National Bridge Inventory (NBI) Statistics
Number of bridges: 18
Total length: 17 meters (56ft)
Total costs: $27,000,000
Total average daily traffic: 38,598
Total average daily truck traffic: 2,087
Total future (year 2026) average daily traffic: 57,126
National Bridge Inventory (NBI) Registered Bridges for Albany

New bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 0
  • 1910-1919: 0
  • 1920-1929: 2
  • 1930-1939: 3
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 8
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 1
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 1
  • 2000-2009: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 200300015,  Location: 0.1 MI FROM WATERVILLE (Lat: 43.995444,  Lng: -71.374700),  Route carried "on" structure: State highway 112,  Year Built: 1963,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,000 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,960 (year 2026),  Design Load: HS 25,  Features Intersected: DOWNES BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 2005200026,  Location: 0.6 MI E SANDWICH TL (Lat: 43.909069,  Lng: -71.351781),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 1984),  Average Future Daily Traffic: 148 (year 2026),  Design Load: H 20,  Features Intersected: WONALANCET BROOK,  Facility Carried by Structure: FERNCROFT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2006100147,  Location: 1.7 MI FROM WATERVILLE (Lat: 43.996231,  Lng: -71.351183),  Route carried "on" structure: State highway 112,  Year Built: 1963,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,000 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,960 (year 2026),  Design Load: HS 25,  Features Intersected: OLIVERIAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.881,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 2008000148,  Location: .35 MI NORTH JCT 112 (Lat: 43.996875,  Lng: -71.326044),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 1,200 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,776 (year 2026),  Design Load: H 20,  Features Intersected: SWIFT RIVER,  Facility Carried by Structure: BEAR NOTCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2008400149,  Location: .53 MI N. JCT 112 (Lat: 43.997689,  Lng: -71.322658),  Route carried "on" structure: State highway ,  Year Built: 1964,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,200 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,776 (year 2026),  Design Load: HS 20,  Features Intersected: DOUGLAS BROOK,  Facility Carried by Structure: BEAR NOTCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 2008800188,  Location: 2.4 MI N. JCT 112 (Lat: 44.022950,  Lng: -71.321464),  Route carried "on" structure: State highway ,  Year Built: 1964,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 610 (year 2005),  Average Future Daily Traffic: 903 (year 2026),  Design Load: HS 20,  Features Intersected: DOUGLAS BROOK,  Facility Carried by Structure: BEAR NOTCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.927,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2009700136,  Location: 3.4 MI. EAST OF WATERVILL (Lat: 43.990278,  Lng: -71.298644),  Route carried "on" structure: State highway 112,  Year Built: 1960,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 0.37m (1.21ft),  Average Daily Traffic: 1,900 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,812 (year 2026),  Design Load: H 15,  Features Intersected: TWIN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.663,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.37m (1.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 201080014,  Location: 3.8 MI E WATERVILLE T.L. (Lat: 43.991506,  Lng: -71.291225),  Route carried "on" structure: State highway 112,  Year Built: 2005,  Status: Open,  Structure Length: 0.40m (1.31ft),  Average Daily Traffic: 1,900 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,812 (year 2026),  Design Load: H 15,  Features Intersected: CHAMPNEY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.274,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 2012300146,  Location: 4.8 MI E. WATERVILLE T.L. (Lat: 43.998533,  Lng: -71.277744),  Route carried "on" structure: State highway 112,  Year Built: 1960,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 0.43m (1.41ft),  Average Daily Traffic: 1,900 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,812 (year 2026),  Design Load: H 15,  Features Intersected: STEAM MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.626,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.43m (1.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 2016600158,  Location: 0.1 MI FR KANCAMAGUS HWY (Lat: 44.005711,  Lng: -71.240775),  Route carried "on" structure: Other road ,  Year Built: 1858,  Year Reconstructed: 1970,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 360 (year 2005),  Average Future Daily Traffic: 533 (year 2026),  Features Intersected: SWIFT RIVER,  Facility Carried by Structure: DUGWAY ROAD
Minimum Vertical Clearance: 2.62m (8.60ft),  Kilometerpoint: 13.776,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 2016900151,  Location: 4.9 MI CONWAY TL (Lat: 44.000806,  Lng: -71.235131),  Route carried "on" structure: State highway 112,  Year Built: 1962,  Status: Open,  Structure Length: 0.46m (1.51ft),  Average Daily Traffic: 1,679 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,485 (year 2026),  Design Load: H 15,  Features Intersected: HAM BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.46m (1.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 2017900056,  Location: 0.6 MI N TAMWORTH TL (Lat: 43.931347,  Lng: -71.223378),  Route carried "on" structure: State highway 16,  Year Built: 1939,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,200 (year 2004),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,136 (year 2026),  Design Load: H 15,  Features Intersected: CHOCORUA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2018100149,  Location: 9.5 MI E WATERVILLE TL (Lat: 43.992261,  Lng: -71.184950),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 360 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 533 (year 2026),  Features Intersected: BIG BROOK,  Facility Carried by Structure: DUGWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.241,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Masonry,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2018200053,  Location: 0.1 MI E NH16 (Lat: 43.929589,  Lng: -71.220761),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 270 (year 1992),  Truck Traffic: 4%,  Average Future Daily Traffic: 400 (year 2026),  Design Load: HS 20,  Features Intersected: CHOCORUA RIVER,  Facility Carried by Structure: DRAKE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 201890014,  Location: 3.3 MI FROM CONWAY TL (Lat: 43.993575,  Lng: -71.214864),  Route carried "on" structure: State highway 112,  Year Built: 1990,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,679 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,485 (year 2026),  Design Load: HS 25,  Features Intersected: HOBBS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.849,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 2021000095,  Location: 2.4 MI N TAMWORTH TL (Lat: 43.960161,  Lng: -71.194700),  Route carried "on" structure: State highway 16,  Year Built: 1939,  Status: Open,  Structure Length: 0.37m (1.21ft),  Average Daily Traffic: 8,700 (year 2004),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,876 (year 2026),  Features Intersected: BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.1m (10.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.9 metric tons,  Inventory Rating: 19.1 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.37m (1.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2021300094,  Location: SE NH 16 (Lat: 43.950075,  Lng: -71.203153),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 240 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 355 (year 2026),  Features Intersected: MEADOW BROOK,  Facility Carried by Structure: DRAKE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.571,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2026000099,  Location: .1 MI N. MADISON TL. (Lat: 43.964158,  Lng: -71.144994),  Route carried "on" structure: State highway 113,  Year Built: 1926,  Status: Open,  Structure Length: 0.43m (1.41ft),  Average Daily Traffic: 4,300 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,364 (year 2026),  Design Load: H 15,  Features Intersected: PEQUAWKET BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.43m (1.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New Hampshire forum

Back to: Albany, NH, New Hampshire, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.