National Bridge Inventory (NBI) Statistics
Number of bridges: 75
Total length: 544 meters (1,785ft)
Total costs: $146,205,000
Total average daily traffic: 558,214
Total average daily truck traffic: 50,607
National Bridge Inventory (NBI) Registered Bridges for Altus

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 1
  • 1940-1949: 1
  • 1950-1959: 7
  • 1960-1969: 36
  • 1970-1979: 14
  • 1980-1989: 15

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 19355,  Location: 3 MI. E JCT SH 16 (Lat: 35.786667,  Lng: -95.261667),  Route carried "on" structure: US 62,  Year Built: 1977,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 10,900 (year 2006),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,440 (year 2026),  Design Load: HS 20,  Features Intersected: STREET & RR UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.827,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 15 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.56m (54.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $2,125,000,  Roadway Improvement Cost: $3,506,000,  Total Project Cost: $5,949,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 19835,  Location: 1.7 MI N JCT US 62 (Lat: 35.790000,  Lng: -95.330000),  Route carried "on" structure: State highway 16,  Year Built: 1980,  Status: Open,  Structure Length: 28.07m (92.09ft),  Average Daily Traffic: 5,600 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,960 (year 2026),  Design Load: HS 20,  Features Intersected: ARKANSAS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.558,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 28.07m (92.09ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Underwater Inspection Date: October 2006,  Other Special Inspection Date: October 2006,  Bridge Improvement Cost: $6,842,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $11,983,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 19836,  Location: 2.6 MI N OF SH 165 (Lat: 35.746389,  Lng: -95.371389),  Route carried "on" structure: City street 6772,  Year Built: 1980,  Status: Open,  Structure Length: 32.67m (107.19ft),  Average Daily Traffic: 3,500 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,600 (year 2026),  Design Load: HS 20,  Features Intersected: 2ND ST, MAIN ST,RR UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.67m (107.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $5,005,000,  Roadway Improvement Cost: $480,000,  Total Project Cost: $5,632,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 20905,  Location: 0.8 MI N OF US 62 (Lat: 35.765833,  Lng: -95.429444),  Route carried "on" structure: City street 6661,  Year Built: 1989,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 100 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 160 (year 2026),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.34m (10.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 21441,  Location: 2.9 MI E US 64 (Lat: 35.711667,  Lng: -95.411667),  Route carried "on" structure: State highway 165,  Year Built: 1987,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 8,400 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,440 (year 2026),  Design Load: HS 20,  Features Intersected: C.C. CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.811,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 5153HP00,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Out-to-Out Width: 44.5m (146.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2007)
Find on map >>

Structure Number: 21524,  Location: 1.4 MI E US 64 (Lat: 35.711667,  Lng: -95.435000),  Route carried "on" structure: State highway 165,  Year Built: 1987,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 7,600 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 12,160 (year 2026),  Design Load: HS 20,  Features Intersected: COATA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.333,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 5153HP00,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Out-to-Out Width: 45.1m (148.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $553,000,  Roadway Improvement Cost: $913,000,  Total Project Cost: $1,549,000 ( Estimate for 2007)
Find on map >>

Structure Number: 21664,  Location: SH 165 & TURNPIKE (Lat: 35.711667,  Lng: -95.391667),  Route carried "on" structure: State highway 165,  Year Built: 1987,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 4,200 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 6,720 (year 2026),  Design Load: HS 20,  Features Intersected: HANCOCK ST. UNDER
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 6.822,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5153HP00,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.92m (22.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $962,000,  Total Project Cost: $1,633,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 21678,  Location: SH 165 & TURNPIKE (Lat: 35.711667,  Lng: -95.391667),  Route carried "on" structure: State highway 165,  Year Built: 1987,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 4,200 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 6,720 (year 2026),  Design Load: HS 20,  Features Intersected: HANCOCK ST. UNDER
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 6.822,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5153HP00,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.86m (19.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $833,000,  Total Project Cost: $1,414,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 21707,  Location: SH 165 & TURNPIKE (Lat: 35.711667,  Lng: -95.393333),  Route carried "on" structure: State highway 165,  Year Built: 1987,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 4,200 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,720 (year 2026),  Design Load: HS 20,  Features Intersected: S.H. 165 RAMP N-S UNDER
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 6.629,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5163HP00,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.2m (122.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 86.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.55m (37.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $1,495,000,  Total Project Cost: $2,537,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 21713,  Location: 1.6 MI E US 64 (Lat: 35.711667,  Lng: -95.431667),  Route carried "on" structure: State highway 165,  Year Built: 1987,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 3,800 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 6,080 (year 2026),  Design Load: HS 20,  Features Intersected: COODY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5153HP00,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.14m (39.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $945,000,  Roadway Improvement Cost: $1,560,000,  Total Project Cost: $2,647,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 21714,  Location: 1.6 MI E US 64 (Lat: 35.711667,  Lng: -95.431667),  Route carried "on" structure: State highway 165,  Year Built: 1987,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 3,800 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 6,080 (year 2026),  Design Load: HS 20,  Features Intersected: COODY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5153HP00,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.14m (39.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $945,000,  Roadway Improvement Cost: $1,560,000,  Total Project Cost: $2,647,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 23263,  Location: 1.0 MI N OF US 62 (Lat: 35.783333,  Lng: -95.308333),  Route carried "on" structure: Other road 165,  Year Built: 1968,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,250 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,200 (year 2026),  Design Load: HS 20,  Features Intersected: HYDE PARK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2007)
Find on map >>

Structure Number: 23264,  Location: 1.0 MI N OF US 62 (Lat: 35.783333,  Lng: -95.308333),  Route carried "on" structure: Other road 165,  Year Built: 1968,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,250 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,200 (year 2026),  Design Load: HS 20,  Features Intersected: HYDE PARK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2007)
Find on map >>

Structure Number: 12806,  Location: 14.7 MI NE C/L (Lat: 35.735000,  Lng: -95.400000),  Route carried "under" structure: US 69,  Year Built: 1952,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 21,900 (year 2006),  Truck Traffic: 7%,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: PEDESTRIAN PATH
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 23.652,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>

Structure Number: 17265,  Location: AT JCT US 64B (Lat: 35.895000,  Lng: -95.375000),  Route carried "under" structure: US 64,  Year Built: 1968,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 10,100 (year 2006),  Truck Traffic: 7%,  Features Intersected: U.S. 64 UNDER
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 1.947,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>

Structure Number: 17266,  Location: AT JCT US 64B (Lat: 35.895000,  Lng: -95.375000),  Route carried "under" structure: US 64,  Year Built: 1968,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 10,100 (year 2006),  Truck Traffic: 7%,  Features Intersected: U.S. 64 UNDER
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 1.979,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>

Structure Number: 17474,  Location: 2.1 MI S JCT US 62 (Lat: 35.613333,  Lng: -95.305000),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 100 (year 2006),  Truck Traffic: 5%,  Features Intersected: CHANDLER ST. UNDER,  Facility Carried by Structure: S.H. 165
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 1.142,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>

Structure Number: 17475,  Location: 2.1 MI S JCT US 62 (Lat: 35.613333,  Lng: -95.305000),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 100 (year 2006),  Truck Traffic: 5%,  Features Intersected: CHANDLER ST. UNDER,  Facility Carried by Structure: S.H. 165
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 1.142,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>

Structure Number: 17516,  Location: 1.1 MI S JCT US 62 (Lat: 35.626667,  Lng: -95.305000),  Route carried "under" structure: State highway 165,  Year Built: 1969,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 17,700 (year 2006),  Truck Traffic: 8%,  Features Intersected: S.H. 165 UNDER,  Facility Carried by Structure: GIBSON ST.
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 2.767,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>

Structure Number: 17517,  Location: 1.1 MI S JCT US 62 (Lat: 35.626667,  Lng: -95.305000),  Route carried "under" structure: State highway 165,  Year Built: 1969,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 17,700 (year 2006),  Truck Traffic: 8%,  Features Intersected: S.H. 165 UNDER,  Facility Carried by Structure: GIBSON ST.
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 0.028,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>

Structure Number: 17518,  Location: 0.5 MI S JCT US 62 (Lat: 35.635000,  Lng: -95.305000),  Route carried "under" structure: State highway 165,  Year Built: 1969,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 17,700 (year 2006),  Truck Traffic: 8%,  Features Intersected: S.H. 165 UNDER,  Facility Carried by Structure: NORTH ST.
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 3.733,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>

Structure Number: 1754,  Location: 0.4 MI S JCT US 62 (Lat: 35.750000,  Lng: -95.308333),  Route carried "under" structure: State highway 165,  Year Built: 1969,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 17,700 (year 2006),  Truck Traffic: 8%,  Features Intersected: S.H. 165 UNDER,  Facility Carried by Structure: S.L. & S.F. R.R.
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 3.813,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>

Structure Number: 17908,  Location: 1.7 MI E JCT SH 16 (Lat: 35.766667,  Lng: -95.295000),  Route carried "under" structure: State highway 165,  Year Built: 1970,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 17,700 (year 2006),  Truck Traffic: 8%,  Features Intersected: S.H. 165 UNDER,  Facility Carried by Structure: U.S. 62
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 4.473,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>

Structure Number: 17909,  Location: 1.7 MI E JCT SH 16 (Lat: 35.766667,  Lng: -95.295000),  Route carried "under" structure: State highway 165,  Year Built: 1970,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 17,700 (year 2006),  Truck Traffic: 8%,  Features Intersected: S.H. 165 UNDER,  Facility Carried by Structure: U.S. 62
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 4.505,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>

Structure Number: 19354,  Location: 3 MI. E JCT SH 16 (Lat: 35.786667,  Lng: -95.261667),  Route carried "under" structure: City street ,  Year Built: 1977,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 200 (year 2006),  Truck Traffic: 7%,  Features Intersected: STREET & RR UNDER,  Facility Carried by Structure: U.S. 62 WB
Minimum Vertical Clearance: 7.39m (24.25ft),  Kilometerpoint: 4.827,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>

Structure Number: 19355,  Location: 3 MI. E JCT SH 16 (Lat: 35.786667,  Lng: -95.261667),  Route carried "under" structure: City street ,  Year Built: 1977,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 200 (year 2006),  Truck Traffic: 7%,  Features Intersected: STREET & RR UNDER,  Facility Carried by Structure: U.S. 62 EB
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 4.827,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>

Structure Number: 19836,  Location: 2.6 MI N OF SH 165 (Lat: 35.746389,  Lng: -95.371389),  Route carried "under" structure: City street ,  Year Built: 1980,  Structure Length: 32.67m (107.19ft),  Average Daily Traffic: 400 (year 2006),  Truck Traffic: 15%,  Features Intersected: 2ND ST, MAIN ST,RR UNDER,  Facility Carried by Structure: FAU 6772 (COLUMBIS
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>

Structure Number: 21664,  Location: SH 165 & TURNPIKE (Lat: 35.711667,  Lng: -95.391667),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 300 (year 2006),  Truck Traffic: 15%,  Features Intersected: HANCOCK ST. UNDER,  Facility Carried by Structure: S.H. 165
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 6.822,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>

Structure Number: 21678,  Location: SH 165 & TURNPIKE (Lat: 35.711667,  Lng: -95.391667),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 300 (year 2006),  Truck Traffic: 10%,  Features Intersected: HANCOCK ST. UNDER,  Facility Carried by Structure: S.H. 165
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 6.822,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>

Structure Number: 21707,  Location: SH 165 & TURNPIKE (Lat: 35.711667,  Lng: -95.393333),  Route carried "under" structure: Ramp State highway 165,  Year Built: 1987,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 3,250 (year 2006),  Truck Traffic: 15%,  Features Intersected: S.H. 165 RAMP N-S UNDER
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 31.456,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>

Structure Number: 21719,  Location: 0.5 MI E OF US 64 (Lat: 35.713333,  Lng: -95.448333),  Route carried "under" structure: State highway 165,  Year Built: 1987,  Structure Length: 17.65m (57.91ft),  Average Daily Traffic: 11,600 (year 2006),  Truck Traffic: 7%,  Features Intersected: S.H. 165 UNDER,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 0.949,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.7m (140.1ft)


Parts: 1, 2

Discuss this city on our hugely popular Oklahoma forum

Back to: Altus, OK, Oklahoma, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.