF BRIMBAL (Lat: 42.573347,  Lng: -70.855889),  Route carried "on" structure: State highway 22,  Year Built: 1948,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 3.40m (11.15ft),  Average Daily Traffic: 20,200 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,056 (year 2032),  Design Load: H 20,  Features Intersected: ST128
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.522,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,145,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $3,218,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: W01001AL9DOT634,  Location: JUST OFF MAIN ST (Lat: 42.489844,  Lng: -71.069450),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,422 (year 2019),  Average Future Daily Traffic: 2,211 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY MERIAM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,749,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $2,624,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W010042P2DOT634,  Location: JUST OFF MYRTLE AVE (Lat: 42.477722,  Lng: -71.065514),  Route carried "on" structure: City street ,  Year Built: 1919,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 2,069 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,211 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY COOPER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.0m (65.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,349,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,024,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W010082FJDOTNBI,  Location: 0.3 MI WLY SAUGUS RIVER (Lat: 42.513100,  Lng: -71.041353),  Route carried "on" structure: Interstate 95,  Year Built: 1948,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 135,000 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 213,206 (year 2032),  Design Load: H 20,  Features Intersected: HWY PLEASURE ISLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.928,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 34.1m (111.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,144,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $3,217,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W010132FEDOTNBI,  Location: 1.2 MI ELY RT 129 (Lat: 42.522758,  Lng: -71.058514),  Route carried "on" structure: Interstate 128,  Year Built: 1948,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 127,837 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 212,258 (year 2032),  Design Load: H 20,  Features Intersected: RR BMRR/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.728,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 42.7m (140.1ft),  Out-to-Out Width: 47.7m (156.5ft)

Condition: Culverts: Fair,  Inventory Rating: 63.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,032,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,549,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W010152FLDOTNBI,  Location: RT 128 AT RT 129 WB (Lat: 42.525600,  Lng: -71.079481),  Route carried "on" structure: Interstate 95,  Year Built: 1949,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 137,985 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 214,785 (year 2031),  Design Load: H 20,  Features Intersected: ST129 WB MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.742,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 44.5m (146.0ft),  Out-to-Out Width: 46.9m (153.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 38.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,869,000,  Roadway Improvement Cost: $387,000,  Total Project Cost: $5,804,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W010162FKDOTNBI,  Location: RT 128 AT RT 129 EB (Lat: 42.524622,  Lng: -71.082078),  Route carried "on" structure: Interstate 95,  Year Built: 1949,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 137,985 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 215,417 (year 2031),  Design Load: H 20,  Features Intersected: ST129 EB LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.742,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 44.5m (146.0ft),  Out-to-Out Width: 46.9m (153.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,238,000,  Roadway Improvement Cost: $424,000,  Total Project Cost: $6,358,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W010182FHDOTNBI,  Location: 1.4 MI NELY RT 28 (Lat: 42.516744,  Lng: -71.089567),  Route carried "on" structure: Interstate 128,  Year Built: 1950,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 134,371 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 218,575 (year 2033),  Design Load: H 20,  Features Intersected: HWY NORTH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.680,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 45.1m (148.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $4,075,000,  Roadway Improvement Cost: $408,000,  Total Project Cost: $6,113,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W010192FGDOTNBI,  Location: 1.2 MI NELY RT 28 (Lat: 42.514450,  Lng: -71.090533),  Route carried "on" structure: Interstate 95,  Year Built: 1950,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 144,478 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 214,627 (year 2033),  Design Load: H 20,  Features Intersected: RR MBTA/BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.730,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 42.7m (140.1ft),  Out-to-Out Width: 46.1m (151.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,622,000,  Roadway Improvement Cost: $363,000,  Total Project Cost: $5,434,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W010202FFDOTNBI,  Location: 0.9 MI NELY RT 28 (Lat: 42.510583,  Lng: -71.092614),  Route carried "on" structure: Interstate 128,  Year Built: 1959,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 148,200 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 210,837 (year 2031),  Design Load: H 20,  Features Intersected: HWY PARKER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.928,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 42.1m (138.1ft),  Out-to-Out Width: 45.1m (148.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,366,000,  Roadway Improvement Cost: $337,000,  Total Project Cost: $5,050,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W010212MFDOTNBI,  Location: 0.3 MI NELY RT 28 (Lat: 42.504978,  Lng: -71.098167),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 5,043 (year 2019),  Average Future Daily Traffic: 5,685 (year 2032),  Design Load: H 20,  Features Intersected: I 95 /ST128,  Facility Carried by Structure: HWY HOPKINS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,656,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $3,985,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: W010282DCMUNNBI,  Location: .16 KM. S. OF RT. 129 (Lat: 42.498381,  Lng: -71.046769),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 790 (year 2031),  Design Load: H 20,  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY WILEY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.50m (1.64ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $527,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Wakefield, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.