Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Radford, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 502ft / 153mTotal length
  • $41,621,000Total costs
  • 202,319Total average daily traffic
  • 45,866Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Radford
  • No street view available for this location

New bridges in Radford, VA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11950-1959
  • 161960-1969
  • 11970-1979
  • 21980-1989
  • 12000-2009
  • 22010-2019
Reconstructed bridges in Radford, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 11990-1999
Average Bridge Daily Traffic in Radford, VA
Average Bridge Truck Traffic in Radford, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 30.8%Good
  • 38.5%Satisfactory
  • 7.7%Fair
  • 15.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.1%Very good
  • 7.7%Good
  • 15.4%Satisfactory
  • 38.5%Fair
  • 15.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 23.1%Good
  • 23.1%Satisfactory
  • 30.8%Fair
  • 15.4%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 35.7%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 3485,  Location: 0.08-Rte779; 0.65-end mt (Lat: 37.426703,  Lng: -79.939064),  Route carried "on" structure: County highway 672,  Year Built: 1971,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 176 (year 2016),  Average Future Daily Traffic: 203 (year 2040),  Design Load: H 20,  Features Intersected: Tinker Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.909,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,421,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 3922,  Location: 2.6 M To 691&3.8 M FR 670 (Lat: 37.388000,  Lng: -82.158242),  Route carried "on" structure: County highway 645,  Year Built: 1961,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 679 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 747 (year 2040),  Design Load: HS 20,  Features Intersected: ROCKLICK CREEK,  Facility Carried by Structure: OLD ROCKLICK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.768,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $135,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 3923,  Location: 4.2 M to 670&2.2 M FR 691 (Lat: 37.388383,  Lng: -82.163658),  Route carried "on" structure: County highway 645,  Year Built: 1961,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 679 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 747 (year 2040),  Design Load: H 20,  Features Intersected: ROCKLICK CREEK,  Facility Carried by Structure: OLD ROCKLICK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.416,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $101,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 3924,  Location: .00FRRT460;.01TORT700 (Lat: 37.354264,  Lng: -82.189175),  Route carried "on" structure: County highway 645,  Year Built: 1966,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 6.70m (21.98ft),  Average Daily Traffic: 2,124 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,336 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LEVISA RIVER,  Facility Carried by Structure: OLD ROCKLICK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $520,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $920,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3925,  Location: 0.0M FR 647 & 2.8M TO 643 (Lat: 37.434608,  Lng: -81.992192),  Route carried "on" structure: County highway 646,  Year Built: 1982,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 856 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 942 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GUESS FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.634,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.5m (31.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12111,  Location: 0.46-RT783;2.11-RT177 (Lat: 37.131906,  Lng: -80.519550),  Route carried "on" structure: US 11,  Year Built: 1988,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 4,600 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,060 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: PLUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.392,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12159,  Location: 0.00-PULASK & 0.00-MONTG (Lat: 37.088408,  Lng: -80.582853),  Route carried "on" structure: Interstate 81,  Year Built: 1965,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 50.58m (165.94ft),  Average Daily Traffic: 17,025 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 23,835 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NEW RV; NS RWY & RT605
Minimum Vertical Clearance: 10.06m (33.01ft),  Kilometerpoint: 169.846,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 2,  Length of Maximum Span: 53.6m (175.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: August 2017,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12161,  Location: 0.00PULAS CO;0.00MONTG CO (Lat: 37.088100,  Lng: -80.582800),  Route carried "on" structure: Interstate 81,  Year Built: 1965,  Year Reconstructed: 1985,  Status: Temporarily open,  Structure Length: 48.77m (160.01ft),  Average Daily Traffic: 18,556 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 25,978 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER & ROUTE 605
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 168.929,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 53.6m (175.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 48.77m (160.01ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $120,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12185,  Location: .68-Rte.667; 1.02-Rte.693 (Lat: 37.071286,  Lng: -80.508219),  Route carried "on" structure: County highway 600,  Year Built: 1965,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,699 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,379 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Meadow Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.668,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $93,000
Find on map >>   Show street view

Structure Number: 12201,  Location: 0.00Pulas Co;0.00Mont Co (Lat: 37.078364,  Lng: -80.575011),  Route carried "on" structure: County highway 605,  Year Built: 1969,  Status: Open,  Structure Length: 6.01m (19.72ft),  Average Daily Traffic: 1,906 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,388 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Little River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,582,000,  Roadway Improvement Cost: $537,000,  Total Project Cost: $10,568,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 12292,  Location: 1.95-RT720; 1.80-RT114 (Lat: 37.153175,  Lng: -80.514928),  Route carried "on" structure: County highway 663,  Year Built: 1932,  Year Reconstructed: 1985,  Status: Posted for load,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 655 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 766 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Crab Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.537,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 6 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,838,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12353,  Location: 1.90-RT665; 2.80-RT693 (Lat: 37.070681,  Lng: -80.541108),  Route carried "on" structure: County highway 787,  Year Built: 1954,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 618 (year 2013),  Average Future Daily Traffic: 701 (year 2040),  Design Load: HL 93,  Features Intersected: Meadow Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.952,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 79.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $659,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $2,143,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12357,  Location: 0.07-RT664; 0.35-RT665 (Lat: 37.098253,  Lng: -80.529797),  Route carried "on" structure: County highway 787,  Year Built: 1965,  Status: Open,  Structure Length: 7.76m (25.46ft),  Average Daily Traffic: 618 (year 2013),  Average Future Daily Traffic: 701 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I 81
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 15.417,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.76m (25.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,078,000,  Roadway Improvement Cost: $1,020,000,  Total Project Cost: $13,051,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 14494,  Location: 5.65-RTE100;0.57-MONTG.CO (Lat: 37.085964,  Lng: -80.593044),  Route carried "on" structure: Interstate 81,  Year Built: 1965,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 18,556 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 25,978 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 799
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.996,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.7m (48.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $2,963,000,  Roadway Improvement Cost: $1,333,000,  Total Project Cost: $10,517,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 14496,  Location: 5.65-RTE100;0.57-MONTG.CO (Lat: 37.086342,  Lng: -80.592953),  Route carried "on" structure: Interstate 81,  Year Built: 1965,  Status: Open,  Structure Length: 4.06m (13.32ft),  Average Daily Traffic: 17,025 (year 2020),  Truck Traffic: 23%,  Average Future Daily Traffic: 23,835 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 799
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.881,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.7m (48.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 14504,  Location: 1.40-Rte660;02.40-Mont.Co (Lat: 37.086894,  Lng: -80.625567),  Route carried "on" structure: Interstate 81,  Year Built: 1965,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 18,556 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 25,978 (year 2040),  Design Load: HS 20,  Features Intersected: Branch of Claytor Lake
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.051,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.6m (8.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $714,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 21271,  Location: O.85 MI. FROM MONTG. CL. (Lat: 37.132447,  Lng: -80.529164),  Route carried "on" structure: US 11,  Year Built: 2002,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 4,600 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,060 (year 2040),  Design Load: H 15,  Features Intersected: PLUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.281,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.5m (132.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29356,  Location: 1.60 S Radf; 0.40 - I-81 (Lat: 37.090575,  Lng: -80.576294),  Route carried "on" structure: Ramp State highway 232,  Year Built: 2019,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 1,655 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,820 (year 2040),  Design Load: HL 93,  Features Intersected: Rte. I-81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.0m (118.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12159,  Location: 0.00-PULASK & 0.00-MONTG (Lat: 37.088408,  Lng: -80.582853),  Route carried "under" structure: County highway 605,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,816 (year 1994),  Features Intersected: NEW RV; NS RWY & RT605,  Facility Carried by Structure: SBL ROUTE 0081
Minimum Vertical Clearance: 10.06m (33.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.6m (175.9ft)

Find on map >>   Show street view

Structure Number: 12161,  Location: 0.00PULAS CO;0.00MONTG CO (Lat: 37.088100,  Lng: -80.582800),  Route carried "under" structure: County highway 605,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,300 (year 2017),  Truck Traffic: 2%,  Features Intersected: NEW RIVER & ROUTE 605,  Facility Carried by Structure: NBL ROUTE 0081
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.6m (175.9ft)

Find on map >>   Show street view

Structure Number: 12357,  Location: 0.07-RT664; 0.35-RT665 (Lat: 37.098253,  Lng: -80.529797),  Route carried "under" structure: Interstate 81,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 43,000 (year 2017),  Truck Traffic: 26%,  Features Intersected: RTE I 81,  Facility Carried by Structure: DRY VALLEY RD/787
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 5.101,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 14494,  Location: 5.65-RTE100;0.57-MONTG.CO (Lat: 37.085964,  Lng: -80.593044),  Route carried "under" structure: County highway 799,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 310 (year 2012),  Features Intersected: RTE 799,  Facility Carried by Structure: NBL ROUTE 81
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 14.7m (48.2ft)

Find on map >>   Show street view

Structure Number: 14496,  Location: 5.65-RTE100;0.57-MONTG.CO (Lat: 37.086342,  Lng: -80.592953),  Route carried "under" structure: County highway 799,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 310 (year 2012),  Features Intersected: RTE 799,  Facility Carried by Structure: SBL ROUTE 0081
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 14.7m (48.2ft)

Find on map >>   Show street view

Structure Number: 29356,  Location: 1.60 S Radf; 0.40 - I-81 (Lat: 37.090575,  Lng: -80.576294),  Route carried "under" structure: Interstate 81,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 43,000 (year 2019),  Truck Traffic: 26%,  Features Intersected: Rte. I-81,  Facility Carried by Structure: Rte 232, Ramps A&B
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Discuss Radford, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.