U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Angelica, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Angelica, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 18
Total length: 74 meters (243ft)
Total costs: $37,451,000
Total average daily traffic: 49,818
Total average daily truck traffic: 3,857
National Bridge Inventory (NBI) Registered Bridges for Angelica
No street view available for this location

New bridges - Historical Statistics

  • 1930-1939: 3
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 3
  • 1970-1979: 7
  • 1980-1989: 1
  • 1990-1999: 3

Reconstructed bridges - Historical Statistics

  • 1980-1989: 1
  • 1990-1999: 4
  • 2000-2009: 3

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>   Show street view

Structure Number: 1015,  Location: 0.2 MI N JCT RTS 17 + 19 (Lat: 42.262725,  Lng: -78.064694),  Route carried "on" structure: State highway 19,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,050 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,270 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: BAKER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.267,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 11,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $330,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1061671,  Location: 0.8 MI E JCT RTS 17 + 19 (Lat: 42.270878,  Lng: -78.051650),  Route carried "on" structure: State highway 86,  Year Built: 1973,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 3,058 (year 2000),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,962 (year 2031),  Design Load: HS 20,  Features Intersected: CAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 186.193,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 11,  Bridge Improvement Cost: $820,000,  Roadway Improvement Cost: $480,000,  Total Project Cost: $1,300,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1061672,  Location: 0.8 MI E JCT RTS 17 + 19 (Lat: 42.270131,  Lng: -78.050947),  Route carried "on" structure: State highway 86,  Year Built: 1973,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 2,900 (year 2009),  Truck Traffic: 35%,  Average Future Daily Traffic: 7,080 (year 2031),  Design Load: HS 20,  Features Intersected: CAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.310,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 11,  Bridge Improvement Cost: $820,000,  Roadway Improvement Cost: $480,000,  Total Project Cost: $1,300,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1062201,  Location: JCT RTE 17 + GENESEE R (Lat: 42.264833,  Lng: -78.058731),  Route carried "on" structure: State highway 86,  Year Built: 1973,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 11.55m (37.89ft),  Average Daily Traffic: 3,058 (year 2000),  Truck Traffic: 14%,  Average Future Daily Traffic: 7,080 (year 2031),  Design Load: HS 20,  Features Intersected: GENESEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 185.260,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.55m (37.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 10,  Bridge Improvement Cost: $1,176,000,  Roadway Improvement Cost: $689,000,  Total Project Cost: $1,865,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1062202,  Location: JCT I86 + GENESEE RIVER (Lat: 42.264642,  Lng: -78.058236),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 11.55m (37.89ft),  Average Daily Traffic: 2,900 (year 2009),  Truck Traffic: 35%,  Average Future Daily Traffic: 7,080 (year 2031),  Design Load: HS 20,  Features Intersected: GENESEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.425,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.55m (37.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 10,  Bridge Improvement Cost: $1,438,000,  Roadway Improvement Cost: $842,000,  Total Project Cost: $2,280,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 106223,  Location: JCT CR 2 & I86 - ANGELICA (Lat: 42.299458,  Lng: -77.959289),  Route carried "on" structure: Alternate County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 350 (year 2009),  Truck Traffic: 11%,  Average Future Daily Traffic: 490 (year 2029),  Design Load: HS 20,  Features Intersected: RTE I86,  Facility Carried by Structure: CR 2 KarrVally Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.655,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 10,  Bridge Improvement Cost: $691,000,  Roadway Improvement Cost: $405,000,  Total Project Cost: $1,096,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 221414,  Location: 1.5 MI NW OF ANGELICA (Lat: 42.325258,  Lng: -78.037858),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 180 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 187 (year 2031),  Features Intersected: BAKER CREEK,  Facility Carried by Structure: PEAVY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 11,  Bridge Improvement Cost: $1,341,000,  Roadway Improvement Cost: $785,000,  Total Project Cost: $2,126,000 ( Estimate for 2011),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221415,  Location: 1.8 MI NW OF ANGELICA (Lat: 42.327575,  Lng: -78.035242),  Route carried "on" structure: Other road ,  Year Built: 1974,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 30 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 44 (year 2031),  Features Intersected: TRIB BAKER CREEK,  Facility Carried by Structure: COMBS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 10,  Bridge Improvement Cost: $1,118,000,  Roadway Improvement Cost: $655,000,  Total Project Cost: $1,773,000 ( Estimate for 2011),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221418,  Location: 0.8MI NE OF ANGELICA (Lat: 42.315628,  Lng: -78.001036),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 80 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 88 (year 2031),  Design Load: HS 25,  Features Intersected: COMMONS CREEK,  Facility Carried by Structure: COMMONS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 11,  Bridge Improvement Cost: $3,982,000,  Roadway Improvement Cost: $2,332,000,  Total Project Cost: $6,314,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 304779,  Location: 1.4 MI W OF ANGELICA (Lat: 42.308558,  Lng: -78.042978),  Route carried "on" structure: Alternate County highway ,  Year Built: 1939,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 1,180 (year 2009),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,652 (year 2029),  Design Load: HS 25,  Features Intersected: BAKER CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 10,  Bridge Improvement Cost: $2,558,000,  Roadway Improvement Cost: $1,498,000,  Total Project Cost: $4,056,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 30478,  Location: 1.1 MI W OF ANGELICA (Lat: 42.310417,  Lng: -78.037753),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 1,180 (year 2009),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,652 (year 2029),  Design Load: HS 25,  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.652,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Very good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 10,  Bridge Improvement Cost: $2,756,000,  Roadway Improvement Cost: $1,614,000,  Total Project Cost: $4,370,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 304969,  Location: 2.6 MI NORTH OF ANGELICA (Lat: 42.342881,  Lng: -78.017128),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 660 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 924 (year 2031),  Design Load: HS 25,  Features Intersected: N BR BAKER CREEK,  Facility Carried by Structure: COUNTY ROAD 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.505,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 11,  Bridge Improvement Cost: $1,749,000,  Roadway Improvement Cost: $1,024,000,  Total Project Cost: $2,773,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332997,  Location: 1.5 MI E OF ANGELICA (Lat: 42.301111,  Lng: -77.987911),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 3.16m (10.37ft),  Average Daily Traffic: 350 (year 2009),  Truck Traffic: 11%,  Average Future Daily Traffic: 490 (year 2029),  Design Load: HS 20,  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 10,  Bridge Improvement Cost: $1,070,000,  Roadway Improvement Cost: $627,000,  Total Project Cost: $1,697,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 332998,  Location: 2.3 MI SW OF ANGELICA (Lat: 42.295450,  Lng: -78.057411),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 460 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 495 (year 2031),  Design Load: HS 20,  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: COUNTY ROAD 43
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 3.105,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 10,  Critical Feature Inspection Date: December 10,  Bridge Improvement Cost: $2,022,000,  Roadway Improvement Cost: $1,184,000,  Total Project Cost: $3,206,000 ( Estimate for 2011),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333,  Location: 2.3 MI E OF ANGELICA (Lat: 42.298539,  Lng: -77.977808),  Route carried "on" structure: County highway ,  Year Built: 1963,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 350 (year 2009),  Truck Traffic: 11%,  Average Future Daily Traffic: 490 (year 2029),  Design Load: HS 25,  Features Intersected: TRIB ANGELICA CRK,  Facility Carried by Structure: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 11,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $477,000 ( Estimate for 2011),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33576,  Location: 2.7 MI NW OF BELMONT (Lat: 42.263889,  Lng: -78.052272),  Route carried "on" structure: County highway ,  Year Built: 1959,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 1,320 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,408 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: GENESEE RIVER,  Facility Carried by Structure: COUNTY ROAD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.395,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 10,  Underwater Inspection Date: October 11,  Bridge Improvement Cost: $1,056,000,  Roadway Improvement Cost: $618,000,  Total Project Cost: $1,674,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335761,  Location: 2.3 MI SW OF ANGELICA (Lat: 42.288603,  Lng: -78.052822),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 460 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 495 (year 2031),  Design Load: HS 20,  Features Intersected: TRIB ANGELICA CRK,  Facility Carried by Structure: COUNTY ROAD 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 10,  Bridge Improvement Cost: $744,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $814,000 ( Estimate for 2011),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106223,  Location: JCT CR 2 & I86 - ANGELICA (Lat: 42.299458,  Lng: -77.959289),  Route carried "under" structure: Interstate 86,  Year Built: 1973,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 28,252 (year 1999),  Features Intersected: RTE I86,  Facility Carried by Structure: CR 2 KarrVally Rd
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 196.024,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.3m (151.9ft)

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular New York forum

Back to: Angelica, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2013 Advameg, Inc.