Bridge Statistics for Melville, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 226ft / 69.0mTotal length
  • $92,455,000Total costs
  • 1,746,478Total average daily traffic
  • 24,156Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Melville
  • No street view available for this location

New bridges in Melville, NY - historical statistics
  • New bridges - historical statistics
  • 121940-1949
  • 101960-1969
  • 41990-1999
  • 12020-2022
Average Bridge Daily Traffic in Melville, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Excellent
  • 38.5%Good
  • 53.8%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Excellent
  • 50.0%Good
  • 35.7%Satisfactory
  • 7.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Excellent
  • 7.1%Very good
  • 42.9%Good
  • 42.9%Satisfactory
Find on map >>   Show street view

Structure Number: 1036981,  Location: JCT I495 & SH 110 (Lat: 40.781006,  Lng: -73.418708),  Route carried "on" structure: State highway 110,  Year Built: 1962,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 19,431 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,419 (year 2040),  Design Load: HS 20,  Features Intersected: 495I 495I 07031014, E/B,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.486,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.5m (90.2ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.22m (26.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $6,343,000,  Roadway Improvement Cost: $3,714,000,  Total Project Cost: $10,057,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1036982,  Location: JCT I495 & SH 110 (Lat: 40.780736,  Lng: -73.418581),  Route carried "on" structure: State highway 110,  Year Built: 1962,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 19,431 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,419 (year 2040),  Design Load: HS 20,  Features Intersected: 495I495I07031014, W/B, R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.486,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.5m (90.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.22m (26.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $6,343,000,  Roadway Improvement Cost: $3,714,000,  Total Project Cost: $10,057,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1049281,  Location: 1.8 MI SE JCT MSP+I495 (Lat: 40.785411,  Lng: -73.444575),  Route carried "on" structure: Interstate 495,  Year Built: 1997,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 85,517 (year 2014),  Truck Traffic: 13%,  Design Load: HS 25 or greater,  Features Intersected: ROUND SWAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 26.6m (87.3ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,014,000,  Roadway Improvement Cost: $2,351,000,  Total Project Cost: $6,364,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1049282,  Location: 1.8 MI SE JCT NSP+I495 (Lat: 40.785161,  Lng: -73.444686),  Route carried "on" structure: Interstate 495,  Year Built: 1997,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 68,823 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 72,263 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ROUND SWAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,483,000,  Roadway Improvement Cost: $2,040,000,  Total Project Cost: $5,523,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 104929,  Location: .3 MI W I-495+RTE 110 (Lat: 40.781133,  Lng: -73.424319),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 7.37m (24.18ft),  Average Daily Traffic: 5,632 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,841 (year 2040),  Design Load: HL 93,  Features Intersected: 495I495I07031011 W/B, 49,  Facility Carried by Structure: WALT WHITMAN RD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.786,  Lanes on structure: 5,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 24.5m (80.4ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 24.5m (80.4ft),  Out-to-Out Width: 28.4m (93.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.36m (24.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $8,207,000,  Roadway Improvement Cost: $4,806,000,  Total Project Cost: $13,013,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1049309,  Location: .5 MI E RTE 495+RTE 110 (Lat: 40.781975,  Lng: -73.408606),  Route carried "on" structure: County highway ,  Year Built: 1962,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 18,855 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,905 (year 2040),  Design Load: H 20,  Features Intersected: 495I 495I 07031019 WB, R,  Facility Carried by Structure: PINELAWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.928,  Lanes on structure: 5,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $6,773,000,  Roadway Improvement Cost: $3,966,000,  Total Project Cost: $10,739,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104931,  Location: 1.2 MI E JCT I495 & SH110 (Lat: 40.785094,  Lng: -73.395431),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 5,623 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,830 (year 2040),  Design Load: H 20,  Features Intersected: 495I495I07031027 WB, RT,  Facility Carried by Structure: HALF HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.142,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.41m (27.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,903,000,  Roadway Improvement Cost: $2,286,000,  Total Project Cost: $6,189,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104932,  Location: 1.7 MI W JCT RTS 231+495 (Lat: 40.788728,  Lng: -73.372975),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 10,063 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,450 (year 2040),  Design Load: H 20,  Features Intersected: 495I495I07031039, WB, RT,  Facility Carried by Structure: BAGATELLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.0m (78.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.31m (23.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,975,000,  Roadway Improvement Cost: $2,913,000,  Total Project Cost: $7,888,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105735,  Location: 1.9 MI NE JCT SH110 & NSP (Lat: 40.807331,  Lng: -73.380744),  Route carried "on" structure: Other road ,  Year Built: 1949,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 4,073 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,702 (year 2038),  Design Load: H 20,  Features Intersected: RTE 908G,  Facility Carried by Structure: CARMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $1,336,000,  Roadway Improvement Cost: $782,000,  Total Project Cost: $2,118,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1058319,  Location: .4 MI W JCT RTE 110+NSP (Lat: 40.797842,  Lng: -73.421517),  Route carried "on" structure: State highway 908G,  Year Built: 1947,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 68,003 (year 2018),  Average Future Daily Traffic: 80,889 (year 2040),  Design Load: H 20,  Features Intersected: SWEET HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,113,000,  Roadway Improvement Cost: $2,409,000,  Total Project Cost: $6,522,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105833,  Location: .5 MI E JCT RTE 110+NSP (Lat: 40.798858,  Lng: -73.404492),  Route carried "on" structure: Other road ,  Year Built: 1949,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 6,997 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,499 (year 2040),  Design Load: H 20,  Features Intersected: 908G908G07021025 EB, RTE,  Facility Carried by Structure: NEW YORK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,728,000,  Roadway Improvement Cost: $1,012,000,  Total Project Cost: $2,740,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1058349,  Location: .6 MI E JCT RTE 110+NSP (Lat: 40.798919,  Lng: -73.402217),  Route carried "on" structure: County highway ,  Year Built: 1949,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 8,666 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,527 (year 2040),  Design Load: H 20,  Features Intersected: 908G908G07021027 WB, RTE,  Facility Carried by Structure: OLD COUNTRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.894,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,326,000,  Roadway Improvement Cost: $1,948,000,  Total Project Cost: $5,274,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105835,  Location: 1.9 MI NE JCT RTE 110+NSP (Lat: 40.807125,  Lng: -73.380633),  Route carried "on" structure: Other road ,  Year Built: 1949,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 4,073 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,702 (year 2038),  Design Load: H 20,  Features Intersected: RTE 908G,  Facility Carried by Structure: CARMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $1,543,000,  Roadway Improvement Cost: $904,000,  Total Project Cost: $2,447,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1058369,  Location: 2.1 MI NE JCT RTE 110+NSP (Lat: 40.809914,  Lng: -73.379128),  Route carried "on" structure: State highway 908G,  Year Built: 1949,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 62,312 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 74,120 (year 2040),  Design Load: H 20,  Features Intersected: WOLF HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.806,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,222,000,  Roadway Improvement Cost: $1,301,000,  Total Project Cost: $3,524,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1036981,  Location: JCT I495 & SH 110 (Lat: 40.781006,  Lng: -73.418708),  Route carried "under" structure: Interstate 495,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 203,218 (year 2002),  Features Intersected: 495I 495I 07031014, E/B,,  Facility Carried by Structure: RTE 110
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 2.285,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 1036982,  Location: JCT I495 & SH 110 (Lat: 40.780736,  Lng: -73.418581),  Route carried "under" structure: Interstate 495,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 203,218 (year 2002),  Features Intersected: 495I495I07031014, W/B, R,  Facility Carried by Structure: RTE 110
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 2.285,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 1049281,  Location: 1.8 MI SE JCT MSP+I495 (Lat: 40.785411,  Lng: -73.444575),  Route carried "under" structure: Other road ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 11,943 (year 2005),  Features Intersected: ROUND SWAMP ROAD,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 1049282,  Location: 1.8 MI SE JCT NSP+I495 (Lat: 40.785161,  Lng: -73.444686),  Route carried "under" structure: Other road ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 11,943 (year 2005),  Features Intersected: ROUND SWAMP ROAD,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 1049309,  Location: .5 MI E RTE 495+RTE 110 (Lat: 40.781975,  Lng: -73.408606),  Route carried "under" structure: Interstate 495,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 203,187 (year 2002),  Features Intersected: 495I 495I 07031019 WB, R,  Facility Carried by Structure: PINELAWN ROAD
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 3.154,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 104931,  Location: 1.2 MI E JCT I495 & SH110 (Lat: 40.785094,  Lng: -73.395431),  Route carried "under" structure: Interstate 495,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 203,187 (year 2002),  Features Intersected: 495I495I07031027 WB, RT,  Facility Carried by Structure: HALF HOLLOW ROAD
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 4.312,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 104932,  Location: 1.7 MI W JCT RTS 231+495 (Lat: 40.788728,  Lng: -73.372975),  Route carried "under" structure: Interstate 495,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 200,868 (year 2002),  Features Intersected: 495I495I07031039, WB, RT,  Facility Carried by Structure: BAGATELLE RD
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 6.259,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.0m (78.7ft)

Find on map >>   Show street view

Structure Number: 105735,  Location: 1.9 MI NE JCT SH110 & NSP (Lat: 40.807331,  Lng: -73.380744),  Route carried "under" structure: State highway 908G,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 77,628 (year 2002),  Features Intersected: RTE 908G,  Facility Carried by Structure: CARMAN ROAD
Minimum Vertical Clearance: 3.91m (12.83ft),  Kilometerpoint: 6.339,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 10.7m (35.1ft)

Find on map >>   Show street view

Structure Number: 1058319,  Location: .4 MI W JCT RTE 110+NSP (Lat: 40.797842,  Lng: -73.421517),  Route carried "under" structure: Other road ,  Year Built: 1947,  Structure Length: 0. m,  Average Daily Traffic: 1,600 (year 2021),  Features Intersected: SWEET HOLLOW ROAD,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 105833,  Location: .5 MI E JCT RTE 110+NSP (Lat: 40.798858,  Lng: -73.404492),  Route carried "under" structure: State highway 908G,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 77,628 (year 2002),  Features Intersected: 908G908G07021025 EB, RTE,  Facility Carried by Structure: NEW YORK AVENUE
Minimum Vertical Clearance: 4.04m (13.25ft),  Kilometerpoint: 3.990,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 1058349,  Location: .6 MI E JCT RTE 110+NSP (Lat: 40.798919,  Lng: -73.402217),  Route carried "under" structure: State highway 908G,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 77,628 (year 2002),  Features Intersected: 908G908G07021027 WB, RTE,  Facility Carried by Structure: OLD COUNTRY ROAD
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 4.167,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 105835,  Location: 1.9 MI NE JCT RTE 110+NSP (Lat: 40.807125,  Lng: -73.380633),  Route carried "under" structure: State highway 908G,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 77,628 (year 2002),  Features Intersected: RTE 908G,  Facility Carried by Structure: CARMAN ROAD
Minimum Vertical Clearance: 3.99m (13.09ft),  Kilometerpoint: 6.339,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 1058369,  Location: 2.1 MI NE JCT RTE 110+NSP (Lat: 40.809914,  Lng: -73.379128),  Route carried "under" structure: Other road ,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 9,303 (year 2005),  Features Intersected: WOLF HILL ROAD,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 12.2m (40.0ft)