![]() |
Bridge Statistics for Anniston, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Anniston, AL, Alabama, Alabama forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 59 Total length: 150 meters (492ft) Total costs: $59,121,000 Total average daily traffic: 401,216 Total average daily truck traffic: 31,946 National Bridge Inventory (NBI) Registered Bridges for Anniston
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 73, Location: ANNISTON (Lat: 33.666667, Lng: -85.750000), Route carried "on" structure: City street , Year Built: 1913, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 1,200 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 1,600 (year 2027), Design Load: H 15, Features Intersected: DRAINAGE DITCH, Facility Carried by Structure: WEST 11TH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.800, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 0.0m, Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.34m (4.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $158,000, Roadway Improvement Cost: $16,000, Total Project Cost: $237,000 ( Estimate for 2008), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 74, Location: ANNISTON (Lat: 33.700000, Lng: -85.766667), Route carried "on" structure: City street , Year Built: 1913, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 580 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 950 (year 2027), Design Load: H 15, Features Intersected: DRAINAGE DITCH, Facility Carried by Structure: EAST 17TH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.100, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 18.8m (61.7ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 73.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.34m (4.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $392,000, Roadway Improvement Cost: $39,000, Total Project Cost: $588,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1182, Location: 1.9 S WEAVER (Lat: 33.733333, Lng: -85.816667), Route carried "on" structure: City street , Year Built: 1935, Status: Open, Structure Length: 0.72m (2.36ft), Average Daily Traffic: 3,600 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 4,500 (year 2027), Features Intersected: CANE CREEK, Facility Carried by Structure: WEAVER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.899, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.3m (30.5ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 2.3m (7.5ft), Curb-To-Curb Width: 9.3m (30.5ft), Out-to-Out Width: 9.9m (32.5ft) Condition: Channel: Fair, Culverts: Fair, Operating Rating: 14.5 metric tons, Inventory Rating: 10.9 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 1.36m (4.46ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $149,000, Roadway Improvement Cost: $15,000, Total Project Cost: $224,000 ( Estimate for 2008) Find on map >>
Structure Number: 1409, Location: ANNISTON (Lat: 33.650000, Lng: -85.833333), Route carried "on" structure: City street , Year Built: 1936, Status: Open, Structure Length: 0.68m (2.23ft), Average Daily Traffic: 570 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 750 (year 2027), Design Load: H 15, Features Intersected: DRAINAGE DITCH, Facility Carried by Structure: 7TH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.100, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.8m (22.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $156,000, Roadway Improvement Cost: $16,000, Total Project Cost: $234,000 ( Estimate for 2008) Find on map >>
Structure Number: 1421, Location: ANNISTON (Lat: 33.650000, Lng: -85.833333), Route carried "on" structure: City street , Year Built: 1936, Status: Open, Structure Length: 14.23m (46.69ft), Average Daily Traffic: 3,100 (year 2007), Truck Traffic: 2%, Average Future Daily Traffic: 4,600 (year 2027), Design Load: H 15, Features Intersected: SOU. RR ; CREEK, Facility Carried by Structure: 10TH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.199, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 12, Length of Maximum Span: 19.5m (64.0ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.5m (31.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 50.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 15.02m (49.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $1,860,000, Roadway Improvement Cost: $186,000, Total Project Cost: $2,790,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1429, Location: ANNISTON (Lat: 33.683333, Lng: -85.716667), Route carried "on" structure: City street , Year Built: 1936, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 625 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 900 (year 2027), Design Load: H 15, Features Intersected: DRAINAGE DITCH, Facility Carried by Structure: CITY STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.599, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.43m (4.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $144,000, Roadway Improvement Cost: $14,000, Total Project Cost: $216,000 ( Estimate for 2008), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1564, Location: 1.3 MI NW US 431 (Lat: 33.683333, Lng: -85.833333), Route carried "on" structure: City street , Year Built: 1937, Status: Open, Structure Length: 3.72m (12.20ft), Average Daily Traffic: 3,600 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 4,000 (year 2027), Features Intersected: ABANDONED RAILROAD, Facility Carried by Structure: CO. 53 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.299, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 9.4m (30.8ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.7m (22.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 52.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 4.65m (15.26ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $406,000, Roadway Improvement Cost: $41,000, Total Project Cost: $609,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 3154, Location: 4.4 MI N JCT US 431 (Lat: 33.733333, Lng: -85.783333), Route carried "on" structure: State highway 21, Year Built: 1926, Year Reconstructed: 1948, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 20,030 (year 2007), Truck Traffic: 3%, Average Future Daily Traffic: 20,090 (year 2027), Design Load: H 15, Features Intersected: COVE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 420.153, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 13 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Good, Culverts: Fair, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.67m (5.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $769,000, Roadway Improvement Cost: $77,000, Total Project Cost: $1,154,000 ( Estimate for 2008) Find on map >>
Structure Number: 3227, Location: 2.5 MI N JCT US 431 (Lat: 33.716667, Lng: -85.800000), Route carried "on" structure: State highway 21, Year Built: 1948, Status: Open, Structure Length: 4.94m (16.21ft), Average Daily Traffic: 11,400 (year 2007), Truck Traffic: 3%, Average Future Daily Traffic: 11,457 (year 2027), Design Load: H 20, Features Intersected: CANE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 417.968, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 16 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 4.6m (15.1ft) Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 30.8 metric tons, Inventory Rating: 22.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.95m (19.52ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $1,624,000, Roadway Improvement Cost: $162,000, Total Project Cost: $2,436,000 ( Estimate for 2008) Find on map >>
Structure Number: 3228, Location: 5.4 MI N JCT US 431 (Lat: 33.750000, Lng: -85.783333), Route carried "on" structure: State highway 21, Year Built: 1948, Status: Open, Structure Length: 2.04m (6.69ft), Average Daily Traffic: 20,750 (year 2007), Truck Traffic: 3%, Average Future Daily Traffic: 20,916 (year 2027), Design Load: H 15, Features Intersected: DOTHARD CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 421.841, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.1m (36.4ft), Skew: 12 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.79m (9.15ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $522,000, Roadway Improvement Cost: $52,000, Total Project Cost: $783,000 ( Estimate for 2008) Find on map >>
Structure Number: 4277, Location: 2.3 MI WEST JCT SR 21 (Lat: 33.583333, Lng: -85.850000), Route carried "on" structure: Bypass US 78, Year Built: 1952, Status: Open, Structure Length: 1.49m (4.89ft), Average Daily Traffic: 17,390 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 17,737 (year 2027), Design Load: H 15, Features Intersected: SNOW CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 254.196, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.17m (7.12ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $420,000, Roadway Improvement Cost: $42,000, Total Project Cost: $630,000 ( Estimate for 2008) Find on map >>
Structure Number: 5101, Location: ANNISTON (Lat: 33.650000, Lng: -85.750000), Route carried "on" structure: City street , Year Built: 1955, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 875 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 1,200 (year 2027), Design Load: H 15, Features Intersected: DRAINAGE DITCH, Facility Carried by Structure: WEST 4TH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.499, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.0m (13.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 12.2m (40.0ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 52.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $287,000, Roadway Improvement Cost: $29,000, Total Project Cost: $431,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5447, Location: ANNISTON (Lat: 33.650000, Lng: -85.733333), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 0.96m (3.15ft), Average Daily Traffic: 725 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 1,000 (year 2027), Design Load: H 15, Features Intersected: DRAINAGE DITCH, Facility Carried by Structure: GLEN ADDIE AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.299, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.3m (14.1ft), Curb or Sidewalk Widths: Left: 4.3m (14.1ft), Right: 4.3m (14.1ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 17.6m (57.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Fair, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.62m (5.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $371,000, Roadway Improvement Cost: $37,000, Total Project Cost: $556,000 ( Estimate for 2008) Find on map >>
Structure Number: 6525, Location: CITY OF ANNISTON (Lat: 33.633333, Lng: -85.816667), Route carried "on" structure: US 431, Year Built: 1959, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 39,730 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 39,769 (year 2027), Design Load: HS 20, Features Intersected: BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 370.584, Lanes on structure: 8, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.8m (78.1ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Good, Culverts: Fair, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $650,000, Roadway Improvement Cost: $65,000, Total Project Cost: $975,000 ( Estimate for 2008) Find on map >>
Structure Number: 6896, Location: 0.5 MI W OLD US 431 (Lat: 33.716667, Lng: -85.866667), Route carried "on" structure: US 431, Year Built: 1960, Status: Open, Structure Length: 1.68m (5.51ft), Average Daily Traffic: 22,510 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 22,937 (year 2027), Design Load: H 15, Features Intersected: BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 383.616, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 31.1m (102.0ft), Skew: 10 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.36m (7.74ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $1,034,000, Roadway Improvement Cost: $103,000, Total Project Cost: $1,551,000 ( Estimate for 2008) Find on map >>
Structure Number: 7608, Location: 0.2 MI W JCT SR 21 (Lat: 33.683333, Lng: -85.816667), Route carried "on" structure: County highway , Year Built: 1962, Status: Posted for load, Structure Length: 7.62m (25.00ft), Average Daily Traffic: 7,300 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 7,648 (year 2026), Design Load: HS 20, Features Intersected: US 431, Facility Carried by Structure: SUMMERALL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 15.2m (49.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Poor, Operating Rating: 11.8 metric tons, Inventory Rating: 9.0 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 8.64m (28.35ft), Designated Inspection Frequency: Every 6 months, Other Special Inspection Frequency: Every 6 months, Inspection Date: March 2008, Other Special Inspection Date: March 2008, Bridge Improvement Cost: $1,056,000, Roadway Improvement Cost: $106,000, Total Project Cost: $1,584,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 7609, Location: JCT US 431 & SR 21 (Lat: 33.683333, Lng: -85.816667), Route carried "on" structure: US 431, Year Built: 1962, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 9,790 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 9,790 (year 2027), Design Load: HS 20, Features Intersected: SNOW CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 376.754, Lanes on structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Skew: 24 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Fair, Culverts: Fair, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $1,085,000, Roadway Improvement Cost: $109,000, Total Project Cost: $1,628,000 ( Estimate for 2008) Find on map >>
Structure Number: 7683, Location: 2.5 MI N JCT SR 21 (Lat: 33.716667, Lng: -85.800000), Route carried "on" structure: State highway 21, Year Built: 1962, Status: Open, Structure Length: 4.94m (16.21ft), Average Daily Traffic: 11,400 (year 2007), Truck Traffic: 3%, Average Future Daily Traffic: 11,457 (year 2027), Design Load: H 20, Features Intersected: CANE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 417.968, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 16 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 4.6m (15.1ft) Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 30.8 metric tons, Inventory Rating: 22.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.95m (19.52ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $1,928,000, Roadway Improvement Cost: $193,000, Total Project Cost: $2,892,000 ( Estimate for 2008) Find on map >>
Structure Number: 8645, Location: ANNISTON (Lat: 33.683333, Lng: -85.716667), Route carried "on" structure: City street , Year Built: 1965, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 625 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 1,000 (year 2027), Design Load: H 15, Features Intersected: DRAINAGE DITCH, Facility Carried by Structure: W-13TH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.200, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $183,000, Roadway Improvement Cost: $18,000, Total Project Cost: $274,000 ( Estimate for 2008), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 8655, Location: 2 MI E OF AL 21 (Lat: 33.616667, Lng: -85.800000), Route carried "on" structure: City street , Year Built: 1965, Status: Open, Structure Length: 0.62m (2.03ft), Average Daily Traffic: 4,500 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 5,500 (year 2027), Design Load: H 15, Features Intersected: BRANCH, Facility Carried by Structure: GREENBRIAR DR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.999, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.8m (9.2ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.23m (4.04ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $390,000, Roadway Improvement Cost: $39,000, Total Project Cost: $585,000 ( Estimate for 2008) Find on map >>
Structure Number: 8689, Location: ANNISTON (Lat: 33.666667, Lng: -85.750000), Route carried "on" structure: City street , Year Built: 1965, Status: Open, Structure Length: 1.11m (3.64ft), Average Daily Traffic: 1,100 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 1,700 (year 2027), Design Load: H 15, Features Intersected: DRAINAGE DITCH, Facility Carried by Structure: CITY STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.499, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 5.3m (17.4ft), Curb-To-Curb Width: 13.3m (43.6ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 41.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.77m (5.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $370,000, Roadway Improvement Cost: $37,000, Total Project Cost: $555,000 ( Estimate for 2008) Find on map >>
Structure Number: 87, Location: ANNISTON (Lat: 33.666667, Lng: -85.750000), Route carried "on" structure: City street , Year Built: 1965, Status: Open, Structure Length: 0.78m (2.56ft), Average Daily Traffic: 700 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 950 (year 2027), Design Load: H 15, Features Intersected: CREEK, Facility Carried by Structure: W 12TH ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.499, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.3m (27.2ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.6m (15.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.8m (9.2ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 12.4m (40.7ft) Condition: Channel: Fair, Culverts: Fair, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.43m (4.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $226,000, Roadway Improvement Cost: $23,000, Total Project Cost: $339,000 ( Estimate for 2008), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 9862, Location: 3 MI E JCT SR 21 (Lat: 33.600000, Lng: -85.766667), Route carried "on" structure: Interstate 20, Year Built: 1969, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 19,100 (year 2007), Truck Traffic: 39%, Average Future Daily Traffic: 19,864 (year 2027), Design Load: HS 20, Features Intersected: BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 303.516, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 13 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $627,000, Roadway Improvement Cost: $63,000, Total Project Cost: $941,000 ( Estimate for 2008) Find on map >>
Structure Number: 9953, Location: CITY OF ANNISTON (Lat: 33.650000, Lng: -85.816667), Route carried "on" structure: US 431, Year Built: 1969, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 38,530 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 38,568 (year 2027), Design Load: H 15, Features Intersected: SNOW CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 372.721, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 30.5m (100.1ft), Skew: 24 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $556,000, Roadway Improvement Cost: $56,000, Total Project Cost: $834,000 ( Estimate for 2008) Find on map >>
Structure Number: 12947, Location: ANNISTON (Lat: 33.633333, Lng: -85.750000), Route carried "on" structure: City street , Year Built: 1983, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 1,200 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 1,200 (year 2027), Design Load: HS 20, Features Intersected: CREEK, Facility Carried by Structure: "F" STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.100, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.0m (29.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 74.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.03m (6.66ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $237,000, Roadway Improvement Cost: $24,000, Total Project Cost: $356,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 1311, Location: WEAVER ROAD (Lat: 33.750000, Lng: -85.666667), Route carried "on" structure: City street , Year Built: 1984, Status: Open, Structure Length: 2.59m (8.50ft), Average Daily Traffic: 7,150 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 10,000 (year 2027), Design Load: HS 20+Mod, Features Intersected: CANE CREEK, Facility Carried by Structure: CITY STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.099, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.3m (14.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.49m (11.45ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $572,000, Roadway Improvement Cost: $57,000, Total Project Cost: $858,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 13397, Location: 8.47 MI E US 78 (Lat: 33.650000, Lng: -85.833333), Route carried "on" structure: State highway 202, Year Built: 1984, Status: Open, Structure Length: 1.77m (5.81ft), Average Daily Traffic: 12,700 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 12,788 (year 2027), Design Load: HS 20+Mod, Features Intersected: STREAM Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 13.631, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 29.3m (96.1ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 40.8 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.47m (8.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $2,411,000, Roadway Improvement Cost: $241,000, Total Project Cost: $3,616,000 ( Estimate for 2008) Find on map >>
Structure Number: 13398, Location: 10.1 MI E US 78 (Lat: 33.650000, Lng: -85.833333), Route carried "on" structure: State highway 202, Year Built: 1984, Status: Open, Structure Length: 13.84m (45.41ft), Average Daily Traffic: 12,700 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 12,788 (year 2027), Design Load: HS 20+Mod, Features Intersected: SOU RR & GLEN ADDIE AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 13.712, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 25.6m (84.0ft), Skew: 23 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 41.8m (137.1ft), Curb-To-Curb Width: 24.4m (80.1ft), Out-to-Out Width: 26.5m (86.9ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Operating Rating: 69.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.64m (48.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2008, Bridge Improvement Cost: $5,050,000, Roadway Improvement Cost: $505,000, Total Project Cost: $7,575,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 13399, Location: 10.3 MI E US 78 (Lat: 33.650000, Lng: -85.816667), Route carried "on" structure: State highway 202, Year Built: 1984, Status: Open, Structure Length: 9.91m (32.51ft), Average Daily Traffic: 12,700 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 12,788 (year 2027), Design Load: HS 20+Mod, Features Intersected: ABANDONED R/R Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 14.017, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 25.6m (84.0ft), Skew: 21 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 29.0m (95.1ft), Curb-To-Curb Width: 24.4m (80.1ft), Out-to-Out Width: 26.5m (86.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 44.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.83m (35.53ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2008, Bridge Improvement Cost: $3,737,000, Roadway Improvement Cost: $374,000, Total Project Cost: $5,606,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 13498, Location: .3 MI N US 78:ANNISTON (Lat: 33.616667, Lng: -85.800000), Route carried "on" structure: City street , Year Built: 1960, Year Reconstructed: 1985, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 3,500 (year 2007), Truck Traffic: 15%, Average Future Daily Traffic: 4,700 (year 2027), Design Load: HS 20, Features Intersected: BRANCH, Facility Carried by Structure: COLEMAN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.299, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.8m (32.2ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 11.3m (37.1ft), Out-to-Out Width: 13.6m (44.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Fair, Channel: Fair, Operating Rating: 71.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.65m (5.41ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $292,000, Roadway Improvement Cost: $29,000, Total Project Cost: $438,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 13931, Location: ANNISTON (Lat: 33.683333, Lng: -85.716667), Route carried "on" structure: City street , Year Built: 1986, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 700 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 1,100 (year 2027), Design Load: HS 20, Features Intersected: DRAINAGE DITCH, Facility Carried by Structure: WEST 15TH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.599, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 12.2m (40.0ft) Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 38.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $169,000, Roadway Improvement Cost: $17,000, Total Project Cost: $254,000 ( Estimate for 2008), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 14126, Location: 3 MI E JCT SR 21 (Lat: 33.600000, Lng: -85.766667), Route carried "on" structure: Interstate 20, Year Built: 1969, Year Reconstructed: 1987, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 19,100 (year 2007), Truck Traffic: 39%, Average Future Daily Traffic: 19,864 (year 2027), Design Load: HS 20, Features Intersected: BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 303.516, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 13 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $536,000, Roadway Improvement Cost: $54,000, Total Project Cost: $804,000 ( Estimate for 2008) Find on map >>
Structure Number: 15437, Location: S OF INT P ST & S NOBLE (Lat: 33.616667, Lng: -85.833333), Route carried "on" structure: City street , Year Built: 1991, Status: Open, Structure Length: 1.62m (5.31ft), Average Daily Traffic: 7,600 (year 2007), Truck Traffic: 3%, Average Future Daily Traffic: 9,800 (year 2027), Design Load: H 15, Features Intersected: SNOW CREEK, Facility Carried by Structure: SO. NOBLE STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.499, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 3.7m (12.1ft), Curb-To-Curb Width: 14.2m (46.6ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Channel: Fair, Culverts: Fair, Operating Rating: 85.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.30m (7.55ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $370,000, Roadway Improvement Cost: $37,000, Total Project Cost: $555,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 16369, Location: 0.5 MI W OF AL 21 (Lat: 33.733333, Lng: -85.816667), Route carried "on" structure: City street , Year Built: 1995, Status: Open, Structure Length: 6.10m (20.01ft), Average Daily Traffic: 1,500 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 4,500 (year 2027), Design Load: HS 20+Mod, Features Intersected: NORFOLK SOUTHERN RR, Facility Carried by Structure: NOAH MEDDERS PKWY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.499, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.4m (80.1ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.6m (34.8ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 75.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 7.13m (23.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $985,000, Roadway Improvement Cost: $99,000, Total Project Cost: $1,478,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 18596, Location: TRAINING AREA 16 B (Lat: 33.716667, Lng: -85.750000), Route carried "on" structure: State lands road , Year Built: 1960, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 150 (year 2002), Truck Traffic: 25%, Average Future Daily Traffic: 200 (year 2022), Features Intersected: BRANCH, Facility Carried by Structure: FT. MCCELLAN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Toll: Toll bridge is a segment, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.9m (22.6ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 54.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2004, Bridge Improvement Cost: $168,000, Roadway Improvement Cost: $17,000, Total Project Cost: $252,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 18607, Location: TA 5A1 (Lat: 33.716667, Lng: -85.950000), Route carried "on" structure: State lands road , Year Built: 1983, Status: Open, Structure Length: 5.03m (16.50ft), Average Daily Traffic: 150 (year 2002), Average Future Daily Traffic: 200 (year 2020), Features Intersected: CANE CREEK, Facility Carried by Structure: GATE 5 ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Toll: Toll bridge is a segment, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 4.9m (16.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 25.1m (82.3ft), Curb-To-Curb Width: 5.2m (17.1ft), Out-to-Out Width: 5.6m (18.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 89.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 6.04m (19.82ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2004, Bridge Improvement Cost: $443,000, Roadway Improvement Cost: $44,000, Total Project Cost: $664,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 18608, Location: 6A1 (Lat: 33.716667, Lng: -85.966667), Route carried "on" structure: State lands road , Year Built: 1999, Status: Open, Structure Length: 0.72m (2.36ft), Average Daily Traffic: 150 (year 2002), Truck Traffic: 25%, Average Future Daily Traffic: 200 (year 2022), Features Intersected: CANE CREEK, Facility Carried by Structure: PELHAM RANGE 6A1 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 6, Length of Maximum Span: 0.9m (3.0ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 5.5m (18.0ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 14.5 metric tons, Inventory Rating: 10.9 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 1.35m (4.43ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2004, Bridge Improvement Cost: $175,000, Roadway Improvement Cost: $18,000, Total Project Cost: $263,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 18609, Location: RANGE 8B1 (Lat: 33.683333, Lng: -86.000000), Route carried "on" structure: State lands road , Year Built: 1960, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 150 (year 2002), Truck Traffic: 25%, Average Future Daily Traffic: 200 (year 2022), Features Intersected: TRIBUTARY OFF CANE CREEK, Facility Carried by Structure: PELHAM RANGE 8B1 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Toll: Toll bridge is a segment, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.1m (13.5ft), Curb-To-Curb Width: 5.4m (17.7ft), Out-to-Out Width: 5.7m (18.7ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 14.5 metric tons, Inventory Rating: 10.9 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2004, Bridge Improvement Cost: $135,000, Roadway Improvement Cost: $14,000, Total Project Cost: $203,000 ( Estimate for 2008) Find on map >>
Structure Number: 1861, Location: TRAINING AREA 1D1 (Lat: 33.716667, Lng: -85.900000), Route carried "on" structure: State lands road , Year Built: 1960, Status: Open, Structure Length: 2.44m (8.01ft), Average Daily Traffic: 150 (year 2002), Truck Traffic: 25%, Average Future Daily Traffic: 200 (year 2022), Features Intersected: CANE CREEK, Facility Carried by Structure: GATE 3 ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Wood or Timber, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 5.2m (17.1ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 2.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 1.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 3.29m (10.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2004, Bridge Improvement Cost: $222,000, Roadway Improvement Cost: $22,000, Total Project Cost: $333,000 ( Estimate for 2008), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 18611, Location: TRAINING AREA 1D2 (Lat: 33.716667, Lng: -85.883333), Route carried "on" structure: State lands road , Year Built: 1960, Year Reconstructed: 2001, Status: Open, Structure Length: 0.66m (2.17ft), Average Daily Traffic: 150 (year 2002), Truck Traffic: 25%, Average Future Daily Traffic: 200 (year 2022), Features Intersected: BRANCH, Facility Carried by Structure: DIRT ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Toll: Toll bridge is a segment, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Wood or Timber, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 3.4m (11.2ft), Out-to-Out Width: 3.7m (12.1ft) Condition: Deck: Excellent, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 20.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 15.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.28m (4.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2004, Bridge Improvement Cost: $62,000, Roadway Improvement Cost: $6,000, Total Project Cost: $93,000 ( Estimate for 2008), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 18612, Location: TRAINING RANGE 23A1 (Lat: 33.683333, Lng: -85.600000), Route carried "on" structure: State lands road , Year Built: 1960, Status: Posted for load, Structure Length: 1.07m (3.51ft), Average Daily Traffic: 150 (year 2002), Truck Traffic: 25%, Average Future Daily Traffic: 200 (year 2022), Features Intersected: TRIBUTARY TO CANE CREEK, Facility Carried by Structure: DIRT ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Toll: Toll bridge is a segment, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.4m (11.2ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 4.9m (16.1ft) Condition: Deck: Poor, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 33.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.73m (5.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2004, Bridge Improvement Cost: $110,000, Roadway Improvement Cost: $11,000, Total Project Cost: $165,000 ( Estimate for 2008), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 18613, Location: TRAINING AREA 24A1 (Lat: 33.700000, Lng: -86.000000), Route carried "on" structure: State lands road , Year Built: 1960, Status: Open, Structure Length: 3.26m (10.70ft), Average Daily Traffic: 150 (year 2002), Truck Traffic: 25%, Average Future Daily Traffic: 200 (year 2022), Features Intersected: TRIBUTARY TO CANE CREEK, Facility Carried by Structure: DIRT ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Toll: Toll bridge is a segment, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 4.9m (16.1ft), Material/Design: Wood or Timber, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 4.6m (15.1ft), Curb-To-Curb Width: 3.8m (12.5ft), Out-to-Out Width: 4.1m (13.5ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 31.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.13m (13.55ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2004, Bridge Improvement Cost: $220,000, Roadway Improvement Cost: $22,000, Total Project Cost: $330,000 ( Estimate for 2008), Deck Structure Type: Wood or Timber Find on map >>
Structure Number: 18614, Location: TRAINING AREA 24B1 (Lat: 33.716667, Lng: -85.983333), Route carried "on" structure: State lands road , Year Built: 1960, Status: Closed, Structure Length: 3.66m (12.01ft), Average Daily Traffic: 150 (year 2002), Truck Traffic: 25%, Average Future Daily Traffic: 200 (year 2022), Features Intersected: CANE CREEK, Facility Carried by Structure: DIRT ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Toll: Toll bridge is a segment, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Wood or Timber, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 4.6m (15.1ft), Curb-To-Curb Width: 3.9m (12.8ft), Out-to-Out Width: 4.2m (13.8ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Critical, Channel: Good, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 4.57m (14.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2001, Bridge Improvement Cost: $248,000, Roadway Improvement Cost: $25,000, Total Project Cost: $372,000 ( Estimate for 2008), Deck Structure Type: Steel plate, Wearing Surface/Protective System: Wearing Surface: Gravel Find on map >>
Structure Number: 18615, Location: FORT MCCLELLAN (Lat: 33.700000, Lng: -85.783333), Route carried "on" structure: State lands road , Year Built: 1960, Status: Open, Structure Length: 1.08m (3.54ft), Average Daily Traffic: 150 (year 2002), Average Future Daily Traffic: 200 (year 2022), Features Intersected: TRIBUTARY TO CANE CREEK, Facility Carried by Structure: PATRIOT ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Maintenance Responsibility: State Agenciy, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 5.1m (16.7ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 14.5 metric tons, Inventory Rating: 10.9 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.74m (5.71ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2004, Bridge Improvement Cost: $200,000, Roadway Improvement Cost: $20,000, Total Project Cost: $300,000 ( Estimate for 2008) Find on map >>
Structure Number: 18785, Location: SAKS (Lat: 33.716667, Lng: -85.816667), Route carried "on" structure: County highway , Year Built: 2002, Status: Open, Structure Length: 2.26m (7.41ft), Average Daily Traffic: 266 (year 2002), Average Future Daily Traffic: 396 (year 2022), Design Load: HS 20, Features Intersected: UNKNOWN TRIBUTARY, Facility Carried by Structure: MEDDERS DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Maintenance Responsibility: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Length of Maximum Span: 5.2m (17.1ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.8m (32.2ft) Condition: Channel: Very good, Culverts: Very good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.06m (10.04ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $450,000, Roadway Improvement Cost: $45,000, Total Project Cost: $675,000 ( Estimate for 2008) Find on map >>
Structure Number: 19518, Location: .08 MILES WEST OF US 78 (Lat: 33.616667, Lng: -85.783333), Route carried "on" structure: Bypass City street 431, Year Built: 2003, Status: Open, Structure Length: 1.03m (3.38ft), Average Daily Traffic: 2,000 (year 2007), Average Future Daily Traffic: 2,080 (year 2027), Design Load: HS 20, Features Intersected: BRANCH, Facility Carried by Structure: GOLDEN SPRINGS RD. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.287, Lanes on structure: 5, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 19.0m (62.3ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft) Condition: Channel: Excellent, Culverts: Good, Operating Rating: 89.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 77.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.70m (5.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $784,000, Roadway Improvement Cost: $78,000, Total Project Cost: $1,176,000 ( Estimate for 2008) Find on map >>
Structure Number: 19685, Location: .92 MI N OF I20 (Lat: 33.583333, Lng: -85.916667), Route carried "on" structure: Bypass State highway 202, Year Built: 2001, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 5,370 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 5,434 (year 2027), Design Load: HS 20, Features Intersected: CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.481, Lanes on structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 18.3m (60.0ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft) Condition: Channel: Excellent, Culverts: Good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $802,000, Roadway Improvement Cost: $80,000, Total Project Cost: $1,203,000 ( Estimate for 2008) Discuss this city on our hugely popular Alabama forum Back to: Anniston, AL, Alabama, All US cities.
|
![]() |