Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Woburn, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 492ft / 150mTotal length
  • $94,683,000Total costs
  • 1,551,481Total average daily traffic
  • 106,378Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Woburn
  • No street view available for this location

New bridges in Woburn, MA - historical statistics
  • New bridges - historical statistics
  • 41940-1949
  • 111950-1959
  • 31960-1969
  • 11970-1979
  • 11980-1989
  • 22000-2009
  • 12020-2022
Reconstructed bridges in Woburn, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 71950-1959
  • 41960-1969
Average Bridge Daily Traffic in Woburn, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.8%Good
  • 31.6%Satisfactory
  • 47.4%Fair
  • 5.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.8%Very good
  • 19.0%Good
  • 28.6%Satisfactory
  • 42.9%Fair
  • 4.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.8%Very good
  • 28.6%Good
  • 19.0%Satisfactory
  • 42.9%Fair
  • 4.8%Poor
Find on map >>   Show street view

Structure Number: W430022P0DOT634,  Location: 0.75 MI W RTE 93 & MNTVLE (Lat: 42.480350,  Lng: -71.126803),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 35,700 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 54,802 (year 2031),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY MONTVALE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,312,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,969,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W430038RCDOTNBI,  Location: 1.9 KM S RTE 93 (Lat: 42.488861,  Lng: -71.133056),  Route carried "on" structure: City street ,  Year Built: 2021,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 25,000 (year 2016),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY SALEM ST
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: W430042NYDOT634,  Location: 1.6 KM W RT 93 & RT 128 (Lat: 42.503519,  Lng: -71.137169),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 35,560 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 48,958 (year 2033),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY MISHAWUM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $238,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W430222F8DOTNBI,  Location: RT 128 AT RT 38 (Lat: 42.499183,  Lng: -71.158100),  Route carried "on" structure: Interstate 128,  Year Built: 1949,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 85,675 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 281,115 (year 2031),  Design Load: H 20,  Features Intersected: ST 38 SB/MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.077,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,001,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $6,002,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W430222F9DOTNBI,  Location: RT 128 AT RT 38 (Lat: 42.499411,  Lng: -71.158092),  Route carried "on" structure: Interstate 128,  Year Built: 1949,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 89,701 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 281,115 (year 2031),  Design Load: H 20,  Features Intersected: ST 38 SB/MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.077,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,090,000,  Roadway Improvement Cost: $310,000,  Total Project Cost: $4,636,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W430242FADOTNBI,  Location: 1 MI NE RT 128 & RT 3A (Lat: 42.500431,  Lng: -71.148542),  Route carried "on" structure: Interstate 128,  Year Built: 1950,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 88,500 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 280,326 (year 2031),  Design Load: H 20,  Features Intersected: HWY FOREST PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.876,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,448,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $5,173,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W430242FBDOTNBI,  Location: 1 MI NE RT 128 & RT 3A (Lat: 42.500656,  Lng: -71.148636),  Route carried "on" structure: Interstate 128,  Year Built: 1950,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 88,000 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 280,326 (year 2031),  Design Load: H 20,  Features Intersected: HWY FOREST PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.876,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 19.0m (62.3ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,448,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $5,173,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W430252MDDOTNBI,  Location: 1 MI NE RTE 38 (Lat: 42.501375,  Lng: -71.142194),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 13,700 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 39,482 (year 2032),  Design Load: H 20,  Features Intersected: I 95 /ST128,  Facility Carried by Structure: HWY MISHAWUM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $6,705,000,  Roadway Improvement Cost: $671,000,  Total Project Cost: $10,058,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W430262FCDOTNBI,  Location: 1.6 KM W RT 93 & RT 95 (Lat: 42.502114,  Lng: -71.136528),  Route carried "on" structure: Interstate 128,  Year Built: 1950,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 169,500 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 284,906 (year 2031),  Design Load: H 20,  Features Intersected: RR MBTA/BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.885,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.7m (140.1ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 42.7m (140.1ft),  Out-to-Out Width: 44.9m (147.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $6,702,000,  Roadway Improvement Cost: $671,000,  Total Project Cost: $10,054,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W430282LBDOTNBI,  Location: 0.5 MI W I 93 (Lat: 42.502875,  Lng: -71.126458),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Posted for load,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 45,000 (year 2017),  Truck Traffic: 14%,  Average Future Daily Traffic: 120,027 (year 2032),  Design Load: H 20,  Features Intersected: I 95 /ST128,  Facility Carried by Structure: HWY WASHNGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.540,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 45.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,119,000,  Roadway Improvement Cost: $312,000,  Total Project Cost: $4,679,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W430312F6DOTNBI,  Location: RT 128 AT RT 38 (Lat: 42.499433,  Lng: -71.156208),  Route carried "on" structure: Interstate 95,  Year Built: 1949,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 77,200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 259,005 (year 2033),  Design Load: H 20,  Features Intersected: ST 38 WB/MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.228,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 84.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $789,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,184,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W430312F7DOTNBI,  Location: RT 128 AT RT 38 (Lat: 42.499650,  Lng: -71.156267),  Route carried "on" structure: Interstate 95,  Year Built: 1949,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 83,200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 252,688 (year 2033),  Design Load: H 20,  Features Intersected: ST 38 WB/MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.228,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 84.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $789,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,184,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W430352MEDOTNBI,  Location: 0.7 MI S RTE 128 (Lat: 42.490819,  Lng: -71.117792),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 15,400 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,690 (year 2032),  Design Load: H 20,  Features Intersected: I 93,  Facility Carried by Structure: HWY SALEM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,271,000,  Roadway Improvement Cost: $428,000,  Total Project Cost: $6,407,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W430362J3DOTNBI,  Location: 2 MI S RT 128 (Lat: 42.479992,  Lng: -71.114931),  Route carried "on" structure: Interstate 93,  Year Built: 1958,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 208,231 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 268,481 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY MONTVALE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.978,  Lanes on structure: 8,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.6m (129.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 39.6m (129.9ft),  Out-to-Out Width: 51.6m (169.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $11,148,000,  Roadway Improvement Cost: $1,115,000,  Total Project Cost: $16,723,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W430372J1DOTNBI,  Location: 0.1 MI S MONTVALE AVE (Lat: 42.478731,  Lng: -71.114047),  Route carried "on" structure: Interstate 93,  Year Built: 1958,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 145,900 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 268,481 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OTHER TRI COMMUNITY GREE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.003,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 55.9m (183.4ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 48.2m (158.1ft),  Out-to-Out Width: 48.6m (159.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $631,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W430392J0DOTNBI,  Location: 0.1 MI S MONTVALE AVE (Lat: 42.478639,  Lng: -71.113494),  Route carried "on" structure: Ramp Interstate 93,  Year Built: 1958,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 9,700 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 31,902 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OTHER TRI COMMUNITY GREE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.003,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $130,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $196,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W430402J2DOTNBI,  Location: 0.1 MI S MONTVALE AVE (Lat: 42.478625,  Lng: -71.114375),  Route carried "on" structure: Ramp Interstate 93,  Year Built: 1958,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 6,100 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 22,110 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OTHER TRI COMMUNITY GREE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.003,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $637,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W430412KHDOTNBI,  Location: 0.2 MI W RTE 93 (Lat: 42.479653,  Lng: -71.118033),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 39,100 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 65,857 (year 2032),  Design Load: H 20,  Features Intersected: WATER ABERJONA RIVER,  Facility Carried by Structure: HWY MONTVALE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.4m (63.6ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 94.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 57.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: March 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $845,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,268,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W430442CLDOT634,  Location: 1.1 KM W STONEHAM (Lat: 42.498739,  Lng: -71.134961),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 13,375 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 25,743 (year 2031),  Design Load: H 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY OLYMPIA AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,695,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $4,043,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W43047AFVDOTNBI,  Location: COMMERCE WAY (Lat: 42.520700,  Lng: -71.133578),  Route carried "on" structure: Ramp Interstate 93,  Year Built: 2000,  Status: Open,  Structure Length: 36.08m (118.37ft),  Average Daily Traffic: 9,075 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,056 (year 2032),  Design Load: HS 20,  Features Intersected: I 93
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 48.7m (159.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 36.10m (118.44ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $4,085,000,  Roadway Improvement Cost: $409,000,  Total Project Cost: $6,128,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W43048AGBDOTNBI,  Location: COMMERCE WAY (Lat: 42.520089,  Lng: -71.132986),  Route carried "on" structure: Ramp Interstate 93,  Year Built: 2000,  Status: Open,  Structure Length: 48.88m (160.37ft),  Average Daily Traffic: 4,564 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,847 (year 2032),  Design Load: HS 20,  Features Intersected: I 93 & NB ON RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 48.7m (159.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 48.90m (160.43ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $5,533,000,  Roadway Improvement Cost: $554,000,  Total Project Cost: $8,300,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W430352MEDOTNBI,  Location: 0.75 MI S RT 128 (Lat: 42.483333,  Lng: -71.116667),  Route carried "under" structure: Interstate 93,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 131,650 (year 0000),  Features Intersected: I 93 NB,  Facility Carried by Structure: HWY SALEM ST
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: W430352MEDOTNBI,  Location: 0.75 MI S RT 128 (Lat: 42.483333,  Lng: -71.116667),  Route carried "under" structure: Interstate 93,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 131,650 (year 0000),  Features Intersected: I 93 NB,  Facility Carried by Structure: HWY SALEM ST
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Discuss Woburn, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.