![]() |
Bridge Statistics for Albany, California (CA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Albany, CA, California, California forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 14 Total length: 614 meters (2,014ft) Total costs: $21,217,000 Total average daily traffic: 544,712 Total average daily truck traffic: 40,570 National Bridge Inventory (NBI) Registered Bridges for Albany
Bridge Condition - Deck Bridge Condition - Superstructure Find on map >>
Structure Number: 33 0051L, Location: 04-ALA-080-7.2-ALB (Lat: 37.888306, Lng: -122.309167), Route carried "on" structure: Interstate 80, Year Built: 1960, Year Reconstructed: 1998, Status: Open, Structure Length: 64.37m (211.19ft), Average Daily Traffic: 129,500 (year 1998), Truck Traffic: 9%, Average Future Daily Traffic: 139,104 (year 2029), Design Load: HS 20, Features Intersected: UP,BNSF,AMTRAK,E80-W580 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.200, Lanes on structure: 6, Lanes under structure: 19, Base Highway Network: Yes (, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 15.8m (51.8ft), Skew: 9 degrees, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 31, Number Of Approach Spans: 2, Length of Maximum Span: 38.4m (126.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 14.0m (45.9ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 64.37m (211.19ft), Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 48 months, Inspection Date: April 2007, Other Special Inspection Date: January 2006, Bridge Improvement Cost: $10,814,000, Roadway Improvement Cost: $1,081,000, Total Project Cost: $16,221,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Bituminous Find on map >>
Structure Number: 33 0051R, Location: 04-ALA-080-7.2-ALB (Lat: 37.887167, Lng: -122.308611), Route carried "on" structure: Interstate 80, Year Built: 1999, Status: Open, Structure Length: 64.30m (210.96ft), Average Daily Traffic: 129,500 (year 1998), Truck Traffic: 9%, Average Future Daily Traffic: 139,104 (year 2029), Design Load: HS 20+Mod, Features Intersected: UP RR,BNSF,AMTRAK,I 580 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.200, Lanes on structure: 4, Lanes under structure: 8, Base Highway Network: Yes (, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 17, Length of Maximum Span: 42.7m (140.1ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 21.8m (71.5ft) Condition: Deck: Fair, Superstructure: Very good, Substructure: Good, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 33 0156, Location: 04-ALA-580-48.04-ALB (Lat: 37.897069, Lng: -122.311311), Route carried "on" structure: Interstate 580, Year Built: 1991, Status: Open, Structure Length: 1.95m (6.40ft), Average Daily Traffic: 94,000 (year 1999), Truck Traffic: 15%, Average Future Daily Traffic: 146,607 (year 2028), Design Load: HS 20+Mod, Features Intersected: CERRITO CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 48.040, Lanes on structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 32.9m (107.9ft), Skew: 30 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 2, Length of Maximum Span: 9.4m (30.8ft), Curb-To-Curb Width: 38.0m (124.7ft), Out-to-Out Width: 43.8m (143.7ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 33C0184, Location: NEAR I-80 (Lat: 37.887778, Lng: -122.307778), Route carried "on" structure: City street A013, Year Built: 1963, Status: Open, Structure Length: 13.81m (45.31ft), Average Daily Traffic: 10,629 (year 1977), Truck Traffic: 5%, Average Future Daily Traffic: 26,106 (year 2028), Design Load: HS 20, Features Intersected: UP RR, BNSF RY, & AMTRAK, Facility Carried by Structure: BUCHANAN ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 20.1m (65.9ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 10, Number Of Approach Spans: 5, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 20.1m (65.9ft) Condition: Deck: Poor, Superstructure: Good, Substructure: Good, Operating Rating: 45.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 13.81m (45.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $3,331,000, Roadway Improvement Cost: $333,000, Total Project Cost: $4,996,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 33 0051L, Location: 04-ALA-080-7.2-ALB (Lat: 37.888306, Lng: -122.309167), Route carried "under" structure: Interstate 580, Year Built: 1960, Structure Length: 64.37m (211.19ft), Average Daily Traffic: 41,550 (year 1997), Truck Traffic: 2%, Features Intersected: UP,BNSF,AMTRAK,E80-W580, Facility Carried by Structure: INTERSTATE 80 WB Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 4.734, Lanes on structure: 6, Lanes under structure: 11, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 38.4m (126.0ft) Find on map >>
Structure Number: 33 0051L, Location: 04-ALA-080-7.2-ALB (Lat: 37.888306, Lng: -122.309167), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 64.37m (211.19ft), Average Daily Traffic: 1,000 (year 1998), Truck Traffic: 1%, Features Intersected: UP,BNSF,AMTRAK,E80-W580, Facility Carried by Structure: INTERSTATE 80 WB Minimum Vertical Clearance: 6.27m (20.57ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 38.4m (126.0ft) Find on map >>
Structure Number: 33 0051L, Location: 04-ALA-080-7.2-ALB (Lat: 37.888306, Lng: -122.309167), Route carried "under" structure: City street A013, Year Built: 1960, Structure Length: 64.37m (211.19ft), Average Daily Traffic: 500 (year 1998), Truck Traffic: 1%, Features Intersected: UP,BNSF,AMTRAK,E80-W580, Facility Carried by Structure: INTERSTATE 80 WB Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 38.4m (126.0ft) Find on map >>
Structure Number: 33 0051R, Location: 04-ALA-080-7.2-ALB (Lat: 37.887167, Lng: -122.308611), Route carried "under" structure: Ramp Interstate 580, Year Built: 1999, Structure Length: 64.30m (210.96ft), Average Daily Traffic: 82,000 (year 1997), Truck Traffic: 1%, Features Intersected: UP RR,BNSF,AMTRAK,I 580, Facility Carried by Structure: I 80 EB Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 0.473, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.7m (140.1ft) Find on map >>
Structure Number: 33 0051R, Location: 04-ALA-080-7.2-ALB (Lat: 37.887167, Lng: -122.308611), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 64.30m (210.96ft), Average Daily Traffic: 500 (year 2000), Truck Traffic: 1%, Features Intersected: UP RR,BNSF,AMTRAK,I 580, Facility Carried by Structure: I 80 EB Minimum Vertical Clearance: 8.53m (27.99ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.7m (140.1ft) Find on map >>
Structure Number: 33 0051R, Location: 04-ALA-080-7.2-ALB (Lat: 37.887167, Lng: -122.308611), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 64.30m (210.96ft), Average Daily Traffic: 500 (year 2000), Truck Traffic: 1%, Features Intersected: UP RR,BNSF,AMTRAK,I 580, Facility Carried by Structure: I 80 EB Minimum Vertical Clearance: 7.47m (24.51ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.7m (140.1ft) Find on map >>
Structure Number: 33 0051R, Location: 04-ALA-080-7.2-ALB (Lat: 37.887167, Lng: -122.308611), Route carried "under" structure: Ramp Interstate 580, Year Built: 1999, Structure Length: 64.30m (210.96ft), Average Daily Traffic: 4,100 (year 1996), Truck Traffic: 1%, Features Intersected: UP RR,BNSF,AMTRAK,I 580, Facility Carried by Structure: I 80 EB Minimum Vertical Clearance: 5.69m (18.67ft), Kilometerpoint: 4.753, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.7m (140.1ft) Find on map >>
Structure Number: 33C0184, Location: NEAR I-80 (Lat: 37.887778, Lng: -122.307778), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 13.81m (45.31ft), Average Daily Traffic: 10,629 (year 1998), Truck Traffic: 1%, Features Intersected: UP RR, BNSF RY, & AMTRAK, Facility Carried by Structure: BUCHANAN ST Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 20.7m (67.9ft) Find on map >>
Structure Number: 33C0258, Location: 0.3 MI E/O SAN PABLO AVE (Lat: 37.890833, Lng: -122.293333), Route carried "under" structure: City street A372, Year Built: 1968, Structure Length: 2.80m (9.19ft), Average Daily Traffic: 19,700 (year 1997), Truck Traffic: 2%, Features Intersected: SOLANO AVE, Facility Carried by Structure: BARTD (R3002) Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 0.000, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.1m (88.9ft) Find on map >>
Structure Number: 33C0259, Location: 0.3 MI E/O SAN PABLO AVE (Lat: 37.887778, Lng: -122.292500), Route carried "under" structure: City street A387, Year Built: 1968, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 20,604 (year 1999), Truck Traffic: 2%, Features Intersected: MARIN AVE, Facility Carried by Structure: BARTD (R3002) Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft) Discuss this city on our hugely popular California forum Back to: Albany, CA, California, All US cities.
|
![]() |