National Bridge Inventory (NBI) Statistics
Number of bridges: 15
Total length: 19 meters (62ft)
Total costs: $9,401,000
Total average daily traffic: 17,570
Total average daily truck traffic: 1,477
Total future (year 2015) average daily traffic: 26,355
National Bridge Inventory (NBI) Registered Bridges for Andover

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 7
  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 2
  • 1980-1989: 1
  • 1990-1999: 1

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 3
  • 1970-1979: 1
  • 1980-1989: 0
  • 1990-1999: 1
  • 2000-2009: 2

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 101401000614011,  Location: 0.01 MI TO JCT W C3 TH12 (Lat: 43.326667,  Lng: -72.721944),  Route carried "on" structure: Other road C2002,  Year Built: 1950,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 150 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 225 (year 2019),  Design Load: H 15,  Features Intersected: WILLIAMS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 31.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $781,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $931,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101401002514011,  Location: 0.1 MI TO JCT W CL2 TH1 (Lat: 43.279167,  Lng: -72.696111),  Route carried "on" structure: Other road C3023,  Year Built: 1962,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 150 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 225 (year 2019),  Features Intersected: ANDOVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2007,  Other Special Inspection Date: September 2007,  Bridge Improvement Cost: $106,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $131,000 ( Estimate for 2007)
Find on map >>

Structure Number: 101401002614011,  Location: 0.1 MI TO JCT W VT11 (Lat: 43.258333,  Lng: -72.718333),  Route carried "on" structure: Other road C3025,  Year Built: 1986,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 100 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2019),  Design Load: HS 20,  Features Intersected: LYMAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $443,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $593,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 101401002714011,  Location: 0.08 MI TO JCT W VT11 (Lat: 43.261111,  Lng: -72.690278),  Route carried "on" structure: Other road C3029,  Year Built: 1974,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 10 (year 2004),  Truck Traffic: 2%,  Average Future Daily Traffic: 15 (year 2024),  Design Load: H 20,  Features Intersected: MID. BR WILLIAMS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 22.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $382,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 101401002814011,  Location: 0.08 MI TO JCT W VT11 (Lat: 43.257500,  Lng: -72.706944),  Route carried "on" structure: Other road C3036,  Year Built: 1919,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 20 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 30 (year 2024),  Features Intersected: MID. BR WILLIAMS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 85.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $404,000 ( Estimate for 2007),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Galvanized Reinforcing
Find on map >>

Structure Number: 200016003514012,  Location: 2.0 MI E JCT VT 121 (Lat: 43.243889,  Lng: -72.723333),  Route carried "on" structure: State highway 11,  Year Built: 1929,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,100 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,150 (year 2018),  Design Load: HS 25,  Features Intersected: MID. BR WILLIAMS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.682,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $570,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200016003614012,  Location: 2.2 MI E JCT VT 121 (Lat: 43.245556,  Lng: -72.722500),  Route carried "on" structure: State highway 11,  Year Built: 1929,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,100 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,150 (year 2018),  Design Load: H 15,  Features Intersected: MID. BR WILLIAMS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $572,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200016003714012,  Location: 2.4 MI E JCT VT 121 (Lat: 43.248611,  Lng: -72.721389),  Route carried "on" structure: State highway 11,  Year Built: 1929,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 2,100 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,150 (year 2018),  Design Load: HS 25,  Features Intersected: MID. BR WILLIAMS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.197,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $850,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200016003814012,  Location: 2.8 MI E JCT VT 121 (Lat: 43.253611,  Lng: -72.719167),  Route carried "on" structure: State highway 11,  Year Built: 1929,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,100 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,150 (year 2018),  Design Load: H 15,  Features Intersected: MID. BR WILLIAMS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.808,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $594,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200016003914012,  Location: 3.0 MI E JCT VT 121 (Lat: 43.256111,  Lng: -72.717500),  Route carried "on" structure: State highway 11,  Year Built: 1929,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,100 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,150 (year 2018),  Design Load: HS 25,  Features Intersected: MID. BR WILLIAMS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.066,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $614,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $764,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200016004014012,  Location: 3.1 MI E JCT VT 121 (Lat: 43.257500,  Lng: -72.716389),  Route carried "on" structure: State highway 11,  Year Built: 1929,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,100 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,150 (year 2018),  Design Load: H 15,  Features Intersected: LYMAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.323,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $451,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $601,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200016004114012,  Location: 4.0 MI E JCT VT 121 (Lat: 43.260833,  Lng: -72.701389),  Route carried "on" structure: State highway 11,  Year Built: 1927,  Year Reconstructed: 1963,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,100 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,150 (year 2018),  Design Load: H 15,  Features Intersected: MID. BR WILLIAMS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.675,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $677,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $827,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200132000714012,  Location: 1.9 MI N JCT. VT.11 (Lat: 43.273333,  Lng: -72.689444),  Route carried "on" structure: County highway 1,  Year Built: 1979,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 890 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,335 (year 2015),  Features Intersected: ANDOVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $546,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200132000814012,  Location: 3.0 MI N JCT. VT.11 (Lat: 43.280833,  Lng: -72.707222),  Route carried "on" structure: County highway 1,  Year Built: 1993,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 900 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,350 (year 2015),  Design Load: HS 20,  Features Intersected: ANDOVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $589,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $739,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200132000914012,  Location: 3.8 MI N JCT. VT.11 (Lat: 43.285556,  Lng: -72.723611),  Route carried "on" structure: County highway 1,  Year Built: 1939,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 650 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 975 (year 2015),  Design Load: H 15,  Features Intersected: TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $747,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $897,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular Vermont forum

Back to: Andover, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.