Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Woonsocket, Rhode Island (RI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 262ft / 79.6mTotal length
  • $72,193,000Total costs
  • 151,913Total average daily traffic
  • 5,428Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Woonsocket
  • No street view available for this location

New bridges in Woonsocket, RI - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 51900-1909
  • 11910-1919
  • 21920-1929
  • 11930-1939
  • 51950-1959
  • 41960-1969
  • 11980-1989
  • 11990-1999
Reconstructed bridges in Woonsocket, RI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 21980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Woonsocket, RI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 23.1%Good
  • 53.8%Satisfactory
  • 23.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Good
  • 22.2%Satisfactory
  • 50.0%Fair
  • 16.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.8%Good
  • 33.3%Satisfactory
  • 16.7%Fair
  • 22.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 58.8%Good
  • 23.5%Satisfactory
  • 17.6%Fair
Find on map >>   Show street view

Structure Number: 5,  Location: 0.5 Mi W of JCT RI 3 (Lat: 41.423417,  Lng: -71.791764),  Route carried "on" structure: State highway ,  Year Built: 1900,  Year Reconstructed: 1978,  Status: Posted for load,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 1,111 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,334 (year 2036),  Design Load: HS 20,  Features Intersected: ASHAWAY RIVER,  Facility Carried by Structure: LAUREL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.370,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.3m (53.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $593,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5,  Location: 2.0 Mi N of JCT RI 120 (Lat: 42.003089,  Lng: -71.498208),  Route carried "on" structure: State highway 122,  Year Built: 1959,  Status: Open,  Structure Length: 10.80m (35.43ft),  Average Daily Traffic: 20,000 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,000 (year 2041),  Design Load: H 20,  Features Intersected: BLACKSTONE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.655,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 57.9m (190.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.83m (35.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $6,755,000,  Roadway Improvement Cost: $676,000,  Total Project Cost: $10,133,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 687,  Location: 200ft N of JCT RI 122 (Lat: 42.002744,  Lng: -71.505269),  Route carried "on" structure: City street ,  Year Built: 1913,  Status: Posted for load,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 1,690 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,859 (year 2041),  Design Load: H 15,  Features Intersected: P&W RR,  Facility Carried by Structure: HARRISON AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.066,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.5m (57.4ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Superstructure: Poor,  Substructure: Poor,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $27,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $41,000
Find on map >>   Show street view

Structure Number: 688,  Location: 0.04 Mi E of Jct RI 126 (Lat: 42.012189,  Lng: -71.500611),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,860 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,046 (year 2041),  Design Load: HS 20,  Features Intersected: PETERS RIVER,  Facility Carried by Structure: MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.072,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $293,000
Find on map >>   Show street view

Structure Number: 689,  Location: 0.1 Mi W of Bernon St (Lat: 42.000661,  Lng: -71.518211),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 1,595 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,755 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER,  Facility Carried by Structure: SAYLES ST
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.056,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $1,247,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,870,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 939,  Location: 0.2 Mi E of RI 122 (Lat: 42.006789,  Lng: -71.516514),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 4,539 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,993 (year 2041),  Design Load: HS 20,  Features Intersected: P&W RR,  Facility Carried by Structure: BLACKSTONE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.336,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.4m (37.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $422,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 94,  Location: 0.3 Mi W of RI 126 N Main (Lat: 42.004831,  Lng: -71.519064),  Route carried "on" structure: State highway 122,  Year Built: 1929,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 3,709 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,080 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.605,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.2m (46.6ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,267,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $3,400,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 944,  Location: 0.1 Mi N of High St (Lat: 42.004358,  Lng: -71.517378),  Route carried "on" structure: State highway 122,  Year Built: 1908,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 4,175 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,593 (year 2041),  Design Load: HS 20,  Features Intersected: P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.445,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $254,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 952,  Location: 0.2 Mi E of Park Av (Lat: 42.000236,  Lng: -71.513203),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 8.01m (26.28ft),  Average Daily Traffic: 7,085 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,794 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER,  Facility Carried by Structure: BERNON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.285,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.2m (141.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.11m (26.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $602,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $903,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 953,  Location: 0.1 Mi S of JCT RI 114 (Lat: 42.014944,  Lng: -71.498044),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 6,592 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,251 (year 2041),  Design Load: HS 20,  Features Intersected: PETERS RIVER,  Facility Carried by Structure: WOOD AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.099,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $715,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,073,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 954,  Location: 0.3 Mi E of Social St (Lat: 42.015536,  Lng: -71.493106),  Route carried "on" structure: State highway 114,  Year Built: 1926,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 12,300 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,530 (year 2041),  Design Load: HS 20,  Features Intersected: PETERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.720,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $156,000
Find on map >>   Show street view

Structure Number: 955,  Location: 0.5 Mi S of Mass Line (Lat: 42.009944,  Lng: -71.529428),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 1,509 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,660 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER,  Facility Carried by Structure: SINGLETON ST
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.079,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 59.7m (195.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $1,370,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,055,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 956,  Location: 0.3 Mi S of Mass Line (Lat: 42.005194,  Lng: -71.524850),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 4,458 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,904 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER,  Facility Carried by Structure: RIVER ST
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 1.025,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 61.3m (201.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $1,171,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,757,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 957,  Location: 0.8 Mi W of River St (Lat: 42.002350,  Lng: -71.525022),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 3,293 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,622 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER,  Facility Carried by Structure: FAIRMOUNT ST
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.964,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 59.7m (195.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $832,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,248,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 958,  Location: 0.1 Mi W of Arnold St (Lat: 41.999003,  Lng: -71.518047),  Route carried "on" structure: State highway 104,  Year Built: 1903,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 13,424 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,766 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.579,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $4,652,000,  Roadway Improvement Cost: $465,000,  Total Project Cost: $6,978,000
Find on map >>   Show street view

Structure Number: 9582,  Location: 0.1 Mi W of Arnold St (Lat: 41.999161,  Lng: -71.517614),  Route carried "on" structure: State highway 104,  Year Built: 1903,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 13,424 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,766 (year 2041),  Features Intersected: BLACKSTONE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.619,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $4,652,000,  Roadway Improvement Cost: $465,000,  Total Project Cost: $6,978,000
Find on map >>   Show street view

Structure Number: 959,  Location: 200 FT NW JCT RI126x104 (Lat: 42.002497,  Lng: -71.511758),  Route carried "on" structure: State highway 122,  Year Built: 1895,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 15.73m (51.61ft),  Average Daily Traffic: 10,965 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,062 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.841,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 49.7m (163.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.73m (51.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $5,065,000,  Roadway Improvement Cost: $507,000,  Total Project Cost: $7,598,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 961,  Location: 0.1 Mi E of JCT RI 126 (Lat: 42.009275,  Lng: -71.506536),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 12,000 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,400 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: MILL RIVER CONDUIT,  Facility Carried by Structure: SOCIAL/CLINTON STS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.043,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.2m (56.4ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $15,619,000,  Roadway Improvement Cost: $1,562,000,  Total Project Cost: $23,429,000
Find on map >>   Show street view

Structure Number: 962,  Location: 0.2 Mi E of Pond St (Lat: 42.010764,  Lng: -71.508997),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 2.76m (9.06ft),  Average Daily Traffic: 4,782 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,260 (year 2041),  Features Intersected: MILL RIVER,  Facility Carried by Structure: EAST SCHOOL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.441,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.2m (43.3ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $966,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,448,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 963,  Location: 0.3 Mi W of Rathborn St (Lat: 42.014525,  Lng: -71.507986),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 9,981 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,979 (year 2041),  Design Load: HS 20,  Features Intersected: MILL RIVER,  Facility Carried by Structure: PRIVILEGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 73.119,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.1m (105.3ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $83,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $125,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 998,  Location: 0.1 Mi SE of JCT SOCIAL (Lat: 42.009550,  Lng: -71.500694),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 2,456 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,702 (year 2041),  Design Load: HS 20,  Features Intersected: Peters River,  Facility Carried by Structure: ELM ST/CMBRLND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.126,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.9m (68.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $959,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,439,000
Find on map >>   Show street view

Structure Number: 959,  Location: 200 FT NW JCT RI126x104 (Lat: 42.002497,  Lng: -71.511758),  Route carried "under" structure: City street ,  Year Built: 1895,  Structure Length: 0. m,  Average Daily Traffic: 10,965 (year 2021),  Truck Traffic: 3%,  Features Intersected: BLACKSTONE RIVER,  Facility Carried by Structure: RI 122 COURT ST
Minimum Vertical Clearance: 9.60m (31.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.7m (163.1ft)

Discuss Woonsocket, Rhode Island (RI) on our hugely popular Rhode Island forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.