Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Lewis, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 37Number of bridges
  • 289ft / 87.5mTotal length
  • $45,212,000Total costs
  • 353,833Total average daily traffic
  • 38,600Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Lewis
  • No street view available for this location

New bridges in Fort Lewis, WA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 151950-1959
  • 71960-1969
  • 11980-1989
  • 51990-1999
  • 42000-2009
  • 22010-2019
Reconstructed bridges in Fort Lewis, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 01970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Fort Lewis, WA
Average Bridge Truck Traffic in Fort Lewis, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 60.0%Good
  • 35.0%Satisfactory
  • 5.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Very good
  • 50.0%Good
  • 45.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Very good
  • 80.0%Good
  • 5.0%Satisfactory
  • 5.0%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 64.0%Good
  • 12.0%Satisfactory
  • 4.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 15.4%Very good
  • 38.5%Good
  • 30.8%Satisfactory
  • 15.4%Poor
Find on map >>   Show street view

Structure Number: 4495A,  Location: 6.1 N THURSTON CO (Lat: 47.104194,  Lng: -122.588722),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 59,804 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 86,596 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: 41ST DIVISION DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 194.521,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.79m (15.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,758,000,  Roadway Improvement Cost: $352,000,  Total Project Cost: $3,517,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4495B,  Location: 6.1 N THURSTON CO (Lat: 47.104333,  Lng: -122.588778),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1954,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 7,285 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,548 (year 2039),  Design Load: HS 20,  Features Intersected: 41ST DIVISION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 26.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.79m (15.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,476,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $2,952,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5394B,  Location: 4.4 N THURSTON CO (Lat: 47.095194,  Lng: -122.616889),  Route carried "on" structure: Interstate 5,  Year Built: 1957,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 128,390 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 185,908 (year 2039),  Design Load: HS 20,  Features Intersected: PENDLETON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.123,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 34.7m (113.8ft),  Out-to-Out Width: 36.3m (119.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $952,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $1,903,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8580A,  Location: 6.1 N THURSTON CO (Lat: 47.104000,  Lng: -122.588611),  Route carried "on" structure: Interstate 5,  Year Built: 1969,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 59,804 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 86,596 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: 41ST DIVISION DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 194.521,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,848,000,  Roadway Improvement Cost: $370,000,  Total Project Cost: $3,696,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8580B,  Location: 6.1 N THURSTON CO (Lat: 47.103872,  Lng: -122.588547),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1969,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 5,539 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,020 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: 41ST DIVISION DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,617,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $3,234,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80852,  Location: .4 S JCT SR 507 (Lat: 47.079722,  Lng: -122.443333),  Route carried "on" structure: County highway 94110,  Year Built: 1965,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 4,025 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,650 (year 2040),  Design Load: H 15,  Features Intersected: TACOMA RAIL MTN DIV OC,  Facility Carried by Structure: 8 AV S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,125,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $2,500,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82768,  Location: 2.8 S JCT SR 507 (Lat: 47.042778,  Lng: -122.443333),  Route carried "on" structure: County highway 94110,  Year Built: 1947,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,450 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,350 (year 2040),  Design Load: H 15,  Features Intersected: MUCK CREEK,  Facility Carried by Structure: 8 AV S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $638,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,277,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 87173,  Location: 1.1 S JCT SR 5 (Lat: 47.072458,  Lng: -122.694306),  Route carried "on" structure: County highway 91050,  Year Built: 2004,  Status: Open,  Structure Length: 19.57m (64.21ft),  Average Daily Traffic: 13,225 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 22,000 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BNSF RAILROAD OVERPASS,  Facility Carried by Structure: NISQUALLY RD SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 58.5m (191.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.87m (65.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $13,040,000,  Roadway Improvement Cost: $2,608,000,  Total Project Cost: $26,080,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: AFWAPQWY00001,  Location: WEST OF BRIDGE 84010 (Lat: 47.142389,  Lng: -122.493800),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 3,000 (year 2018),  Truck Traffic: 50%,  Average Future Daily Traffic: 3,000 (year 2043),  Design Load: HS 20,  Features Intersected: CLOVER CREEK,  Facility Carried by Structure: BARNES BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: Army,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: AFWAPQWY00002,  Location: GRID COORD ET384211 (Lat: 47.142289,  Lng: -122.492600),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 100 (year 2042),  Features Intersected: CLOVER CREEK,  Facility Carried by Structure: B STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: AFWAPQWY00003,  Location: GRID COORD ET388204 (Lat: 47.136639,  Lng: -122.488200),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Closed,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 1 (year 2016),  Average Future Daily Traffic: 4 (year 2040),  Features Intersected: CLOVER CREEK,  Facility Carried by Structure: C STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.5m (57.4ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.45m (8.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: AFWAPQWY00004,  Location: GRID COORD ET389203 (Lat: 47.135481,  Lng: -122.486300),  Route carried "on" structure: Other road ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 100 (year 2042),  Design Load: H 20,  Features Intersected: CLOVER CREEK,  Facility Carried by Structure: F STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 92.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 71.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: AFWAPQWY00005,  Location: GRID COORD ET385210 (Lat: 47.141581,  Lng: -122.491700),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Posted for load,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 1,000 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,500 (year 2042),  Design Load: HS 20,  Features Intersected: CLOVER CREEK,  Facility Carried by Structure: LEVITOW BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.45m (11.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $5,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: AFWAPQWY00007,  Location: GRID COORD ET403207 (Lat: 47.138600,  Lng: -122.468400),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 100 (year 2042),  Design Load: HS 20,  Features Intersected: CLOVER CREEK,  Facility Carried by Structure: PERIMETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.47m (4.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DANFORLEW000013,  Location: GRID COORD ET302056 (Lat: 47.003281,  Lng: -122.601600),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 10 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 10 (year 2042),  Features Intersected: MUCK CREEK,  Facility Carried by Structure: ELLSWORTH WDS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.0m (39.4ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPAFBCOR084009,  Location: GRID COORD ET391202 (Lat: 47.134600,  Lng: -122.483200),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 100 (year 2042),  Design Load: H 20,  Features Intersected: CLOVER CREEK,  Facility Carried by Structure: MCCARTHY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 94.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 73.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORLEW000001,  Location: GRID COORD ET275180 (Lat: 47.116400,  Lng: -122.635400),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 220 (year 2042),  Features Intersected: DRAINAGE CANAL,  Facility Carried by Structure: WHARF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORLEW000002,  Location: GRID COORD ET274191 (Lat: 47.123850,  Lng: -122.637000),  Route carried "on" structure: Other road ,  Year Built: 1954,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 220 (year 2042),  Features Intersected: DRAINAGE CANAL,  Facility Carried by Structure: SOLO POINT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORLEW000006,  Location: GRID COORD ET355067 (Lat: 47.013469,  Lng: -122.533100),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 220 (year 2042),  Features Intersected: MUCK CREEK,  Facility Carried by Structure: CHAMBERS LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 24.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORLEW000007,  Location: GRID COORD ET395088 (Lat: 47.031969,  Lng: -122.480500),  Route carried "on" structure: Other road ,  Year Built: 1966,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 220 (year 2042),  Features Intersected: MUCK CREEK,  Facility Carried by Structure: VIETNAM VILLAGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: DAPFORLEW000008,  Location: GRID COORD ET378097 (Lat: 47.039800,  Lng: -122.502400),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,000 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,200 (year 2043),  Features Intersected: JOHNSON CREEK,  Facility Carried by Structure: E. GATE RD/TANK TR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: Army,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: DAPFORLEW000009,  Location: GRID COORD ET338057 (Lat: 47.005781,  Lng: -122.557100),  Route carried "on" structure: Other road ,  Year Built: 1994,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 500 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 600 (year 2042),  Features Intersected: MUCK CREEK,  Facility Carried by Structure: 33RD DIV & TANK TR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: Army,  Approaching Roadway Width: 9.5m (31.2ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: DAPFORLEW00001,  Location: GRID COORD ET280038 (Lat: 46.987381,  Lng: -122.632100),  Route carried "on" structure: Other road ,  Year Built: 1953,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 7.70m (25.26ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 200 (year 2042),  Features Intersected: NISQUALLY RIVER,  Facility Carried by Structure: NISQUALLY BR. RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 8.78m (28.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPFORLEW000011,  Location: GRID COORD ET291177 (Lat: 47.112219,  Lng: -122.616400),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 220 (year 2042),  Features Intersected: SEQUALITCHEW CREEK,  Facility Carried by Structure: SEQUALITCHEW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Poor,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORLEW000014,  Location: ET339079 (Lat: 47.029681,  Lng: -122.553500),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 10 (year 2016),  Average Future Daily Traffic: 10 (year 2042),  Features Intersected: DRAINAGE CANAL,  Facility Carried by Structure: 20TH INFANTRY WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.4m (24.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 69.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DAPFORLEW000015,  Location: GRID COORD ET287177 (Lat: 47.113161,  Lng: -122.622400),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 110 (year 2042),  Features Intersected: DRAINAGE CANAL,  Facility Carried by Structure: I STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORLEW000016,  Location: ET370083 (Lat: 47.027881,  Lng: -122.513600),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10 (year 2016),  Average Future Daily Traffic: 10 (year 2042),  Features Intersected: MUCK CREEK,  Facility Carried by Structure: PINCUS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORLEW000017,  Location: ET406086 (Lat: 47.028931,  Lng: -122.465500),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 10 (year 2042),  Features Intersected: MUCK CREEK,  Facility Carried by Structure: 30TH INF REGT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORLEW000018,  Location: BARNES BLDV (Lat: 47.116689,  Lng: -122.500300),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 11.19m (36.71ft),  Average Daily Traffic: 18,000 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,000 (year 2042),  Design Load: HL 93,  Features Intersected: E. LINCOLN/PERIMETER RD,  Facility Carried by Structure: JBLM ACCESS CORRID
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Army,  Approaching Roadway Width: 11.7m (38.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 55.9m (183.4ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 67.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.68m (12.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: DAPFORLEW008005,  Location: ET311172 (Lat: 47.107989,  Lng: -122.589800),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 500 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 500 (year 2042),  Features Intersected: AMERICAN LAKE,  Facility Carried by Structure: NCO BEACH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORLEW0RV0MB,  Location: SE OF JACKSON AVE (Lat: 47.107239,  Lng: -122.547900),  Route carried "on" structure: Other road ,  Year Built: 2013,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,500 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,000 (year 2043),  Design Load: HL 93,  Features Intersected: MURRAY CREEK,  Facility Carried by Structure: MADIGAN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: Army,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: DAPNSAYAK000004,  Location: COORDINATES GS038745 (Lat: 46.693000,  Lng: -120.334300),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 240 (year 2042),  Features Intersected: SELAH SPRINGS,  Facility Carried by Structure: BADGER POCKET RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPNSAYAK000005,  Location: COORDINATES GS047858 (Lat: 46.794289,  Lng: -120.318700),  Route carried "on" structure: Other road ,  Year Built: 2004,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 10 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 12 (year 2042),  Features Intersected: LMUMA CREEK,  Facility Carried by Structure: SECTION LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 4495A,  Location: 6.1 N THURSTON CO (Lat: 47.104194,  Lng: -122.588722),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 10,765 (year 2010),  Truck Traffic: 8%,  Features Intersected: 41ST DIVISION DR
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.161,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 4495B,  Location: 6.1 N THURSTON CO (Lat: 47.104333,  Lng: -122.588778),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 10,765 (year 2010),  Truck Traffic: 8%,  Features Intersected: 41ST DIVISION
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 8580A,  Location: 6.1 N THURSTON CO (Lat: 47.104000,  Lng: -122.588611),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 10,765 (year 2010),  Truck Traffic: 8%,  Features Intersected: 41ST DIVISION DRIVE
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.193,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 8580B,  Location: 6.1 N THURSTON CO (Lat: 47.103872,  Lng: -122.588547),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 10,765 (year 2010),  Truck Traffic: 8%,  Features Intersected: 41ST DIVISION DR
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Discuss Fort Lewis, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.