Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Catoosa, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 37Number of bridges
  • 728ft / 222mTotal length
  • $93,054,000Total costs
  • 509,700Total average daily traffic
  • 67,170Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Catoosa
  • No street view available for this location

New bridges in Catoosa, OK - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 121950-1959
  • 21960-1969
  • 61970-1979
  • 52000-2009
  • 102010-2019
  • 12020-2022
Average Bridge Daily Traffic in Catoosa, OK
Average Bridge Truck Traffic in Catoosa, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 55.0%Good
  • 15.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.0%Very good
  • 15.0%Good
  • 20.0%Satisfactory
  • 15.0%Fair
  • 5.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.0%Very good
  • 40.0%Good
  • 25.0%Satisfactory
  • 15.0%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 54.2%Good
  • 20.8%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Very good
  • 40.0%Good
  • 30.0%Satisfactory
  • 10.0%Poor
  • 10.0%Serious
Find on map >>   Show street view

Structure Number: 7136,  Location: 0.1 MI S OF PINE ST (Lat: 36.175631,  Lng: -95.753319),  Route carried "on" structure: County highway 8545,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,200 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $201,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $319,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13688,  Location: 3.3 MI N JCT I-44 (Lat: 36.208106,  Lng: -95.724922),  Route carried "on" structure: State highway 66,  Year Built: 1956,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 25.14m (82.48ft),  Average Daily Traffic: 6,750 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,800 (year 2040),  Design Load: H 20,  Features Intersected: BIRD CREEK & RD. UNDER
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 5.921,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 64.0m (210.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.15m (82.51ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Other Special Inspection Date: November 2020,  Bridge Improvement Cost: $3,226,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $8,164,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13708,  Location: 0.7 MI N I-44 (Lat: 36.175461,  Lng: -95.750861),  Route carried "on" structure: State highway 66,  Year Built: 1957,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 18,900 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,240 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $397,000,  Total Project Cost: $674,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13746,  Location: .4 MI E TULSA-ROGERS (Lat: 36.164147,  Lng: -95.754006),  Route carried "on" structure: Interstate 44,  Year Built: 1957,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 22,350 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 35,760 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.744,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $468,000,  Total Project Cost: $795,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13748,  Location: 0.7 MI E TULSA-ROGERS (Lat: 36.165322,  Lng: -95.750619),  Route carried "on" structure: State highway 66,  Year Built: 1957,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 16,000 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 90.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $774,000,  Total Project Cost: $1,314,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13749,  Location: 0.7 MI E TULSA-ROGERS (Lat: 36.165706,  Lng: -95.752583),  Route carried "on" structure: State highway 66,  Year Built: 1957,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 11,300 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 18,080 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $833,000,  Total Project Cost: $1,413,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13825,  Location: .6 MI E TULSA-ROGERS (Lat: 36.163908,  Lng: -95.752103),  Route carried "on" structure: Interstate 44,  Year Built: 1957,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 44,400 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 71,040 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 66 EB UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.792,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $616,000,  Roadway Improvement Cost: $1,017,000,  Total Project Cost: $1,725,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 13883,  Location: 0.8 MI E TULSA-ROGERS (Lat: 36.167442,  Lng: -95.750869),  Route carried "on" structure: State highway 66,  Year Built: 1957,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 16,000 (year 2040),  Design Load: HS 20,  Features Intersected: ABANDONED TPK UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.15m (26.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $671,000,  Roadway Improvement Cost: $1,108,000,  Total Project Cost: $1,880,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 13978,  Location: 3.3MI NE OF T.P.GATE (Lat: 36.195842,  Lng: -95.716711),  Route carried "on" structure: Interstate 44,  Year Built: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 26,200 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 41,920 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.344,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 55.2m (181.1ft),  Out-to-Out Width: 55.8m (183.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14176,  Location: 2.35MI NEOF TP GATE (Lat: 36.187778,  Lng: -95.726389),  Route carried "on" structure: County highway N4090,  Year Built: 1958,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 20,  Features Intersected: WILL ROGERS TP I-44 UND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.505,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $883,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,437,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17603,  Location: 3.8 MI N JCT I 44 (Lat: 36.214492,  Lng: -95.721328),  Route carried "on" structure: State highway 66,  Year Built: 1969,  Status: Open,  Structure Length: 25.85m (84.81ft),  Average Daily Traffic: 7,500 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,000 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIVER (KMARNS)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.709,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 15.8m (51.8ft), Horizontal Clearance: 91.4m (299.9ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 101.8m (334.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 25.85m (84.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,071,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $10,113,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17604,  Location: 3.8 MI N JCT I 44 (Lat: 36.214675,  Lng: -95.721544),  Route carried "on" structure: State highway 66,  Year Built: 1969,  Status: Open,  Structure Length: 25.85m (84.81ft),  Average Daily Traffic: 8,600 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 13,760 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIVER (KMARNS)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.709,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 15.8m (51.8ft), Horizontal Clearance: 91.4m (299.9ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 101.8m (334.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 25.85m (84.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,071,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $10,113,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1814,  Location: 5.6 MI E TULSA C/L (Lat: 36.249461,  Lng: -95.734908),  Route carried "on" structure: State highway 266,  Year Built: 1971,  Status: Open,  Structure Length: 15.91m (52.20ft),  Average Daily Traffic: 8,900 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 14,240 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.431,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.91m (52.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,072,000,  Roadway Improvement Cost: $3,419,000,  Total Project Cost: $5,802,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18768,  Location: 1.3 MI N JCT I-44 (Lat: 36.182028,  Lng: -95.759747),  Route carried "on" structure: State highway 167,  Year Built: 1974,  Status: Open,  Structure Length: 7.09m (23.26ft),  Average Daily Traffic: 8,300 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,280 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF R.R. & CO RD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.189,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.88m (25.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,920,000,  Roadway Improvement Cost: $3,167,000,  Total Project Cost: $5,375,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18782,  Location: 2.8 MI N JCT I-44 (Lat: 36.206394,  Lng: -95.758661),  Route carried "on" structure: State highway 167,  Year Built: 1974,  Status: Open,  Structure Length: 13.78m (45.21ft),  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,120 (year 2040),  Design Load: HS 20,  Features Intersected: BIRD CREEK O'FLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.780,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.86m (45.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,378,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $8,324,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18787,  Location: 2.7 MI JCT I-44 (Lat: 36.204172,  Lng: -95.758544),  Route carried "on" structure: State highway 167,  Year Built: 1974,  Status: Open,  Structure Length: 15.30m (50.20ft),  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,120 (year 2040),  Design Load: HS 20,  Features Intersected: BIRD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.521,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.30m (50.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,729,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $8,695,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1921,  Location: 0.2 MI W OF TURNPIKE (Lat: 36.177025,  Lng: -95.742775),  Route carried "on" structure: County highway E0580,  Year Built: 1976,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: HS 20,  Features Intersected: SPUNKY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Good,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $321,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $513,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2563,  Location: 1.7 MI N JCT I 44 (Lat: 36.187714,  Lng: -95.739806),  Route carried "on" structure: State highway 66,  Year Built: 2000,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 7,500 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,000 (year 2040),  Design Load: HS 20,  Features Intersected: SPUNKY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.235,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 86.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,062,000,  Roadway Improvement Cost: $1,752,000,  Total Project Cost: $2,973,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25631,  Location: 1.7 MI N JCT I-44 (Lat: 36.187972,  Lng: -95.739989),  Route carried "on" structure: State highway 66,  Year Built: 2000,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 9,300 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,880 (year 2040),  Design Load: HS 20,  Features Intersected: SPUNKY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.235,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 86.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,062,000,  Roadway Improvement Cost: $1,752,000,  Total Project Cost: $2,973,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26524,  Location: PINE ST. IN CATOOSA (Lat: 36.176897,  Lng: -95.758831),  Route carried "on" structure: County highway E0570,  Year Built: 2001,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.39m (34.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2711,  Location: .4E JCT I-44 (Lat: 36.162756,  Lng: -95.745500),  Route carried "on" structure: Interstate 44,  Year Built: 2001,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 22,200 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 35,520 (year 2040),  Design Load: HS 20,  Features Intersected: SPUNKY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.854,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.23m (27.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,477,000,  Roadway Improvement Cost: $2,438,000,  Total Project Cost: $4,137,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28203,  Location: TULSA-ROGERS CO.LINE (Lat: 36.162411,  Lng: -95.762014),  Route carried "on" structure: Interstate 44,  Year Built: 2010,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 65,600 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 104,960 (year 2040),  Design Load: HL 93,  Features Intersected: 193RD E. AVE. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.810,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 49.4m (162.1ft),  Out-to-Out Width: 50.3m (165.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $777,000,  Roadway Improvement Cost: $1,333,000,  Total Project Cost: $2,222,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28205,  Location: .3 MI.E.TULSA CO.LINE (Lat: 36.161903,  Lng: -95.754061),  Route carried "on" structure: Interstate 44,  Year Built: 2010,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 33,350 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 53,360 (year 2040),  Design Load: HL 93,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.472,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 28343,  Location: .3 MI.E.TULSA-ROGERS C/L (Lat: 36.162536,  Lng: -95.753911),  Route carried "on" structure: Interstate 44,  Year Built: 2010,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 22,200 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 35,520 (year 2040),  Design Load: HL 93,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.744,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 28826,  Location: .5 S OF PINE STREET (Lat: 36.166186,  Lng: -95.806481),  Route carried "on" structure: County highway N4050,  Year Built: 2007,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: N. 153RD E. AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.008,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 0.9m (3.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Poor,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 29441,  Location: 1.8E JCT I-244 (Lat: 36.162322,  Lng: -95.794758),  Route carried "on" structure: Interstate 44,  Year Built: 2010,  Status: Open,  Structure Length: 5.81m (19.06ft),  Average Daily Traffic: 65,600 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 104,960 (year 2040),  Design Load: HS 20,  Features Intersected: 163RD E. AVE. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.003,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 44.8m (147.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 43.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,900,000,  Roadway Improvement Cost: $6,000,000,  Total Project Cost: $10,920,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 297,  Location: .1S; 3W OF FAIR OAKS (Lat: 36.160556,  Lng: -95.745278),  Route carried "on" structure: County highway E0591,  Year Built: 2011,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 650 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 845 (year 2040),  Design Load: HS 20,  Features Intersected: SPUNKY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 29984,  Location: 3.3 N OF JCT. I-44 (Lat: 36.208333,  Lng: -95.725278),  Route carried "on" structure: State highway 66,  Year Built: 2012,  Status: Open,  Structure Length: 21.69m (71.16ft),  Average Daily Traffic: 8,800 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,080 (year 2040),  Design Load: HL 93,  Features Intersected: BIRD CREEK. & RD. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.921,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 60.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30911,  Location: .5W OF S.H. 66 (Lat: 36.191389,  Lng: -95.740833),  Route carried "on" structure: City street E0570,  Year Built: 2015,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 480 (year 2040),  Design Load: HS 20,  Features Intersected: SPUNKY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 32785,  Location: .2N OF PINE ST (Lat: 36.179406,  Lng: -95.761617),  Route carried "on" structure: City street N4070,  Year Built: 2020,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.071,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 13688,  Location: 3.3 MI N JCT I-44 (Lat: 36.208106,  Lng: -95.724922),  Route carried "under" structure: County highway ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: BIRD CREEK & RD. UNDER,  Facility Carried by Structure: S.H. 66 NB
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 5.422,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 64.0m (210.0ft)

Find on map >>   Show street view

Structure Number: 13825,  Location: .6 MI E TULSA-ROGERS (Lat: 36.163908,  Lng: -95.752103),  Route carried "under" structure: State highway 66,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 22,600 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 66 EB UNDER,  Facility Carried by Structure: I-44 WB
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 14176,  Location: 2.35MI NEOF TP GATE (Lat: 36.187778,  Lng: -95.726389),  Route carried "under" structure: Interstate 44,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 26,200 (year 2020),  Truck Traffic: 36%,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: CO. RD. N4090
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 3.058,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 18768,  Location: 1.3 MI N JCT I-44 (Lat: 36.182028,  Lng: -95.759747),  Route carried "under" structure: County highway ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 5%,  Features Intersected: BNSF R.R. & CO RD UNDER,  Facility Carried by Structure: S.H. 167
Minimum Vertical Clearance: 8.23m (27.00ft),  Kilometerpoint: 2.189,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 28203,  Location: TULSA-ROGERS CO.LINE (Lat: 36.162411,  Lng: -95.762014),  Route carried "under" structure: State highway 167,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 14,200 (year 2020),  Truck Traffic: 5%,  Features Intersected: 193RD E. AVE. UNDER,  Facility Carried by Structure: I-44 / U.S. 412
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 29441,  Location: 1.8E JCT I-244 (Lat: 36.162322,  Lng: -95.794758),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: 163RD E. AVE. UNDER,  Facility Carried by Structure: I-44
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 29984,  Location: 3.3 N OF JCT. I-44 (Lat: 36.208333,  Lng: -95.725278),  Route carried "under" structure: ServiceCounty highway ,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: BIRD CREEK. & RD. UNDER,  Facility Carried by Structure: S.H. 66 SB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Discuss Catoosa, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.