Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Philipstown, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 151ft / 45.9mTotal length
  • $55,790,000Total costs
  • 61,008Total average daily traffic
  • 2,965Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Philipstown
  • No street view available for this location

New bridges in Philipstown, NY - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 41930-1939
  • 11940-1949
  • 11960-1969
  • 11980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Philipstown, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 21990-1999
Average Bridge Daily Traffic in Philipstown, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Excellent
  • 41.7%Good
  • 25.0%Satisfactory
  • 16.7%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 8.3%Good
  • 25.0%Satisfactory
  • 41.7%Fair
  • 16.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 16.7%Good
  • 41.7%Satisfactory
  • 25.0%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 16.7%Good
  • 58.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 100517,  Location: 3.5 MI S JCT US 9 & SH301 (Lat: 41.389250,  Lng: -73.913008),  Route carried "on" structure: US 9,  Year Built: 2000,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 11,138 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,243 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: PHILIPSE BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.369,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,650,000,  Roadway Improvement Cost: $966,000,  Total Project Cost: $2,616,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 100519,  Location: 3.6 MI N JCT US 9 & SH 30 (Lat: 41.485933,  Lng: -73.907883),  Route carried "on" structure: US 9,  Year Built: 1940,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 15,284 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,429 (year 2040),  Design Load: H 20,  Features Intersected: CLOVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.881,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,815,000,  Roadway Improvement Cost: $1,063,000,  Total Project Cost: $2,877,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100629,  Location: 0.8 MI N JCT SH 9D & SH 4 (Lat: 41.385600,  Lng: -73.934806),  Route carried "on" structure: State highway 9D,  Year Built: 1929,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 9,089 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,481 (year 2040),  Design Load: H 20,  Features Intersected: PHILLIPSE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.206,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $611,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 10063,  Location: 2.0 MI. S.JCT.RTS 9D&301 (Lat: 41.404719,  Lng: -73.931408),  Route carried "on" structure: State highway 9D,  Year Built: 1929,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 19.20m (62.99ft),  Average Daily Traffic: 9,089 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,481 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN BROOK ROAD, INDIA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.314,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 6,  Length of Maximum Span: 57.9m (190.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 19.20m (62.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $16,272,000,  Roadway Improvement Cost: $9,529,000,  Total Project Cost: $25,801,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 100631,  Location: 3.4 MI.S.JCT.RTS.9D&301 (Lat: 41.418728,  Lng: -73.945969),  Route carried "on" structure: State highway 9D,  Year Built: 1929,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 7,424 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,744 (year 2040),  Design Load: HS 20,  Features Intersected: FOUNDRY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.518,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.31m (23.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $6,599,000,  Roadway Improvement Cost: $3,864,000,  Total Project Cost: $10,463,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 104528,  Location: 0.7 MI E JCT RTS 301+9 (Lat: 41.438219,  Lng: -73.900367),  Route carried "on" structure: State highway 301,  Year Built: 1938,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 2,864 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,180 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CLOVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.294,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,498,000,  Roadway Improvement Cost: $877,000,  Total Project Cost: $2,375,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104529,  Location: 1.0 MI E JCT RTS 301+9 (Lat: 41.439475,  Lng: -73.896203),  Route carried "on" structure: State highway 301,  Year Built: 1938,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 2,864 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,180 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CLOVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.680,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,691,000,  Roadway Improvement Cost: $990,000,  Total Project Cost: $2,681,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222388,  Location: AT GARRISON-UPPERGARRISON (Lat: 41.384122,  Lng: -73.946383),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 2.96m (9.71ft),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: MNRR HUDSON LINE,  Facility Carried by Structure: UPPER GARRISON STR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,033,000,  Roadway Improvement Cost: $1,191,000,  Total Project Cost: $3,224,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222389,  Location: .4 MI East of Rt. 9 (Lat: 41.478189,  Lng: -73.907769),  Route carried "on" structure: Other road ,  Year Built: 1925,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 70 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 98 (year 2036),  Features Intersected: CLOVE CREEK,  Facility Carried by Structure: HORTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 75.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $754,000,  Roadway Improvement Cost: $441,000,  Total Project Cost: $1,195,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222391,  Location: 2.7 MI NE OF N HIGHLAND (Lat: 41.487514,  Lng: -73.882458),  Route carried "on" structure: Other road ,  Year Built: 1935,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 95 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 133 (year 2040),  Features Intersected: OUTLET BEACON RESERVOIR,  Facility Carried by Structure: EAST MOUNTAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.685,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $314,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $498,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32239,  Location: 3.0MI SE OF BEACON (Lat: 41.488378,  Lng: -73.907589),  Route carried "on" structure: Other road ,  Year Built: 1984,  Status: Open,  Structure Length: 1.22m (4.00ft),  Truck Traffic: 10%,  Features Intersected: CLOVE CREEK,  Facility Carried by Structure: OLD ALBANY POST RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $641,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334569,  Location: 3.7 MI NE OF PEEKSKILL (Lat: 41.337544,  Lng: -73.904394),  Route carried "on" structure: County highway ,  Year Built: 1935,  Year Reconstructed: 1958,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,691 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,092 (year 2040),  Features Intersected: CANOPUS CREEK,  Facility Carried by Structure: SPROUT BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $494,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $784,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33457,  Location: 5.0 MI NE OF COLD SPRING (Lat: 41.480617,  Lng: -73.909297),  Route carried "on" structure: Other road ,  Year Built: 2017,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 13 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 18 (year 2038),  Features Intersected: CLOVE CREEK,  Facility Carried by Structure: MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $386,000,  Total Project Cost: $1,044,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334571,  Location: AT N HIGHLAND (Lat: 41.458561,  Lng: -73.920014),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,387 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,942 (year 2038),  Features Intersected: CLOVE CREEK,  Facility Carried by Structure: E MOUNTAIN RD S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.9m (12.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $618,000,  Roadway Improvement Cost: $362,000,  Total Project Cost: $980,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100517,  Location: 3.5 MI S JCT US 9 & SH301 (Lat: 41.389250,  Lng: -73.913008),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Features Intersected: PHILIPSE BRIDGE ROAD,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 10063,  Location: 2.0 MI. S.JCT.RTS 9D&301 (Lat: 41.404719,  Lng: -73.931408),  Route carried "under" structure: Other road ,  Year Built: 1929,  Structure Length: 0. m,  Truck Traffic: 8%,  Features Intersected: INDIAN BROOK ROAD, INDIA,  Facility Carried by Structure: RTE 9D
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Arch - Deck,  Length of Maximum Span: 57.9m (190.0ft)

Discuss Philipstown, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.