Bridge Statistics for Angelica, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Angelica, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 19 Total length: 76 meters (249ft) Total costs: $28,456,000 Total average daily traffic: 27,450 Total average daily truck traffic: 6,825 National Bridge Inventory (NBI) Registered Bridges for Angelica
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 1015, Location: 0.2 MI N JCT RTS 17 + 19 (Lat: 42.262725, Lng: -78.064694), Route carried "on" structure: State highway 19, Year Built: 1960, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 3,045 (year 2007), Truck Traffic: 9%, Average Future Daily Traffic: 4,251 (year 2027), Design Load: HS 20+Mod, Features Intersected: BAKER CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 40.222, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.6m (11.8ft) Condition: Channel: Poor, Culverts: Good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 89.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $210,000, Roadway Improvement Cost: $125,000, Total Project Cost: $335,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1061671, Location: 0.8 MI E JCT RTS 17 + 19 (Lat: 42.270878, Lng: -78.051650), Route carried "on" structure: Interstate 86, Year Built: 1973, Year Reconstructed: 2003, Status: Open, Structure Length: 2.83m (9.28ft), Average Daily Traffic: 3,251 (year 2006), Truck Traffic: 33%, Average Future Daily Traffic: 4,492 (year 2026), Design Load: HS 20, Features Intersected: CAMP ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 25.408, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.4m (89.9ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.83m (9.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $3,234,000, Roadway Improvement Cost: $1,876,000, Total Project Cost: $5,110,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1061672, Location: 0.8 MI E JCT RTS 17 + 19 (Lat: 42.270131, Lng: -78.050947), Route carried "on" structure: Interstate 86, Year Built: 1973, Year Reconstructed: 2003, Status: Open, Structure Length: 2.83m (9.28ft), Average Daily Traffic: 3,251 (year 2006), Truck Traffic: 33%, Average Future Daily Traffic: 4,492 (year 2026), Design Load: HS 20, Features Intersected: CAMP ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 25.408, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.4m (89.9ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.83m (9.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $818,000, Roadway Improvement Cost: $487,000, Total Project Cost: $1,305,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1062201, Location: JCT RTE 17 + GENESEE R (Lat: 42.264833, Lng: -78.058731), Route carried "on" structure: Interstate 86, Year Built: 1973, Year Reconstructed: 1997, Status: Open, Structure Length: 11.55m (37.89ft), Average Daily Traffic: 3,251 (year 2006), Truck Traffic: 33%, Average Future Daily Traffic: 4,492 (year 2026), Design Load: HS 20, Features Intersected: GENESEE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 25.364, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 38.1m (125.0ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 78.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.55m (37.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $3,335,000, Roadway Improvement Cost: $1,935,000, Total Project Cost: $5,270,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1062202, Location: JCT I86 + GENESEE RIVER (Lat: 42.264642, Lng: -78.058236), Route carried "on" structure: Interstate 86, Year Built: 1973, Year Reconstructed: 1997, Status: Open, Structure Length: 11.55m (37.89ft), Average Daily Traffic: 3,251 (year 2006), Truck Traffic: 33%, Average Future Daily Traffic: 4,492 (year 2026), Design Load: HS 20, Features Intersected: GENESEE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 25.364, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 38.1m (125.0ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 78.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.55m (37.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $3,335,000, Roadway Improvement Cost: $1,935,000, Total Project Cost: $5,270,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 106223, Location: JCT CR 2 & I86 - ANGELICA (Lat: 42.299458, Lng: -77.959289), Route carried "on" structure: Alternate County highway , Year Built: 1973, Status: Open, Structure Length: 8.90m (29.20ft), Average Daily Traffic: 332 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 434 (year 2026), Design Load: HS 20, Features Intersected: RTE I86, Facility Carried by Structure: CR 2 KarrVally Rd Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 46.3m (151.9ft), Curb-To-Curb Width: 10.0m (32.8ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Inventory Rating: 65.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.90m (29.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $830,000, Roadway Improvement Cost: $475,000, Total Project Cost: $1,305,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 221414, Location: 1.5 MI NW OF ANGELICA (Lat: 42.325258, Lng: -78.037858), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 1.82m (5.97ft), Average Daily Traffic: 180 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 235 (year 2025), Features Intersected: BAKER CREEK, Facility Carried by Structure: PEAVY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.6m (57.7ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 7.2m (23.6ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Poor, Channel: Satisfactory, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.82m (5.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $287,000, Roadway Improvement Cost: $171,000, Total Project Cost: $458,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 221415, Location: 1.8 MI NW OF ANGELICA (Lat: 42.327575, Lng: -78.035242), Route carried "on" structure: City street , Year Built: 1974, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 38 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 50 (year 2025), Features Intersected: TRIB BAKER CREEK, Facility Carried by Structure: COMBS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 7.3m (24.0ft) Condition: Deck: Serious, Superstructure: Fair, Substructure: Satisfactory, Channel: Fair, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $144,000, Roadway Improvement Cost: $86,000, Total Project Cost: $230,000 ( Estimate for 2007), Deck Structure Type: Corrugated Steel, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 221418, Location: 0.8MI NE OF ANGELICA (Lat: 42.315628, Lng: -78.001036), Route carried "on" structure: City street , Year Built: 1999, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 146 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 191 (year 2025), Design Load: HS 25, Features Intersected: COMMONS CREEK, Facility Carried by Structure: COMMONS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Skew: 2 degrees, Material/Design: Wood or Timber, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.2m (26.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Fair, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 75.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $144,000, Roadway Improvement Cost: $86,000, Total Project Cost: $230,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 304779, Location: 1.4 MI W OF ANGELICA (Lat: 42.308558, Lng: -78.042978), Route carried "on" structure: Alternate County highway , Year Built: 1939, Year Reconstructed: 1974, Status: Closed, Structure Length: 2.46m (8.07ft), Average Daily Traffic: 865 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 1,169 (year 2026), Features Intersected: BAKER CREEK, Facility Carried by Structure: COUNTY ROAD 16 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.7m (77.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 9.0m (29.5ft) Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below), Length Of Structure Improvement: 2.46m (8.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $481,000, Roadway Improvement Cost: $286,000, Total Project Cost: $767,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 30478, Location: 1.1 MI W OF ANGELICA (Lat: 42.310417, Lng: -78.037753), Route carried "on" structure: County highway , Year Built: 1939, Year Reconstructed: 1974, Status: Closed, Structure Length: 3.20m (10.50ft), Average Daily Traffic: 865 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 1,169 (year 2026), Design Load: H 20, Features Intersected: ANGELICA CREEK, Facility Carried by Structure: COUNTY ROAD 16 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.4m (99.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.3m (27.2ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Poor, Channel: Satisfactory, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below), Length Of Structure Improvement: 3.20m (10.50ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2007, Critical Feature Inspection Date: August 2007, Bridge Improvement Cost: $578,000, Roadway Improvement Cost: $344,000, Total Project Cost: $922,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 304968, Location: 1.5 MI W OF ANGELICA (Lat: 42.310125, Lng: -78.043733), Route carried "on" structure: County highway , Year Built: 1933, Year Reconstructed: 1974, Status: Posted for load, Structure Length: 2.28m (7.48ft), Average Daily Traffic: 543 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 734 (year 2026), Features Intersected: BAKER CREEK, Facility Carried by Structure: COUNTY ROAD 15 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.4m (27.6ft) Condition: Deck: Poor, Superstructure: Serious, Substructure: Poor, Channel: Satisfactory, Operating Rating: 31.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 18.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: December 2007, Critical Feature Inspection Date: December 2007, Bridge Improvement Cost: $507,000, Roadway Improvement Cost: $303,000, Total Project Cost: $810,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 304969, Location: 2.6 MI NORTH OF ANGELICA (Lat: 42.342881, Lng: -78.017128), Route carried "on" structure: County highway , Year Built: 1998, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 683 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 923 (year 2026), Design Load: HS 25, Features Intersected: N BR BAKER CREEK, Facility Carried by Structure: COUNTY ROAD 15 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Wood or Timber, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $507,000, Roadway Improvement Cost: $303,000, Total Project Cost: $810,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 332997, Location: 1.5 MI E OF ANGELICA (Lat: 42.301111, Lng: -77.987911), Route carried "on" structure: County highway , Year Built: 1991, Status: Open, Structure Length: 3.16m (10.37ft), Average Daily Traffic: 332 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 434 (year 2026), Design Load: HS 20, Features Intersected: ANGELICA CREEK, Facility Carried by Structure: COUNTY ROAD 2 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.0m (101.7ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 75.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.16m (10.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $693,000, Roadway Improvement Cost: $412,000, Total Project Cost: $1,105,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 332998, Location: 2.3 MI SW OF ANGELICA (Lat: 42.295450, Lng: -78.057411), Route carried "on" structure: County highway , Year Built: 1930, Status: Open, Structure Length: 3.84m (12.60ft), Average Daily Traffic: 412 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 539 (year 2026), Design Load: HS 20, Features Intersected: ANGELICA CREEK, Facility Carried by Structure: COUNTY ROAD 43 Minimum Vertical Clearance: 4.26m (13.98ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 5.1m (16.7ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 36.5m (119.8ft), Curb-To-Curb Width: 5.1m (16.7ft), Out-to-Out Width: 5.5m (18.0ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.84m (12.60ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: November 2006, Critical Feature Inspection Date: November 2006, Bridge Improvement Cost: $456,000, Roadway Improvement Cost: $271,000, Total Project Cost: $727,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 333, Location: 2.3 MI E OF ANGELICA (Lat: 42.298539, Lng: -77.977808), Route carried "on" structure: County highway , Year Built: 1963, Status: Open, Structure Length: 0.94m (3.08ft), Average Daily Traffic: 332 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 434 (year 2026), Features Intersected: TRIB ANGELICA CRK, Facility Carried by Structure: COUNTY ROAD 2 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.2m (26.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.5m (24.6ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 33.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 0.94m (3.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $153,000, Roadway Improvement Cost: $91,000, Total Project Cost: $244,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 33576, Location: 2.7 MI NW OF BELMONT (Lat: 42.263889, Lng: -78.052272), Route carried "on" structure: County highway , Year Built: 1959, Year Reconstructed: 1988, Status: Open, Structure Length: 8.53m (27.99ft), Average Daily Traffic: 711 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 930 (year 2026), Design Load: HS 20+Mod, Features Intersected: GENESEE RIVER, Facility Carried by Structure: COUNTY ROAD 20 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 28.0m (91.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 97.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 8.53m (27.99ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: July 2007, Underwater Inspection Date: October 2006, Bridge Improvement Cost: $1,792,000, Roadway Improvement Cost: $1,066,000, Total Project Cost: $2,858,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 335761, Location: 2.3 MI SW OF ANGELICA (Lat: 42.288603, Lng: -78.052822), Route carried "on" structure: County highway , Year Built: 1982, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 412 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 539 (year 2026), Design Load: HS 20, Features Intersected: TRIB ANGELICA CRK, Facility Carried by Structure: COUNTY ROAD 43 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Wood or Timber, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.0m (19.7ft), Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Poor, Operating Rating: 46.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.70m (2.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $419,000, Roadway Improvement Cost: $281,000, Total Project Cost: $700,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 106223, Location: JCT CR 2 & I86 - ANGELICA (Lat: 42.299458, Lng: -77.959289), Route carried "under" structure: Interstate 86, Year Built: 1973, Structure Length: 8.90m (29.20ft), Average Daily Traffic: 5,550 (year 2007), Truck Traffic: 33%, Features Intersected: RTE I86, Facility Carried by Structure: CR 2 KarrVally Rd Minimum Vertical Clearance: 6.05m (19.85ft), Kilometerpoint: 35.189, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.3m (151.9ft) Discuss this city on our hugely popular New York forum Back to: Angelica, NY, New York, All US cities.
|
![]() |