Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for El Segundo, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 72ft / 21.6mTotal length
  • 301,198Total average daily traffic
  • 4,852Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for El Segundo
  • No street view available for this location

New bridges in El Segundo, CA - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 11970-1979
  • 21980-1989
  • 61990-1999
  • 12010-2019
Average Bridge Daily Traffic in El Segundo, CA
Find on map >>   Show street view

Structure Number: 53 2400S,  Location: 07-LA-105-R0.85-ESEG (Lat: 33.930694,  Lng: -118.390206),  Route carried "on" structure: Ramp Interstate 105,  Year Built: 1989,  Status: Open,  Structure Length: 16.54m (54.27ft),  Average Daily Traffic: 10,400 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,145 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: IMPERIAL HWY EB,  Facility Carried by Structure: IMP HWY EB ONRMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.850,  Lanes on structure: 1,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 46.2m (151.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 53C2241,  Location: 0.26 MI W. OF LA CIENEGA (Lat: 34.026567,  Lng: -118.376992),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 8,000 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,531 (year 2039),  Design Load: HL 93,  Features Intersected: BALLONA CREEK,  Facility Carried by Structure: NATIONAL BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 50.6m (166.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 23.7m (77.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 124,  Location: 07-LA-405-R20.73-ESEG (Lat: 33.923694,  Lng: -118.368364),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2015),  Truck Traffic: 2%,  Features Intersected: 120TH STREET,  Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 53 2400S,  Location: 07-LA-105-R0.85-ESEG (Lat: 33.930694,  Lng: -118.390206),  Route carried "under" structure: City street L100,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2006),  Truck Traffic: 1%,  Features Intersected: IMPERIAL HWY EB,  Facility Carried by Structure: IMP HWY EB ONRMP
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.2m (151.6ft)

Find on map >>   Show street view

Structure Number: 53C0842,  Location: 20FT W/O AVIATION BLVD (Lat: 33.916131,  Lng: -118.378714),  Route carried "under" structure: City street L080,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 43,107 (year 2012),  Truck Traffic: 4%,  Features Intersected: EL SEGUNDO BLVD UP,  Facility Carried by Structure: BNSF
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 53C2018,  Location: 0.5MI E/O SEPULVEDA BLVD (Lat: 33.916231,  Lng: -118.386703),  Route carried "under" structure: City street L080,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 36,396 (year 2012),  Truck Traffic: 4%,  Features Intersected: EL SEGUNDO BLVD,  Facility Carried by Structure: MTA GREEN LINE LRT
Minimum Vertical Clearance: 6.16m (20.21ft),  Kilometerpoint: 0.000,  Lanes under structure: 8,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 38.5m (126.3ft)

Find on map >>   Show street view

Structure Number: 53C2242,  Location: 100FT N/O EL SEGUNDO BLVD (Lat: 33.916806,  Lng: -118.387297),  Route carried "under" structure: City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 36,396 (year 2012),  Truck Traffic: 1%,  Features Intersected: NASH ST S/XING,  Facility Carried by Structure: MTA GREEN LINE LRT
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 0.000,  Lanes under structure: 5,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 42.0m (137.8ft)

Find on map >>   Show street view

Structure Number: 53C2243,  Location: 40FT W/O NASH ST (Lat: 33.919594,  Lng: -118.387475),  Route carried "under" structure: City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 34,711 (year 2012),  Features Intersected: GRAND AVE,  Facility Carried by Structure: MTA GREEN LINE LRT
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.0m (131.2ft)

Find on map >>   Show street view

Structure Number: 53C2244,  Location: 40FT W/O NASH ST (Lat: 33.923517,  Lng: -118.387472),  Route carried "under" structure: City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 36,396 (year 2012),  Features Intersected: MARIPOSA AVE,  Facility Carried by Structure: MTA GREEN LINE LRT
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 53C2247,  Location: 0.1MI S/O IMPERIAL (Lat: 33.929222,  Lng: -118.383300),  Route carried "under" structure: City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 36,396 (year 2012),  Truck Traffic: 1%,  Features Intersected: DOUGLAS ST,  Facility Carried by Structure: MTA GREEN LINE LRT
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 53C2248,  Location: 0.3MI S/O IMPERIAL HWY (Lat: 33.926850,  Lng: -118.387475),  Route carried "under" structure: City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 36,396 (year 2012),  Truck Traffic: 1%,  Features Intersected: NASH ST / E MAPLE AVE,  Facility Carried by Structure: MTA GREEN LINE LRT
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.1m (131.6ft)

Discuss El Segundo, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.