![]() |
Bridge Statistics for Acton, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Acton, MA, Massachusetts, Massachusetts forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 26 Total length: 53 meters (174ft) Total costs: $7,592,000 Total average daily traffic: 371,100 Total average daily truck traffic: 11,395 National Bridge Inventory (NBI) Registered Bridges for Acton
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: A0200128RMHDNBI, Location: .1 MI NW. OF CONCORD LINE (Lat: 42.440719, Lng: -71.430125), Route carried "on" structure: State highway 62, Year Built: 1953, Status: Open, Structure Length: 2.37m (7.78ft), Average Daily Traffic: 27,800 (year 2008), Truck Traffic: 10%, Average Future Daily Traffic: 43,905 (year 2029), Design Load: H 20, Features Intersected: WATER ASSABET RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 70.384, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.6m (74.1ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 1.7m (5.6ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 15.0m (49.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Fair, Operating Rating: 35.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 17.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.40m (7.87ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: Febuary 2008, Underwater Inspection Date: July 2007, Bridge Improvement Cost: $643,000, Roadway Improvement Cost: $65,000, Total Project Cost: $965,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: A0200429AMHD634, Location: 1.2 MI SOUTH OF RTE. 2 (Lat: 42.460025, Lng: -71.455322), Route carried "on" structure: State highway 27, Year Built: 1906, Year Reconstructed: 1997, Status: Open, Structure Length: 2.44m (8.01ft), Average Daily Traffic: 13,600 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 21,478 (year 2029), Design Load: HS 20, Features Intersected: RR MBTA/BMRR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 99.786, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.1m (43.0ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 1.7m (5.6ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 55.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.50m (8.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $150,000, Roadway Improvement Cost: $16,000, Total Project Cost: $226,000 ( Estimate for 2006), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: A0200628KMHDNBI, Location: 1.5 MI W RT 2 & ST 111 (Lat: 42.475878, Lng: -71.468567), Route carried "on" structure: State highway 111, Year Built: 1907, Year Reconstructed: 1998, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 7,700 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 12,161 (year 2027), Features Intersected: WATER FORT POND BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.826, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.7m (8.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft), Curb-To-Curb Width: 8.1m (26.6ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 31.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 18.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: December 2006, Underwater Inspection Date: July 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: A0200723XMUNNBI, Location: .6MI.S.OF ST.2 (Lat: 42.463750, Lng: -71.423000), Route carried "on" structure: City street , Year Built: 1928, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 3,300 (year 2008), Truck Traffic: 6%, Average Future Daily Traffic: 5,212 (year 2029), Features Intersected: WATER FORT POND BROOK, Facility Carried by Structure: HWY LAWSBROOK RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.032, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.7m (28.5ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 55.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.80m (2.62ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: January 2008, Underwater Inspection Date: March 2007, Bridge Improvement Cost: $189,000, Roadway Improvement Cost: $19,000, Total Project Cost: $284,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: A02008255MUNNBI, Location: O.9 MI. S.E. OF ST-27 (Lat: 42.456869, Lng: -71.437225), Route carried "on" structure: City street , Year Built: 1937, Status: Open, Structure Length: 1.58m (5.18ft), Average Daily Traffic: 2,000 (year 2007), Truck Traffic: 2%, Average Future Daily Traffic: 3,159 (year 2028), Features Intersected: WATER FORT POND BROOK, Facility Carried by Structure: HWY RIVER ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.288, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.8m (19.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 6.2m (20.3ft), Out-to-Out Width: 7.6m (24.9ft) Condition: Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 31.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 1.60m (5.25ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $218,000, Roadway Improvement Cost: $22,000, Total Project Cost: $328,000 ( Estimate for 2006) Find on map >>
Structure Number: A0200923YMUNNBI, Location: .25 MI. W OF RTE. 2A (Lat: 42.493983, Lng: -71.420903), Route carried "on" structure: City street , Year Built: 1938, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 8,060 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 12,729 (year 2028), Features Intersected: WATER NASHOBA BROOK, Facility Carried by Structure: HWY BROOK ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.354, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.4m (11.2ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.60m (1.97ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: December 2007, Underwater Inspection Date: April 2007, Bridge Improvement Cost: $204,000, Roadway Improvement Cost: $21,000, Total Project Cost: $307,000 ( Estimate for 2006) Find on map >>
Structure Number: A02010256MUNNBI, Location: CORNER OF CLOVER HILL RD (Lat: 42.457961, Lng: -71.434364), Route carried "on" structure: City street , Year Built: 1938, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 1,600 (year 2008), Truck Traffic: 6%, Average Future Daily Traffic: 2,527 (year 2029), Features Intersected: WATER FORT POND BROOK, Facility Carried by Structure: HWY PARKER ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.241, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft) Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 31.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 18 months, Inspection Date: January 2008, Bridge Improvement Cost: $142,000, Roadway Improvement Cost: $15,000, Total Project Cost: $214,000 ( Estimate for 2006), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: A02011257MUNNBI, Location: 0.5MI N OF RT.2 (Lat: 42.475014, Lng: -71.411475), Route carried "on" structure: City street , Year Built: 1997, Status: Open, Structure Length: 1.46m (4.79ft), Average Daily Traffic: 780 (year 2008), Truck Traffic: 3%, Average Future Daily Traffic: 1,232 (year 2029), Design Load: HS 20, Features Intersected: WATER NASHOBA BROOK, Facility Carried by Structure: HWY WETHERBEE ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.338, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.5m (24.6ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 1.3m (4.3ft), Curb-To-Curb Width: 7.5m (24.6ft), Out-to-Out Width: 9.8m (32.2ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 59.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.70m (2.30ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: January 2008, Underwater Inspection Date: July 2007, Bridge Improvement Cost: $310,000, Roadway Improvement Cost: $32,000, Total Project Cost: $466,000 ( Estimate for 2006) Find on map >>
Structure Number: A02012286MHDNBI, Location: 1 MI.STH.OF ST.111 (Lat: 42.459253, Lng: -71.454964), Route carried "on" structure: State highway 27, Year Built: 1900, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 11,300 (year 2008), Truck Traffic: 5%, Average Future Daily Traffic: 17,846 (year 2029), Design Load: H 20, Features Intersected: WATER FORT POND BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 99.981, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Masonry, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.70m (2.30ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: Febuary 2008, Underwater Inspection Date: November 2005, Bridge Improvement Cost: $90,000, Roadway Improvement Cost: $10,000, Total Project Cost: $136,000 ( Estimate for 2006) Find on map >>
Structure Number: A0201326KMHDNBI, Location: 0.25 MI S RT27 &2A (Lat: 42.499106, Lng: -71.418928), Route carried "on" structure: State highway 119, Year Built: 1940, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 31,100 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 49,116 (year 2028), Design Load: H 20, Features Intersected: WATER NASHOBA BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 53.342, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 46.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 28.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.90m (2.95ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 48 months, Inspection Date: September 2007, Underwater Inspection Date: July 2005, Bridge Improvement Cost: $216,000, Roadway Improvement Cost: $22,000, Total Project Cost: $325,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: A02018240MUNNBI, Location: .1 MI W OF RTE 2A (Lat: 42.477889, Lng: -71.415233), Route carried "on" structure: City street , Year Built: 1994, Status: Open, Structure Length: 0.61m (2.00ft), Average Daily Traffic: 7,700 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 12,161 (year 2028), Features Intersected: WATER NASHOBA BROOK, Facility Carried by Structure: HWY CONCORD RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.161, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.7m (8.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.8m (35.4ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.70m (2.30ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: January 2007, Underwater Inspection Date: August 2006, Bridge Improvement Cost: $182,000, Roadway Improvement Cost: $19,000, Total Project Cost: $274,000 ( Estimate for 2006) Find on map >>
Structure Number: A02020258MUNNBI, Location: .8 MI. E OF ST. 27 (Lat: 42.458367, Lng: -71.440833), Route carried "on" structure: City street , Year Built: 1981, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 500 (year 2008), Truck Traffic: 6%, Average Future Daily Traffic: 790 (year 2029), Design Load: H 20, Features Intersected: WATER FORT POND BROOK, Facility Carried by Structure: HWY RIVER ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.046, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 8.6m (28.2ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.40m (1.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $131,000, Roadway Improvement Cost: $14,000, Total Project Cost: $197,000 ( Estimate for 2006) Find on map >>
Structure Number: A02021259MUNNBI, Location: ACROSS FROM VANDERBELT ST (Lat: 42.459328, Lng: -71.442936), Route carried "on" structure: City street , Year Built: 1981, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 600 (year 2008), Truck Traffic: 15%, Average Future Daily Traffic: 948 (year 2029), Features Intersected: WATER FORT POND BROOK, Facility Carried by Structure: HWY RIVER ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.2m (17.1ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.7m (8.9ft), Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.60m (1.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $171,000, Roadway Improvement Cost: $18,000, Total Project Cost: $257,000 ( Estimate for 2006) Find on map >>
Structure Number: A0202225AMUNNBI, Location: .3MI. W. OF ST-27 (Lat: 42.458208, Lng: -71.460269), Route carried "on" structure: City street , Year Built: 1924, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 860 (year 2006), Truck Traffic: 1%, Average Future Daily Traffic: 1,358 (year 2027), Features Intersected: WATER FORT POND BROOK, Facility Carried by Structure: HWY STOW ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.207, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 7.4m (24.3ft), Out-to-Out Width: 8.3m (27.2ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 31.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $149,000, Roadway Improvement Cost: $15,000, Total Project Cost: $224,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: A0202325BMUNNBI, Location: 0.2 MI S. OF CENTRAL ST. (Lat: 42.458803, Lng: -71.462500), Route carried "on" structure: City street , Year Built: 1965, Status: Open, Structure Length: 0.64m (2.10ft), Average Daily Traffic: 3,300 (year 2008), Truck Traffic: 6%, Average Future Daily Traffic: 5,212 (year 2029), Design Load: H 20, Features Intersected: WATER FORT POND BROOK, Facility Carried by Structure: HWY MARTIN ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.386, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.7m (8.9ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 31.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 0.90m (2.95ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $101,000, Roadway Improvement Cost: $11,000, Total Project Cost: $152,000 ( Estimate for 2006) Find on map >>
Structure Number: A0202928JMHDNBI, Location: RT 111 AT RT 2 (Lat: 42.474050, Lng: -71.445900), Route carried "on" structure: State highway 2, Year Built: 1950, Year Reconstructed: 1990, Status: Open, Structure Length: 1.43m (4.69ft), Average Daily Traffic: 35,000 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 55,276 (year 2027), Design Load: H 20, Features Intersected: ST 2 EB, Facility Carried by Structure: ST111 NB/MASS AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.299, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.7m (35.1ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.50m (4.92ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $135,000, Roadway Improvement Cost: $14,000, Total Project Cost: $203,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: A02035295MHDNBI, Location: 1 MI NW RTE 27 (Lat: 42.491036, Lng: -71.460419), Route carried "on" structure: City street , Year Built: 1950, Year Reconstructed: 1990, Status: Open, Structure Length: 3.41m (11.19ft), Average Daily Traffic: 550 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 869 (year 2028), Design Load: HS 20, Features Intersected: ST 2, Facility Carried by Structure: HWY ARLINGTON ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.529, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 14.9m (48.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 13.3m (43.6ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 66.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.50m (11.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $450,000, Roadway Improvement Cost: $46,000, Total Project Cost: $676,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: A02036294MHDNBI, Location: 0.25 MI NW RT 27 (Lat: 42.481139, Lng: -71.451336), Route carried "on" structure: City street , Year Built: 1950, Year Reconstructed: 1990, Status: Open, Structure Length: 4.79m (15.72ft), Average Daily Traffic: 3,000 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 4,738 (year 2028), Design Load: HS 20, Features Intersected: ST 2, Facility Carried by Structure: HWY HAYWARD RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.448, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 2, Length of Maximum Span: 14.6m (47.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.5m (1.6ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 13.3m (43.6ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.80m (15.75ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $617,000, Roadway Improvement Cost: $62,000, Total Project Cost: $926,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: A02037287MHDNBI, Location: RT 27 AT RT 2 (Lat: 42.477914, Lng: -71.449267), Route carried "on" structure: State highway 27, Year Built: 1952, Year Reconstructed: 1987, Status: Open, Structure Length: 3.11m (10.20ft), Average Daily Traffic: 11,300 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 17,846 (year 2027), Design Load: H 20, Features Intersected: ST 2 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 102.026, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 14.6m (47.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.1m (6.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 16.7m (54.8ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 67.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.20m (10.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $954,000, Roadway Improvement Cost: $96,000, Total Project Cost: $1,432,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: A0202928JMHDNBI, Location: RT 111 AT RT 2 (Lat: 42.466667, Lng: -71.450000), Route carried "under" structure: State highway 2, Year Built: 1951, Structure Length: 1.43m (4.69ft), Average Daily Traffic: 33,550 (year 0 ), Features Intersected: ST 2 EB Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 13.7m (44.9ft) Find on map >>
Structure Number: A02035295MHDNBI, Location: 1 MI NW RT 27 (Lat: 42.483333, Lng: -71.466667), Route carried "under" structure: State highway 2, Year Built: 1950, Structure Length: 3.41m (11.19ft), Average Daily Traffic: 33,500 (year 0 ), Features Intersected: ST 2 EB, Facility Carried by Structure: HWY ARLINGTON ST Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.9m (48.9ft) Find on map >>
Structure Number: A02035295MHDNBI, Location: 1 MI NW RT 27 (Lat: 42.483333, Lng: -71.466667), Route carried "under" structure: State highway 2, Year Built: 1950, Structure Length: 3.41m (11.19ft), Average Daily Traffic: 33,500 (year 0 ), Features Intersected: ST 2 WB, Facility Carried by Structure: HWY ARLINGTON ST Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.9m (48.9ft) Find on map >>
Structure Number: A02036294MHDNBI, Location: 0.25 MI NW RT 27 (Lat: 42.483333, Lng: -71.450000), Route carried "under" structure: State highway 2, Year Built: 1950, Structure Length: 4.79m (15.72ft), Average Daily Traffic: 6,000 (year 0 ), Features Intersected: ST 2 EB, Facility Carried by Structure: HWY HAYWARD RD Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.6m (47.9ft) Find on map >>
Structure Number: A02036294MHDNBI, Location: 0.25 MI NW RT 27 (Lat: 42.483333, Lng: -71.450000), Route carried "under" structure: State highway 2, Year Built: 1950, Structure Length: 4.79m (15.72ft), Average Daily Traffic: 33,500 (year 0 ), Features Intersected: ST 2 WB, Facility Carried by Structure: HWY HAYWARD RD Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.6m (47.9ft) Find on map >>
Structure Number: A02037287MHDNBI, Location: RT 27 AT RT 2 (Lat: 42.483333, Lng: -71.450000), Route carried "under" structure: State highway 2, Year Built: 1952, Structure Length: 3.11m (10.20ft), Average Daily Traffic: 30,500 (year 0 ), Features Intersected: ST 2 EB Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.6m (47.9ft) Find on map >>
Structure Number: A02037287MHDNBI, Location: RT 27 AT RT 2 (Lat: 42.483333, Lng: -71.450000), Route carried "under" structure: State highway 2, Year Built: 1952, Structure Length: 3.11m (10.20ft), Average Daily Traffic: 30,500 (year 0 ), Features Intersected: ST 2 WB Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.6m (47.9ft) Discuss this city on our hugely popular Massachusetts forum Back to: Acton, MA, Massachusetts, All US cities.
|
![]() |