Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jefferson, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 85ft / 25.6mTotal length
  • $2,648,000Total costs
  • 517,401Total average daily traffic
  • 9,445Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jefferson
  • No street view available for this location

New bridges in Jefferson, VA - historical statistics
  • New bridges - historical statistics
  • 91950-1959
  • 21960-1969
  • 31970-1979
  • 61980-1989
  • 11990-1999
Reconstructed bridges in Jefferson, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Jefferson, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 87.5%Good
  • 12.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Good
  • 62.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Good
  • 50.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 22.2%Good
  • 55.6%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Good
  • 60.0%Satisfactory
Find on map >>   Show street view

Structure Number: 6174,  Location: 00.00FRF712/00.00TO0000 (Lat: 38.872322,  Lng: -77.157428),  Route carried "on" structure: Other road ,  Year Built: 1958,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 3,932 (year 2014),  Average Future Daily Traffic: 5,171 (year 2035),  Design Load: HS 20,  Features Intersected: ARLINGTON BOULEVARD,  Facility Carried by Structure: CONNECTOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $560,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6236,  Location: 01.42FR714/01.10TO29 (Lat: 38.872472,  Lng: -77.156442),  Route carried "on" structure: State highway 7,  Year Built: 1958,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 8,804 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,686 (year 2040),  Design Load: HS 20,  Features Intersected: ARLINGTON BLVD. (RTE.50),  Facility Carried by Structure: LEESBURG PIKE EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 104.698,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6238,  Location: 01.42FR714/01.10TO29 (Lat: 38.872364,  Lng: -77.155867),  Route carried "on" structure: State highway 7,  Year Built: 1958,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 17,035 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,992 (year 2040),  Design Load: HS 20,  Features Intersected: ARLINGTON BOULEVARD,  Facility Carried by Structure: LEESBURG PIKE WBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 104.714,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $500,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6282,  Location: 00.20FR6928/00.20TO704 (Lat: 38.874967,  Lng: -77.211744),  Route carried "on" structure: US 29,  Year Built: 1976,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 33,621 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 36,983 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF HOLMES RUN,  Facility Carried by Structure: LEE HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 385.919,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000
Find on map >>   Show street view

Structure Number: 6305,  Location: 00.15FR649 0.08TO1713 (Lat: 38.869142,  Lng: -77.177453),  Route carried "on" structure: US 50,  Year Built: 1970,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 40,895 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 43,461 (year 2040),  Design Load: HS 20,  Features Intersected: TRIPPS RUN,  Facility Carried by Structure: ARLINGTON BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 126.693,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $44,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $150,000
Find on map >>   Show street view

Structure Number: 6306,  Location: 0.05FR FAIRVIEW 0.10TO50 (Lat: 38.866267,  Lng: -77.215197),  Route carried "on" structure: Ramp County highway 6928,  Year Built: 1985,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 9,000 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,545 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP G OF I - 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.967,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 47.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $150,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6688,  Location: 00.10FR1731/00.10TO872 (Lat: 38.860197,  Lng: -77.166075),  Route carried "on" structure: County highway 613,  Year Built: 1968,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 9,703 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,584 (year 2040),  Design Load: HS 20,  Features Intersected: TRIPPS RUN,  Facility Carried by Structure: SLEEPY HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.568,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $60,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6779,  Location: 00.50FR708/00.21TO50 (Lat: 38.866686,  Lng: -77.174808),  Route carried "on" structure: County highway 649,  Year Built: 1966,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 12,401 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,361 (year 2040),  Design Load: HS 20,  Features Intersected: TRIPPS RUN,  Facility Carried by Structure: ANNANDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.390,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $200,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6944,  Location: 00.05FR1760/00.05TO1757 (Lat: 38.871014,  Lng: -77.178067),  Route carried "on" structure: County highway 1723,  Year Built: 1971,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 804 (year 2016),  Average Future Daily Traffic: 900 (year 2040),  Design Load: HS 20,  Features Intersected: TRIPPS RUN,  Facility Carried by Structure: JEFFERSON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.089,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 72.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $51,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7081,  Location: 00.20FR29/00.60TO50 (Lat: 38.872472,  Lng: -77.216800),  Route carried "on" structure: County highway 6928,  Year Built: 1987,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 12,570 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,598 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF HOLMES RUN,  Facility Carried by Structure: Fairview Park Dr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 54.30m (178.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $100,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 7082,  Location: 00.10FR6928/00.21TO END (Lat: 38.873389,  Lng: -77.213497),  Route carried "on" structure: County highway 6929,  Year Built: 1985,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 1,462 (year 2019),  Average Future Daily Traffic: 1,616 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH HOLMES RUN,  Facility Carried by Structure: NEW PROVIDENCE DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.331,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $27,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $130,000
Find on map >>   Show street view

Structure Number: 25654,  Location: 00.20FR1839/00.01TO2310 (Lat: 38.863456,  Lng: -77.171581),  Route carried "on" structure: County highway 1840,  Year Built: 1999,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 261 (year 2016),  Average Future Daily Traffic: 323 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TRIPPS RUN,  Facility Carried by Structure: HOLLOWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $42,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30147,  Location: 1.10 fr 705 0.20 to 338 (Lat: 38.879281,  Lng: -77.178250),  Route carried "on" structure: City street 29,  Year Built: 1980,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 21,780 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 23,958 (year 2040),  Design Load: HS 20,  Features Intersected: Tripps Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 6174,  Location: 00.00FRF712/00.00TO0000 (Lat: 38.872322,  Lng: -77.157428),  Route carried "under" structure: US 50,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 55,877 (year 2008),  Truck Traffic: 1%,  Features Intersected: ARLINGTON BOULEVARD,  Facility Carried by Structure: CONNECTOR ROAD
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 128.511,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 6174,  Location: 00.00FRF712/00.00TO0000 (Lat: 38.872322,  Lng: -77.157428),  Route carried "under" structure: US 50,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 53,492 (year 1997),  Truck Traffic: 2%,  Features Intersected: ARLINGTON BOULEVARD,  Facility Carried by Structure: CONNECTOR ROAD
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 128.511,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 6236,  Location: 01.42FR714/01.10TO29 (Lat: 38.872472,  Lng: -77.156442),  Route carried "under" structure: US 50,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 55,877 (year 2008),  Truck Traffic: 2%,  Features Intersected: ARLINGTON BLVD. (RTE.50),  Facility Carried by Structure: LEESBURG PIKE EB
Minimum Vertical Clearance: 4.86m (15.94ft),  Kilometerpoint: 128.575,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 6236,  Location: 01.42FR714/01.10TO29 (Lat: 38.872472,  Lng: -77.156442),  Route carried "under" structure: US 50,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 55,877 (year 2008),  Truck Traffic: 2%,  Features Intersected: ARLINGTON BLVD. (RTE.50),  Facility Carried by Structure: LEESBURG PIKE EB
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 128.575,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 6238,  Location: 01.42FR714/01.10TO29 (Lat: 38.872364,  Lng: -77.155867),  Route carried "under" structure: US 50,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 55,877 (year 2008),  Truck Traffic: 1%,  Features Intersected: ARLINGTON BOULEVARD,  Facility Carried by Structure: LEESBURG PIKE WBL
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 128.623,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 6238,  Location: 01.42FR714/01.10TO29 (Lat: 38.872364,  Lng: -77.155867),  Route carried "under" structure: US 50,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 47,133 (year 1994),  Truck Traffic: 1%,  Features Intersected: ARLINGTON BOULEVARD,  Facility Carried by Structure: LEESBURG PIKE WBL
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 128.623,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 6306,  Location: 0.05FR FAIRVIEW 0.10TO50 (Lat: 38.866267,  Lng: -77.215197),  Route carried "under" structure: Ramp County highway 6928,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 1994),  Truck Traffic: 2%,  Features Intersected: RAMP G OF I - 495
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 6636,  Location: 00.10FR495NB/00.05TO50WB (Lat: 38.866794,  Lng: -77.218081),  Route carried "under" structure: Ramp State highway 50,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1992),  Features Intersected: RAMP L & M,  Facility Carried by Structure: RAMP N OF RTE.495
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.290,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Discuss Jefferson, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.