Bridge Statistics for Adel, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 210ft / 63.9mTotal length
  • $36,447,000Total costs
  • 176,450Total average daily traffic
  • 7,096Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Adel
  • No street view available for this location

New bridges in Adel, GA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21940-1949
  • 71960-1969
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 22000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Adel, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Adel, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 88.9%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 66.7%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 88.9%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 31.3%Very good
  • 43.8%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 63.6%Good
  • 36.4%Satisfactory
Find on map >>   Show street view

Structure Number: 750005,  Location: IN EAST ADEL (Lat: 31.138839,  Lng: -83.416428),  Route carried "on" structure: State highway 37,  Year Built: 1970,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 5,700 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,550 (year 2031),  Design Load: HS 15,  Features Intersected: BEAR BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $867,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750006,  Location: IN EAST ADEL (Lat: 31.139428,  Lng: -83.413028),  Route carried "on" structure: State highway 37,  Year Built: 1933,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,700 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,550 (year 2031),  Design Load: H 15,  Features Intersected: SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 750007,  Location: APP 3.5 MI E OF ADEL (Lat: 31.131608,  Lng: -83.367169),  Route carried "on" structure: State highway 37,  Year Built: 1949,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,970 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,955 (year 2031),  Design Load: H 15,  Features Intersected: INDIAN TRAIL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 750011,  Location: APP 2 MI S OF ADEL (Lat: 31.117850,  Lng: -83.440389),  Route carried "on" structure: State highway 76,  Year Built: 1942,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,730 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,595 (year 2031),  Design Load: H 15,  Features Intersected: MORRISON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 750012,  Location: APP 3 MI E NE OF ADEL (Lat: 31.143397,  Lng: -83.375389),  Route carried "on" structure: State highway 76,  Year Built: 1933,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,160 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,240 (year 2031),  Design Load: H 15,  Features Intersected: INDIAN TRAIL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 750018,  Location: SOUTH ADEL (Lat: 31.112689,  Lng: -83.427828),  Route carried "on" structure: County highway 216,  Year Built: 1960,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 1,980 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,970 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 37),  Facility Carried by Structure: ADEL-QUITMAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,114,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750021,  Location: SOUTH ADEL (Lat: 31.124858,  Lng: -83.434139),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 10.45m (34.28ft),  Average Daily Traffic: 35,300 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 52,950 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 76 NOR-SOU RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.155,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 38.1m (125.0ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 38.3m (125.7ft),  Out-to-Out Width: 40.2m (131.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,802,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $4,203,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 750033,  Location: APP 2 MI S OF ADEL (Lat: 31.119358,  Lng: -83.442689),  Route carried "on" structure: County highway 1296,  Year Built: 1960,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 1,040 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,560 (year 2031),  Design Load: H 15,  Features Intersected: MORRISON CREEK,  Facility Carried by Structure: ANTIOCH CHURCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 42.06m (137.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $358,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 750037,  Location: IN NE ADEL (Lat: 31.148539,  Lng: -83.420789),  Route carried "on" structure: City street 4211,  Year Built: 1962,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 2,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,615 (year 2031),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: EAST MITCHELL ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $322,000
Find on map >>   Show street view

Structure Number: 755038,  Location: SOUTH SECTION OF ADEL (Lat: 31.125297,  Lng: -83.416458),  Route carried "on" structure: City street 214,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,460 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,190 (year 2031),  Design Load: H 15,  Features Intersected: BEAR CREEK TRIB,  Facility Carried by Structure: SOUTH GORDON AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 755039,  Location: APP 3 MI SW OF ADEL (Lat: 31.110408,  Lng: -83.431447),  Route carried "on" structure: County highway 216,  Year Built: 1960,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 830 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,245 (year 2032),  Design Load: H 15,  Features Intersected: MORRISON CREEK,  Facility Carried by Structure: OLD QUITMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 755044,  Location: APP 4.5 MI SW OF ADEL (Lat: 31.078378,  Lng: -83.466128),  Route carried "on" structure: County highway 243,  Year Built: 1969,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 610 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 915 (year 2031),  Design Load: H 15,  Features Intersected: WELLS MILL CREEK TRIB,  Facility Carried by Structure: OLD UNION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 755049,  Location: IN EAST ADEL (Lat: 31.136389,  Lng: -83.415239),  Route carried "on" structure: City street 690,  Year Built: 1980,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 200 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2031),  Design Load: HS 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: E. SIXTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 755051,  Location: APP 1 MI SE OF SPARKS (Lat: 31.154889,  Lng: -83.426939),  Route carried "on" structure: County highway 267,  Year Built: 1995,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 770 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,155 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: KENT DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $182,000
Find on map >>   Show street view

Structure Number: 755052,  Location: 3 MI EAST OF ADEL (Lat: 31.165678,  Lng: -83.358278),  Route carried "on" structure: County highway 37,  Year Built: 1999,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 830 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,245 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: YOUNGS MILL CREEK,  Facility Carried by Structure: HUTCHINSON PARRISH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 755054,  Location: WEST ADEL (Lat: 31.136025,  Lng: -83.438917),  Route carried "on" structure: State highway 37,  Year Built: 2006,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 7,900 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,850 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 39)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 25 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 25.2m (82.7ft),  Out-to-Out Width: 31.2m (102.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,075,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $3,113,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 75506,  Location: IN NORTH WEST ADEL (Lat: 31.147758,  Lng: -83.443289),  Route carried "on" structure: City street 4211,  Year Built: 2008,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 970 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,455 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-75,  Facility Carried by Structure: WEST MITCHELL ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.9m (144.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,121,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,682,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 755061,  Location: N ADEL (Lat: 31.151061,  Lng: -83.428031),  Route carried "on" structure: US 41,  Year Built: 2010,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 5,450 (year 2011),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,175 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: GIDDENS MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $508,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $762,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 755063,  Location: APP 3.7 MI SE OF ADEL (Lat: 31.121758,  Lng: -83.362250),  Route carried "on" structure: County highway 84,  Year Built: 2011,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 750 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,125 (year 2031),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: COMMUNITY CH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $246,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $369,000
Find on map >>   Show street view

Structure Number: 755065,  Location: 5 MI SW OF ADEL (Lat: 31.072189,  Lng: -83.459589),  Route carried "on" structure: County highway 243,  Year Built: 2021,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 600 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 600 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: MORRISON CREEK,  Facility Carried by Structure: OLD UNION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $14,208,000,  Roadway Improvement Cost: $1,420,000,  Total Project Cost: $21,312,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 750018,  Location: SOUTH ADEL (Lat: 31.112689,  Lng: -83.427828),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 40,100 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 216 ADEL-QUITMAN RD,  Facility Carried by Structure: ADEL-QUITMAN RD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 59.546,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 750021,  Location: SOUTH ADEL (Lat: 31.124858,  Lng: -83.434139),  Route carried "under" structure: State highway 76,  Structure Length: 0. m,  Average Daily Traffic: 6,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75,  Facility Carried by Structure: I-75
Minimum Vertical Clearance: 7.87m (25.82ft),  Kilometerpoint: 11.265,  Lanes on structure: 6,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 755054,  Location: WEST ADEL (Lat: 31.136025,  Lng: -83.438917),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 10,190 (year 2003),  Truck Traffic: 5%,  Features Intersected: SR 37,  Facility Carried by Structure: SR 37
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 62.764,  Lanes on structure: 6,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 75506,  Location: IN NORTH WEST ADEL (Lat: 31.147758,  Lng: -83.443289),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 41,500 (year 1999),  Truck Traffic: 10%,  Features Intersected: M-4211 WEST MITCHELL ST.,  Facility Carried by Structure: WEST MITCHELL ST.
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 64.374,  Lanes on structure: 2,  Length of Maximum Span: 0.0m