U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Angelica, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Angelica, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 19
Total length: 76 meters (249ft)
Total costs: $28,456,000
Total average daily traffic: 27,450
Total average daily truck traffic: 6,825
National Bridge Inventory (NBI) Registered Bridges for Angelica

New bridges - Historical Statistics

  • 1930-1939: 4
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 3
  • 1970-1979: 7
  • 1980-1989: 1
  • 1990-1999: 3

Reconstructed bridges - Historical Statistics

  • 1960-1969: 3
  • 1970-1979: 0
  • 1980-1989: 1
  • 1990-1999: 4

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 1015,  Location: 0.2 MI N JCT RTS 17 + 19 (Lat: 42.262725,  Lng: -78.064694),  Route carried "on" structure: State highway 19,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,045 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,251 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: BAKER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.222,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $335,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1061671,  Location: 0.8 MI E JCT RTS 17 + 19 (Lat: 42.270878,  Lng: -78.051650),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 3,251 (year 2006),  Truck Traffic: 33%,  Average Future Daily Traffic: 4,492 (year 2026),  Design Load: HS 20,  Features Intersected: CAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.408,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $3,234,000,  Roadway Improvement Cost: $1,876,000,  Total Project Cost: $5,110,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1061672,  Location: 0.8 MI E JCT RTS 17 + 19 (Lat: 42.270131,  Lng: -78.050947),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 3,251 (year 2006),  Truck Traffic: 33%,  Average Future Daily Traffic: 4,492 (year 2026),  Design Load: HS 20,  Features Intersected: CAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.408,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $818,000,  Roadway Improvement Cost: $487,000,  Total Project Cost: $1,305,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 1062201,  Location: JCT RTE 17 + GENESEE R (Lat: 42.264833,  Lng: -78.058731),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 11.55m (37.89ft),  Average Daily Traffic: 3,251 (year 2006),  Truck Traffic: 33%,  Average Future Daily Traffic: 4,492 (year 2026),  Design Load: HS 20,  Features Intersected: GENESEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.364,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.55m (37.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $3,335,000,  Roadway Improvement Cost: $1,935,000,  Total Project Cost: $5,270,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 1062202,  Location: JCT I86 + GENESEE RIVER (Lat: 42.264642,  Lng: -78.058236),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 11.55m (37.89ft),  Average Daily Traffic: 3,251 (year 2006),  Truck Traffic: 33%,  Average Future Daily Traffic: 4,492 (year 2026),  Design Load: HS 20,  Features Intersected: GENESEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.364,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.55m (37.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $3,335,000,  Roadway Improvement Cost: $1,935,000,  Total Project Cost: $5,270,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 106223,  Location: JCT CR 2 & I86 - ANGELICA (Lat: 42.299458,  Lng: -77.959289),  Route carried "on" structure: Alternate County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 332 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 434 (year 2026),  Design Load: HS 20,  Features Intersected: RTE I86,  Facility Carried by Structure: CR 2 KarrVally Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $830,000,  Roadway Improvement Cost: $475,000,  Total Project Cost: $1,305,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 221414,  Location: 1.5 MI NW OF ANGELICA (Lat: 42.325258,  Lng: -78.037858),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 180 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 235 (year 2025),  Features Intersected: BAKER CREEK,  Facility Carried by Structure: PEAVY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $458,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 221415,  Location: 1.8 MI NW OF ANGELICA (Lat: 42.327575,  Lng: -78.035242),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 38 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 50 (year 2025),  Features Intersected: TRIB BAKER CREEK,  Facility Carried by Structure: COMBS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $230,000 ( Estimate for 2007),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 221418,  Location: 0.8MI NE OF ANGELICA (Lat: 42.315628,  Lng: -78.001036),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 146 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 191 (year 2025),  Design Load: HS 25,  Features Intersected: COMMONS CREEK,  Facility Carried by Structure: COMMONS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $230,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 304779,  Location: 1.4 MI W OF ANGELICA (Lat: 42.308558,  Lng: -78.042978),  Route carried "on" structure: Alternate County highway ,  Year Built: 1939,  Year Reconstructed: 1974,  Status: Closed,  Structure Length: 2.46m (8.07ft),  Average Daily Traffic: 865 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,169 (year 2026),  Features Intersected: BAKER CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $481,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $767,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 30478,  Location: 1.1 MI W OF ANGELICA (Lat: 42.310417,  Lng: -78.037753),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 1974,  Status: Closed,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 865 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,169 (year 2026),  Design Load: H 20,  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Critical Feature Inspection Date: August 2007,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $344,000,  Total Project Cost: $922,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 304968,  Location: 1.5 MI W OF ANGELICA (Lat: 42.310125,  Lng: -78.043733),  Route carried "on" structure: County highway ,  Year Built: 1933,  Year Reconstructed: 1974,  Status: Posted for load,  Structure Length: 2.28m (7.48ft),  Average Daily Traffic: 543 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 734 (year 2026),  Features Intersected: BAKER CREEK,  Facility Carried by Structure: COUNTY ROAD 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2007,  Critical Feature Inspection Date: December 2007,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $810,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 304969,  Location: 2.6 MI NORTH OF ANGELICA (Lat: 42.342881,  Lng: -78.017128),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 683 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 923 (year 2026),  Design Load: HS 25,  Features Intersected: N BR BAKER CREEK,  Facility Carried by Structure: COUNTY ROAD 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $810,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 332997,  Location: 1.5 MI E OF ANGELICA (Lat: 42.301111,  Lng: -77.987911),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 3.16m (10.37ft),  Average Daily Traffic: 332 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 434 (year 2026),  Design Load: HS 20,  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $693,000,  Roadway Improvement Cost: $412,000,  Total Project Cost: $1,105,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 332998,  Location: 2.3 MI SW OF ANGELICA (Lat: 42.295450,  Lng: -78.057411),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 412 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 539 (year 2026),  Design Load: HS 20,  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: COUNTY ROAD 43
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Critical Feature Inspection Date: November 2006,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $727,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333,  Location: 2.3 MI E OF ANGELICA (Lat: 42.298539,  Lng: -77.977808),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 332 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 434 (year 2026),  Features Intersected: TRIB ANGELICA CRK,  Facility Carried by Structure: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $244,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33576,  Location: 2.7 MI NW OF BELMONT (Lat: 42.263889,  Lng: -78.052272),  Route carried "on" structure: County highway ,  Year Built: 1959,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 711 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 930 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: GENESEE RIVER,  Facility Carried by Structure: COUNTY ROAD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2007,  Underwater Inspection Date: October 2006,  Bridge Improvement Cost: $1,792,000,  Roadway Improvement Cost: $1,066,000,  Total Project Cost: $2,858,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 335761,  Location: 2.3 MI SW OF ANGELICA (Lat: 42.288603,  Lng: -78.052822),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 412 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 539 (year 2026),  Design Load: HS 20,  Features Intersected: TRIB ANGELICA CRK,  Facility Carried by Structure: COUNTY ROAD 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $700,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 106223,  Location: JCT CR 2 & I86 - ANGELICA (Lat: 42.299458,  Lng: -77.959289),  Route carried "under" structure: Interstate 86,  Year Built: 1973,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 5,550 (year 2007),  Truck Traffic: 33%,  Features Intersected: RTE I86,  Facility Carried by Structure: CR 2 KarrVally Rd
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 35.189,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.3m (151.9ft)

Discuss this city on our hugely popular New York forum

Back to: Angelica, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.