Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Eldorado at Santa Fe, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 131ft / 39.8mTotal length
  • $4,359,000Total costs
  • 199,831Total average daily traffic
  • 23,558Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Eldorado at Santa Fe
  • No street view available for this location

New bridges in Eldorado at Santa Fe, NM - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 11940-1949
  • 111970-1979
  • 61990-1999
Reconstructed bridges in Eldorado at Santa Fe, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 01980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Eldorado at Santa Fe, NM
Average Bridge Truck Traffic in Eldorado at Santa Fe, NM
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 66.7%Good
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 37.5%Good
  • 37.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 6.3%Very good
  • 62.5%Good
  • 31.3%Satisfactory
Find on map >>   Show street view

Structure Number: 386,  Location: 0.6 MI S OF JCT I-25/285 (Lat: 35.546836,  Lng: -105.882958),  Route carried "on" structure: US 285,  Year Built: 1939,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 9,715 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,771 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 466.548,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.0m (6.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $181,000 ( Estimate for 2030),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3861,  Location: 3.0 MI S OF JCT I-25 (Lat: 35.511564,  Lng: -105.896328),  Route carried "on" structure: US 285,  Year Built: 1939,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 2.57m (8.43ft),  Average Daily Traffic: 10,768 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,310 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 462.381,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.4m (83.3ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $297,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 3862,  Location: 3.6 MI S OF JCT I-25 (Lat: 35.503047,  Lng: -105.899558),  Route carried "on" structure: US 285,  Year Built: 1939,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 10,768 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,310 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 461.560,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.0m (6.6ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $91,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 4778,  Location: 2.95 MI S OF JCT I-25 (Lat: 35.513256,  Lng: -105.895686),  Route carried "on" structure: US 285,  Year Built: 1939,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 10,768 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,310 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 463.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.0m (6.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $127,000 ( Estimate for 2030),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5311,  Location: 0.20 MI S OF US-285 (Lat: 35.555131,  Lng: -105.875139),  Route carried "on" structure: State highway 300,  Year Built: 1946,  Status: Open,  Structure Length: 2.66m (8.73ft),  Average Daily Traffic: 1,554 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,563 (year 2040),  Design Load: HS 20,  Features Intersected: CANADA DE LOS ALAMOS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.461,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 7241,  Location: 1.05 MI S OF JCT US-285 (Lat: 35.567736,  Lng: -105.887906),  Route carried "on" structure: Interstate 25,  Year Built: 1972,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 21,239 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 39,598 (year 2040),  Design Load: HS 20,  Features Intersected: ANCHO CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 465.583,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2017
Find on map >>   Show street view

Structure Number: 7242,  Location: 1.07 MI S OF JCT US-285 (Lat: 35.569100,  Lng: -105.887700),  Route carried "on" structure: Interstate 25,  Year Built: 1972,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 21,239 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 39,598 (year 2040),  Design Load: HS 20,  Features Intersected: ANCHO CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 465.582,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2017,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 7243,  Location: JUNCTION I-25/US-285 (Lat: 35.554342,  Lng: -105.877450),  Route carried "on" structure: Ramp US 84,  Year Built: 1972,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 690 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 1,025 (year 2038),  Design Load: HS 20,  Features Intersected: CANADA DE LOS ALAMOS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 467.685,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 48.8m (160.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,215,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,823,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 7277,  Location: JUNCTION I-25 / US 285 (Lat: 35.554564,  Lng: -105.878883),  Route carried "on" structure: Interstate 25,  Year Built: 1972,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 12,508 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 21,412 (year 2040),  Design Load: HS 20,  Features Intersected: US 285
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 467.514,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.32m (27.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $630,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7278,  Location: JUNCTION I-25 / US 285 (Lat: 35.554783,  Lng: -105.878683),  Route carried "on" structure: Interstate 25,  Year Built: 1972,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 12,508 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 21,412 (year 2040),  Design Load: HS 20,  Features Intersected: US 285
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 467.514,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.32m (27.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $610,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7374,  Location: 5.78MN Jct I-25 StFrancis (Lat: 35.579978,  Lng: -105.899483),  Route carried "on" structure: State highway 2107,  Year Built: 1975,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 67 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 125 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.011,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7566,  Location: 1.86 MI S OF JCT US-285 (Lat: 35.578947,  Lng: -105.897714),  Route carried "on" structure: Interstate 25,  Year Built: 1974,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 21,239 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 39,598 (year 2040),  Design Load: HS 20,  Features Intersected: CANADA ANCHA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 464.408,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2017
Find on map >>   Show street view

Structure Number: 7567,  Location: 1.60 MI S OF JCT US-285 (Lat: 35.574439,  Lng: -105.895442),  Route carried "on" structure: Interstate 25,  Year Built: 1974,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 21,239 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 39,598 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 464.777,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 9694,  Location: 0.01 M W JCt US-285 (Lat: 35.548750,  Lng: -105.883344),  Route carried "on" structure: County highway 4901,  Year Built: 1999,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 4,209 (year 2040),  Design Load: HS 20,  Features Intersected: Unnamed Waterway,  Facility Carried by Structure: Avenida Amistad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Out-to-Out Width: 33.8m (110.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 9695,  Location: 0.01 M W JCt US-285 (Lat: 35.537053,  Lng: -105.888006),  Route carried "on" structure: County highway 4901,  Year Built: 1999,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,317 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,362 (year 2040),  Design Load: HS 20,  Features Intersected: Unnamed Waterway,  Facility Carried by Structure: Ave Vista Grande
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 9696,  Location: 3.3 M W Jct US-285 (Lat: 35.549256,  Lng: -105.944906),  Route carried "on" structure: County highway 4901,  Year Built: 1999,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 270 (year 2020),  Average Future Daily Traffic: 431 (year 2040),  Features Intersected: Unnamed Waterway,  Facility Carried by Structure: Ave De Compadres
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 9697,  Location: 4.2 M W Jct US-285 (Lat: 35.553700,  Lng: -105.961483),  Route carried "on" structure: County highway 4901,  Year Built: 1999,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 701 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,664 (year 2040),  Design Load: HS 20,  Features Intersected: Unnamed Waterway,  Facility Carried by Structure: Avenida Azul
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 9698,  Location: 2.8 M W Jct US-285 (Lat: 35.522689,  Lng: -105.938797),  Route carried "on" structure: County highway 4901,  Year Built: 1999,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 853 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,238 (year 2040),  Design Load: HS 20,  Features Intersected: Unnamed Waterway,  Facility Carried by Structure: Avenida El Dorado
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.506,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 9699,  Location: 0.1 Miles W. Jct. 84/285 (Lat: 35.529700,  Lng: -105.893119),  Route carried "on" structure: County highway 4900,  Year Built: 1995,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 853 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,238 (year 2040),  Design Load: HS 20,  Features Intersected: Unnamed waterway,  Facility Carried by Structure: Avenida El Dorado
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 7277,  Location: JUNCTION I-25 / US 285 (Lat: 35.554564,  Lng: -105.878883),  Route carried "under" structure: US 285,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 8,198 (year 2020),  Truck Traffic: 8%,  Features Intersected: US 285,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 467.353,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 7278,  Location: JUNCTION I-25 / US 285 (Lat: 35.554783,  Lng: -105.878683),  Route carried "under" structure: US 285,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 8,198 (year 2020),  Truck Traffic: 8%,  Features Intersected: US 285,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 467.353,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 7374,  Location: 5.78MN Jct I-25 StFrancis (Lat: 35.579978,  Lng: -105.899483),  Route carried "under" structure: Interstate 25,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 21,239 (year 2020),  Truck Traffic: 5%,  Features Intersected: I-25 NBL,  Facility Carried by Structure: FR2107
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 463.974,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Discuss Eldorado at Santa Fe, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.