U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Alexandria, New Hampshire (NH) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Alexandria, NH, New Hampshire, New Hampshire forum, All US cities.


National Bridge Inventory (NBI) Statistics
Number of bridges: 26
Total length: 28 meters (92ft)
Total costs: $39,000,000
Total average daily traffic: 6,400
Total average daily truck traffic: 408
Total future (year 2026) average daily traffic: 9,469
National Bridge Inventory (NBI) Registered Bridges for Alexandria

New bridges - Historical Statistics

  • 1920-1929: 2
  • 1930-1939: 9
  • 1940-1949: 1
  • 1950-1959: 4
  • 1960-1969: 4
  • 1970-1979: 1
  • 1980-1989: 2
  • 1990-1999: 0
  • 2000-2009: 3

Reconstructed bridges - Historical Statistics

  • 1980-1989: 2
  • 1990-1999: 5
  • 2000-2009: 2

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 3007400112,  Location: 1.06 MI FR KNOWLES HILL (Lat: 43.673439,  Lng: -71.873919),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 0.51m (1.67ft),  Average Daily Traffic: 150 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 222 (year 2026),  Design Load: H 15,  Features Intersected: CLARK BROOK,  Facility Carried by Structure: SHEM VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.918,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.1m (16.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.51m (1.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 3009000135,  Location: 0.8 MI FR RED SCHOOL RD (Lat: 43.654964,  Lng: -71.847100),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 150 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 222 (year 2026),  Features Intersected: FOWLER RIVER,  Facility Carried by Structure: WELTON FALLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3009400108,  Location: 3.8 MI FROM SHIN VALLEY (Lat: 43.637789,  Lng: -71.858725),  Route carried "on" structure: Other road ,  Year Built: 1935,  Status: Open,  Structure Length: 0.52m (1.71ft),  Average Daily Traffic: 50 (year 1984),  Average Future Daily Traffic: 74 (year 2026),  Features Intersected: BROCK BROOK,  Facility Carried by Structure: KNOWLES HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.52m (1.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3009600112,  Location: 0.04 MI KNOWLES HILL RD (Lat: 43.638436,  Lng: -71.854283),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 130 (year 1992),  Truck Traffic: 4%,  Average Future Daily Traffic: 192 (year 2026),  Features Intersected: BROCK BROOK,  Facility Carried by Structure: SHEM VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.196,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3010000116,  Location: 0.3 MI FR SHIN VALLEY RD (Lat: 43.639328,  Lng: -71.848753),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 80 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 118 (year 2026),  Features Intersected: BROCK BROOK,  Facility Carried by Structure: BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.27m (4.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 301010012,  Location: 0.5 MI FR SHEM VALLEY RD (Lat: 43.642408,  Lng: -71.845294),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 80 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 118 (year 2026),  Features Intersected: BROCK BROOK,  Facility Carried by Structure: BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3010200125,  Location: 0.8 MI FR SHIN VALLEY RD (Lat: 43.644375,  Lng: -71.841983),  Route carried "on" structure: Other road ,  Year Built: 2004,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 80 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 118 (year 2026),  Design Load: HS 25,  Features Intersected: BROCK BROOK,  Facility Carried by Structure: BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 3010200135,  Location: 0.1 MI FR NO RIVER RD (Lat: 43.648639,  Lng: -71.837889),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 50 (year 1984),  Average Future Daily Traffic: 74 (year 2026),  Features Intersected: FOWLER RIVER,  Facility Carried by Structure: GOVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3010300138,  Location: 0.25 MI EAST NO RIVER RD (Lat: 43.650156,  Lng: -71.833608),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 0.40m (1.31ft),  Average Daily Traffic: 50 (year 1987),  Average Future Daily Traffic: 74 (year 2026),  Features Intersected: BROOK,  Facility Carried by Structure: GOVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Fair,  Operating Rating: 10.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3010900135,  Location: 5.2MI FR TUFTONBORO TL (Lat: 43.645622,  Lng: -71.832339),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 150 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 222 (year 2026),  Features Intersected: FOWLER RIVER,  Facility Carried by Structure: FOWLER RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.764,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3012200137,  Location: 3.3 MI FROM BRISTOL TL (Lat: 43.641353,  Lng: -71.821992),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 150 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 222 (year 2026),  Features Intersected: BROOK,  Facility Carried by Structure: FOWLER RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.734,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3012600119,  Location: 0.9 MI FROM COLD HILL RD (Lat: 43.631364,  Lng: -71.829317),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 150 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 222 (year 2026),  Features Intersected: TOWN LINE BROOK,  Facility Carried by Structure: MT CARDIGAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.589,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber
Find on map >>

Structure Number: 3012900174,  Location: .05 MI FR BRISTOL TL (Lat: 43.659133,  Lng: -71.792481),  Route carried "on" structure: State highway ,  Year Built: 1929,  Status: Open,  Structure Length: 0.37m (1.21ft),  Average Daily Traffic: 1,100 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,628 (year 2026),  Features Intersected: BROOK,  Facility Carried by Structure: WEST SHORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.37m (1.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 3013600131,  Location: 0.5 MI FROM SHIN VALLEY (Lat: 43.632311,  Lng: -71.813467),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 40 (year 1987),  Average Future Daily Traffic: 59 (year 2026),  Features Intersected: FOWLER RIVER,  Facility Carried by Structure: COLE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 301530014,  Location: 1 MI FROM BRISTOL T.L. (Lat: 43.627942,  Lng: -71.792756),  Route carried "on" structure: State highway ,  Year Built: 1954,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 150 (year 2005),  Average Future Daily Traffic: 222 (year 2026),  Design Load: H 15,  Features Intersected: FOWLER RIVER,  Facility Carried by Structure: FOWLER RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3016000109,  Location: 8.11 MI FROM E HILL RD (Lat: 43.609106,  Lng: -71.810506),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 340 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 503 (year 2026),  Features Intersected: PATTEN BROOK,  Facility Carried by Structure: WASHBURN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3016400118,  Location: 2.3 MI FROM BRISTOL TL (Lat: 43.613947,  Lng: -71.798408),  Route carried "on" structure: State highway ,  Year Built: 1952,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 690 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,021 (year 2026),  Design Load: HS 15,  Features Intersected: PATTEN BROOK,  Facility Carried by Structure: WASHBURN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.808,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>

Structure Number: 3017400116,  Location: .5MI S ALEXANDRIA CTR (Lat: 43.608222,  Lng: -71.793142),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 160 (year 1987),  Truck Traffic: 4%,  Average Future Daily Traffic: 237 (year 2026),  Features Intersected: BOG BROOK,  Facility Carried by Structure: BOG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.860,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 10.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3017400146,  Location: 0.1 MI FROM BRISTOL TL (Lat: 43.624522,  Lng: -71.774778),  Route carried "on" structure: State highway ,  Year Built: 1927,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,200 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,776 (year 2026),  Features Intersected: BOG BROOK,  Facility Carried by Structure: FOWLER RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.962,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3017800141,  Location: 1.5 MI FROM BRISTOL TL (Lat: 43.620456,  Lng: -71.775200),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 330 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 488 (year 2026),  Features Intersected: BOG BROOK,  Facility Carried by Structure: BAILEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 3018300123,  Location: .7 MI FROM BOG RD (Lat: 43.607769,  Lng: -71.780686),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 490 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 725 (year 2026),  Design Load: HS 25,  Features Intersected: BOG BROOK,  Facility Carried by Structure: TOWN POUND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.143,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 87.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.92m (3.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 3020700042,  Location: .7 MI FROM DANBURY T.L. (Lat: 43.550633,  Lng: -71.811350),  Route carried "on" structure: State highway ,  Year Built: 1937,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 40 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 59 (year 2026),  Design Load: H 15,  Features Intersected: SMITH RIVER,  Facility Carried by Structure: SMITH RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2008,  Critical Feature Inspection Date: June 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 3021000064,  Location: 0.04 MI FROM SMITH RD (Lat: 43.561372,  Lng: -71.795558),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.46m (1.51ft),  Average Daily Traffic: 160 (year 1987),  Truck Traffic: 4%,  Average Future Daily Traffic: 237 (year 2026),  Features Intersected: BROOK,  Facility Carried by Structure: BUCKLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.46m (1.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>

Structure Number: 3021400063,  Location: 0.04 MI FR OLD RTE 104 (Lat: 43.560025,  Lng: -71.794575),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 0.43m (1.41ft),  Average Daily Traffic: 150 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 222 (year 2026),  Features Intersected: BROOK,  Facility Carried by Structure: CASS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.43m (1.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 3021600063,  Location: 1.3 MI E HILL T. L. (Lat: 43.558708,  Lng: -71.794406),  Route carried "on" structure: State highway ,  Year Built: 1930,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.36m (1.18ft),  Average Daily Traffic: 40 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 59 (year 2026),  Features Intersected: PINE HILL BROOK,  Facility Carried by Structure: SMITH RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.947,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.36m (1.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 3022200093,  Location: .25 MI EAST NH 104 (Lat: 43.573892,  Lng: -71.770764),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 3.06m (10.04ft),  Average Daily Traffic: 240 (year 2005),  Average Future Daily Traffic: 355 (year 2026),  Design Load: HS 25,  Features Intersected: SMITH RIVER,  Facility Carried by Structure: BERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.0m (98.4ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.06m (10.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing

Discuss this city on our hugely popular New Hampshire forum

Back to: Alexandria, NH, New Hampshire, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.