Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Clay, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 509ft / 155mTotal length
  • $77,002,000Total costs
  • 262,092Total average daily traffic
  • 8,076Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clay
  • No street view available for this location

New bridges in Clay, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11930-1939
  • 11940-1949
  • 11960-1969
  • 161970-1979
  • 51990-1999
  • 22000-2009
Reconstructed bridges in Clay, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Clay, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Excellent
  • 5.6%Very good
  • 22.2%Good
  • 61.1%Satisfactory
  • 5.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.6%Excellent
  • 11.1%Very good
  • 27.8%Good
  • 38.9%Satisfactory
  • 11.1%Fair
  • 5.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Excellent
  • 16.7%Very good
  • 44.4%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.4%Very good
  • 64.3%Good
  • 14.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 102195,  Location: 1.0 MI E JCT RTS 31 & 481 (Lat: 43.186283,  Lng: -76.213692),  Route carried "on" structure: State highway 31,  Year Built: 2004,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 9,551 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,595 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Mud Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.596,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 24.9m (81.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,873,000,  Roadway Improvement Cost: $1,097,000,  Total Project Cost: $2,969,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1061711,  Location: 4 MI NW JCT SH 481 & I81 (Lat: 43.168975,  Lng: -76.181056),  Route carried "on" structure: State highway 481,  Year Built: 1972,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 10,389 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,534 (year 2040),  Design Load: HS 20,  Features Intersected: CSXT-MONTREAL SEC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.452,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,266,000,  Roadway Improvement Cost: $741,000,  Total Project Cost: $2,007,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1061712,  Location: 4 MI NW JCT SH 481 & I81 (Lat: 43.169161,  Lng: -76.180964),  Route carried "on" structure: State highway 481,  Year Built: 1972,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 10,389 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,534 (year 2040),  Design Load: HS 20,  Features Intersected: CSXT-MONTREAL SEC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.452,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,266,000,  Roadway Improvement Cost: $741,000,  Total Project Cost: $2,007,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 106176,  Location: JCT OF RTS 31 + 481 (Lat: 43.185564,  Lng: -76.231772),  Route carried "on" structure: State highway 31,  Year Built: 1972,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 22,002 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,105 (year 2040),  Design Load: HS 20,  Features Intersected: 481 481 33011069 SB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.116,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.4m (122.7ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,705,000,  Roadway Improvement Cost: $2,170,000,  Total Project Cost: $5,875,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106177,  Location: 1.5 MI SE JCT RTS 481 +31 (Lat: 43.172625,  Lng: -76.209267),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 10,796 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,114 (year 2040),  Design Load: HS 20,  Features Intersected: 481 481 33011055, RTE 48,  Facility Carried by Structure: MORGAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.459,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.4m (149.0ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.86m (29.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,975,000,  Roadway Improvement Cost: $2,328,000,  Total Project Cost: $6,303,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 106178,  Location: 2.0 MI SE JCT RTS 481 +31 (Lat: 43.171169,  Lng: -76.197972),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 6,300 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,794 (year 2040),  Design Load: HS 20,  Features Intersected: 481 481 33011049 NB, RTE,  Facility Carried by Structure: HENRY CLAY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.443,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.31m (23.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,327,000,  Roadway Improvement Cost: $1,363,000,  Total Project Cost: $3,689,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 106464,  Location: 0.6 MI NW JCT RTS 481 +31 (Lat: 43.192519,  Lng: -76.237392),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 1,263 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,562 (year 2040),  Design Load: HS 20,  Features Intersected: 481 481 33011075, RTE 48,  Facility Carried by Structure: VERPLANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.282,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.85m (22.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,847,000,  Roadway Improvement Cost: $1,082,000,  Total Project Cost: $2,928,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106801,  Location: 2.3 MI SE JCT RTS 481$ 31 (Lat: 43.171342,  Lng: -76.197250),  Route carried "on" structure: State highway 481,  Year Built: 1993,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 20,777 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 27,068 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.884,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $720,000,  Roadway Improvement Cost: $421,000,  Total Project Cost: $1,141,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 106802,  Location: 0.3 MI NE JCT RTS 481+11 (Lat: 43.150792,  Lng: -76.134875),  Route carried "on" structure: State highway 481,  Year Built: 1972,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 20,777 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 27,068 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.124,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,059,000,  Roadway Improvement Cost: $620,000,  Total Project Cost: $1,678,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331281,  Location: .5 M N SH 31 IN EUCLID (Lat: 43.194364,  Lng: -76.212208),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 995 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,231 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MUD CREEK,  Facility Carried by Structure: VER PLANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.374,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $723,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331283,  Location: 2 MI NORTH OF EUCLID (Lat: 43.204539,  Lng: -76.214242),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 1,675 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,345 (year 2040),  Features Intersected: MUD CREEK,  Facility Carried by Structure: OAK ORCHARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $995,000,  Roadway Improvement Cost: $583,000,  Total Project Cost: $1,577,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 331284,  Location: 2 MI NE EXIT 38 OF I90 (Lat: 43.141611,  Lng: -76.194331),  Route carried "on" structure: County highway ,  Year Built: 1967,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 12,201 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,258 (year 2040),  Features Intersected: CSX TRANSPRTATION,  Facility Carried by Structure: BUCKLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,064,000,  Roadway Improvement Cost: $623,000,  Total Project Cost: $1,686,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335906,  Location: 3.5 MI WEST OF CICERO (Lat: 43.173831,  Lng: -76.199519),  Route carried "on" structure: County highway ,  Year Built: 1972,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 6,300 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,794 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: HENRY CLAY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.765,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $916,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 402742,  Location: RTE 481 ONOND-OSWEGO CL (Lat: 43.201819,  Lng: -76.277953),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 11.28m (37.01ft),  Average Daily Traffic: 4,685 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,691 (year 2040),  Design Load: HS 20,  Features Intersected: ONEIDA RIVER,  Facility Carried by Structure: COUNTY ROUTE 57
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 12.856,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 50.5m (165.7ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 76.2m (250.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.27m (36.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $6,572,000,  Roadway Improvement Cost: $3,849,000,  Total Project Cost: $10,421,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4051011,  Location: 481 SB AT ONON&OSWEGO CL (Lat: 43.210636,  Lng: -76.266144),  Route carried "on" structure: State highway 481,  Year Built: 1970,  Status: Open,  Structure Length: 22.40m (73.49ft),  Average Daily Traffic: 8,029 (year 2010),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,460 (year 2040),  Design Load: HS 20,  Features Intersected: BONSTEAD ROAD, ONEIDA RI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.205,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 60.9m (199.8ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 70.1m (230.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.40m (73.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $5,631,000,  Roadway Improvement Cost: $3,298,000,  Total Project Cost: $8,929,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4051012,  Location: I481NB AT ONON+OSWEGO CL (Lat: 43.210794,  Lng: -76.265939),  Route carried "on" structure: State highway 481,  Year Built: 1970,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 22.40m (73.49ft),  Average Daily Traffic: 9,289 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,567 (year 2040),  Design Load: HS 20,  Features Intersected: BONSTEAD ROAD, ONEIDA RI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 60.9m (199.8ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 70.1m (230.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.40m (73.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $5,631,000,  Roadway Improvement Cost: $3,298,000,  Total Project Cost: $8,929,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 443302,  Location: 2.3 MI W JCT US11 & BG CL (Lat: 43.243283,  Lng: -76.183181),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 1,573 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,946 (year 2040),  Design Load: HS 20,  Features Intersected: ERIE CANAL CUT,  Facility Carried by Structure: CAUGHDENOY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.422,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 31.6m (103.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $1,994,000,  Roadway Improvement Cost: $1,168,000,  Total Project Cost: $3,162,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 443303,  Location: 3.4 MI W JCT 11 + BARGE C (Lat: 43.236272,  Lng: -76.203042),  Route carried "on" structure: County highway ,  Year Built: 1908,  Year Reconstructed: 2000,  Status: Posted for load-capacity,  Structure Length: 7.83m (25.69ft),  Truck Traffic: 8%,  Design Load: H 20,  Features Intersected: ERIE CANAL CUT,  Facility Carried by Structure: BLACK CREEK ROAD
Minimum Vertical Clearance: 4.01m (13.16ft),  Kilometerpoint: 1.883,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 38.1m (125.0ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.83m (25.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $2,608,000,  Roadway Improvement Cost: $1,527,000,  Total Project Cost: $4,136,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 443304,  Location: 2.7 MI E JCT 481 &BARGE C (Lat: 43.205294,  Lng: -76.217639),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 13.90m (45.60ft),  Average Daily Traffic: 7,176 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,032 (year 2040),  Design Load: HS 20,  Features Intersected: ONEIDA RIVER,  Facility Carried by Structure: MORGAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.160,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 57.9m (190.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 64.9m (212.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.89m (45.57ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $3,053,000,  Roadway Improvement Cost: $1,788,000,  Total Project Cost: $4,841,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 443305,  Location: 1.2 MI E JCT SH481 & BG C (Lat: 43.216392,  Lng: -76.247308),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 10.27m (33.69ft),  Average Daily Traffic: 333 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 466 (year 2039),  Design Load: HS 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: HORSESHOE IS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 39.6m (129.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 49.3m (161.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.27m (33.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $1,545,000,  Roadway Improvement Cost: $904,000,  Total Project Cost: $2,449,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 443315,  Location: IN CAUGHDENOY (Lat: 43.269897,  Lng: -76.206039),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,034 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,848 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CAUGHDENOY LOCK,  Facility Carried by Structure: CAUGHDENOY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.206,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $636,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106176,  Location: JCT OF RTS 31 + 481 (Lat: 43.185564,  Lng: -76.231772),  Route carried "under" structure: State highway 481,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 24,521 (year 2002),  Features Intersected: 481 481 33011069 SB, RTE,  Facility Carried by Structure: RTE 31
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 11.215,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.4m (122.7ft)

Find on map >>   Show street view

Structure Number: 106177,  Location: 1.5 MI SE JCT RTS 481 +31 (Lat: 43.172625,  Lng: -76.209267),  Route carried "under" structure: State highway 481,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 24,521 (year 2002),  Features Intersected: 481 481 33011055, RTE 48,  Facility Carried by Structure: MORGAN ROAD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 8.866,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.4m (149.0ft)

Find on map >>   Show street view

Structure Number: 106178,  Location: 2.0 MI SE JCT RTS 481 +31 (Lat: 43.171169,  Lng: -76.197972),  Route carried "under" structure: State highway 481,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 24,521 (year 2002),  Features Intersected: 481 481 33011049 NB, RTE,  Facility Carried by Structure: HENRY CLAY BLVD
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 7.884,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 106464,  Location: 0.6 MI NW JCT RTS 481 +31 (Lat: 43.192519,  Lng: -76.237392),  Route carried "under" structure: State highway 481,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 20,995 (year 2002),  Features Intersected: 481 481 33011075, RTE 48,  Facility Carried by Structure: VERPLANK ROAD
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 12.051,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 4051011,  Location: 481 SB AT ONON&OSWEGO CL (Lat: 43.210636,  Lng: -76.266144),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2021),  Features Intersected: BONSTEAD ROAD, ONEIDA RI,  Facility Carried by Structure: RTE 481
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 70.1m (230.0ft)

Find on map >>   Show street view

Structure Number: 4051012,  Location: I481NB AT ONON+OSWEGO CL (Lat: 43.210794,  Lng: -76.265939),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2021),  Features Intersected: BONSTEAD ROAD, ONEIDA RI,  Facility Carried by Structure: RTE 481
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 70.1m (230.0ft)

Discuss Clay, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.