Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Anniston, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 104Number of bridges
  • 837ft / 255mTotal length
  • $127,478,000Total costs
  • 601,070Total average daily traffic
  • 56,436Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Anniston
  • No street view available for this location

New bridges in Anniston, AL - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 11920-1929
  • 221930-1939
  • 151940-1949
  • 31950-1959
  • 181960-1969
  • 21970-1979
  • 121980-1989
  • 71990-1999
  • 132000-2009
  • 92010-2019
Reconstructed bridges in Anniston, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Anniston, AL
Average Bridge Truck Traffic in Anniston, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.7%Very good
  • 31.4%Good
  • 28.6%Satisfactory
  • 11.4%Fair
  • 2.9%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Very good
  • 28.6%Good
  • 31.4%Satisfactory
  • 5.7%Fair
  • 2.9%Poor
  • 2.9%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.9%Excellent
  • 22.9%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 11.4%Fair
  • 2.9%Poor
  • 2.9%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.1%Excellent
  • 8.8%Very good
  • 29.7%Good
  • 46.2%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 29.7%Good
  • 51.6%Satisfactory
  • 15.6%Fair
  • 1.6%Poor
  • 1.6%Serious
Find on map >>   Show street view

Structure Number: 74,  Location: ANNISTON E 17th Street (Lat: 33.666264,  Lng: -85.849444),  Route carried "on" structure: City street ,  Year Built: 1913,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 580 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 950 (year 2041),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: EAST 17TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $766,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 87,  Location: 1 MILE N HWY 78 (Lat: 33.895900,  Lng: -87.496900),  Route carried "on" structure: County highway ,  Year Built: 1915,  Status: Closed,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 125 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 250 (year 2030),  Design Load: H 15,  Features Intersected: MILL CREEK,  Facility Carried by Structure: SMITH CHAPEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2013,  Critical Feature Inspection Date: April 2013,  Other Special Inspection Date: April 2013,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $477,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 1311,  Location: 1.2 MI NE INT CHERO #97 (Lat: 34.308889,  Lng: -85.509286),  Route carried "on" structure: County highway 120,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 119 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $184,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $202,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1409,  Location: ANNISTON 7th Street (Lat: 33.653300,  Lng: -85.837400),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 570 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 750 (year 2042),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: 7TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.8m (22.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.32m (4.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $288,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1421,  Location: ANNISTON 10th Street RR (Lat: 33.657061,  Lng: -85.839453),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 14.23m (46.69ft),  Average Daily Traffic: 3,100 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,600 (year 2041),  Design Load: H 15,  Features Intersected: SOU. RR ; CREEK,  Facility Carried by Structure: 10TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.199,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 12,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.02m (49.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,193,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $3,512,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2035,  Location: AL 77 * COOSA RIVER (Lat: 33.941958,  Lng: -86.024942),  Route carried "on" structure: State highway 77,  Year Built: 1939,  Status: Open,  Structure Length: 26.46m (86.81ft),  Average Daily Traffic: 10,161 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,225 (year 2039),  Design Load: H 15,  Features Intersected: COOSA RIVER
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 164.105,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 16,  Length of Maximum Span: 61.6m (202.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 26.46m (86.81ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $3,810,000,  Roadway Improvement Cost: $381,000,  Total Project Cost: $4,191,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2044,  Location: 0.7 N JCT CO RD 016 (Lat: 34.719139,  Lng: -86.706436),  Route carried "on" structure: County highway 88,  Year Built: 1939,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,241 (year 1987),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,990 (year 2035),  Design Load: H 15,  Features Intersected: COON CREEK,  Facility Carried by Structure: SLAUGHTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $288,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3154,  Location: 4.4 MI N JCT US 431 (Lat: 33.738836,  Lng: -85.794036),  Route carried "on" structure: State highway 21,  Year Built: 1926,  Year Reconstructed: 1948,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 19,402 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 27,163 (year 2040),  Design Load: H 15,  Features Intersected: CAVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 420.153,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,321,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,453,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3227,  Location: 2.5 MI N JCT US 431 (Lat: 33.726833,  Lng: -85.809167),  Route carried "on" structure: State highway 21,  Year Built: 1948,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 11,767 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 16,475 (year 2040),  Design Load: H 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 417.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 16 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 37.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.86m (19.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,840,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $3,124,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3228,  Location: 5.4 MI N JCT US 431 (Lat: 33.752278,  Lng: -85.787611),  Route carried "on" structure: State highway 21,  Year Built: 1948,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 22,600 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 31,640 (year 2040),  Design Load: H 15,  Features Intersected: DOTHARD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 421.841,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,179,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,397,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4277,  Location: 2.3 MI WEST JCT SR 21 (Lat: 33.597472,  Lng: -85.866194),  Route carried "on" structure: Bypass US 78,  Year Built: 1952,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 10,748 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,047 (year 2040),  Design Load: H 15,  Features Intersected: SNOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 254.196,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.9m (42.3ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $728,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $801,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5447,  Location: ANNISTON Glen Addie Ave (Lat: 33.652025,  Lng: -85.836150),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 725 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2041),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: GLEN ADDIE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 4.3m (14.1ft),  Right: 4.3m (14.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $636,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $700,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6525,  Location: CITY OF ANNISTON (Lat: 33.642400,  Lng: -85.825900),  Route carried "on" structure: State highway 21,  Year Built: 1959,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 34,670 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 48,538 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 408.065,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 48.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,121,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,233,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6896,  Location: 0.5 MI N OLD US 431 (Lat: 33.730247,  Lng: -85.878486),  Route carried "on" structure: US 431,  Year Built: 1960,  Status: Open,  Structure Length: 1.60m (5.25ft),  Average Daily Traffic: 20,256 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 28,358 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 380.723,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.2m (72.8ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 73.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,782,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $1,960,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7609,  Location: JCT OLD US431 / SR21 (Lat: 33.694722,  Lng: -85.823361),  Route carried "on" structure: State highway 21,  Year Built: 1962,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 34,484 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 48,278 (year 2040),  Design Load: HS 20,  Features Intersected: SNOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 413.843,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.9m (111.2ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.8m (9.2ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,507,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $1,658,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7683,  Location: 2.5 MI N JCT SR 21 (Lat: 33.726664,  Lng: -85.808669),  Route carried "on" structure: State highway 21,  Year Built: 1962,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 11,767 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 16,475 (year 2040),  Design Load: H 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 417.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 16 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.86m (19.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,348,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $3,683,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8645,  Location: ANNISTON McDaniel Ave (Lat: 33.660981,  Lng: -85.847342),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 625 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2041),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: MCDANIEL AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $326,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $359,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8655,  Location: 2 MI E OF AL 21 (Lat: 33.629264,  Lng: -85.799600),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 4,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,500 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: GREENBRIAR DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.8m (9.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 77.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $766,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8689,  Location: ANN W 11th & McDaniel (Lat: 33.658811,  Lng: -85.844833),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.11m (3.64ft),  Average Daily Traffic: 1,100 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,700 (year 2041),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: W11TH*MCDANIEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.3m (17.4ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.78m (5.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $659,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $725,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 87,  Location: ANNISTON W 12th Street (Lat: 33.659731,  Lng: -85.832675),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 700 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 950 (year 2041),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: W 12TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.3m (27.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.8m (9.2ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $439,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9862,  Location: 3 MI E JCT SR 21 (Lat: 33.611478,  Lng: -85.779072),  Route carried "on" structure: Interstate 20,  Year Built: 1969,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 20,519 (year 2018),  Truck Traffic: 40%,  Average Future Daily Traffic: 28,727 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 303.516,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.3m (50.2ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 50.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,095,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,205,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9864,  Location: 3.3 MI E JCT SR 21 (Lat: 33.611047,  Lng: -85.773736),  Route carried "on" structure: Interstate 20,  Year Built: 1969,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 19,747 (year 2020),  Truck Traffic: 40%,  Average Future Daily Traffic: 27,645 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 303.975,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.2m (20.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.24m (13.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,741,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $3,015,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9953,  Location: CITY OF ANNISTON (Lat: 33.663706,  Lng: -85.826756),  Route carried "on" structure: State highway 21,  Year Built: 1969,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 36,424 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 50,994 (year 2040),  Design Load: H 15,  Features Intersected: SNOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 410.301,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 33.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,401,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,541,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12797,  Location: BYNUM-LEATH RD (Lat: 33.644178,  Lng: -85.909431),  Route carried "on" structure: County highway 47,  Year Built: 1982,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 10,087 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,224 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: BYNUM-LEATH RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,852,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $4,237,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12798,  Location: BYNUM LEATHERWOOD (Lat: 33.645886,  Lng: -85.909344),  Route carried "on" structure: County highway 47,  Year Built: 1982,  Status: Open,  Structure Length: 12.68m (41.60ft),  Average Daily Traffic: 5,075 (year 1993),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,700 (year 2036),  Design Load: HS 20,  Features Intersected: CO 072 * SCL RR,  Facility Carried by Structure: BYNUM-LEATH RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.51m (44.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $4,077,000,  Roadway Improvement Cost: $408,000,  Total Project Cost: $4,485,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12812,  Location: BYNUM EXIT (Lat: 33.646336,  Lng: -85.908836),  Route carried "on" structure: County highway 72,  Year Built: 1982,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 4,057 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,149 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: .9 MI N AL 202
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,895,000,  Roadway Improvement Cost: $290,000,  Total Project Cost: $3,185,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12947,  Location: ANNISTON "F" Street (Lat: 33.641864,  Lng: -85.822078),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,200 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,200 (year 2041),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: "F" STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $406,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $447,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1311,  Location: WEAVERRD.*LENLOCK DR. (Lat: 33.728214,  Lng: -85.815275),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 7,150 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,000 (year 2041),  Design Load: HS 20,  Features Intersected: CANE CREEK,  Facility Carried by Structure: Weaver Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.099,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.49m (11.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,008,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,109,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13397,  Location: 8.47 MI E US 78 (Lat: 33.654472,  Lng: -85.837292),  Route carried "on" structure: State highway 202,  Year Built: 1984,  Status: Open,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 13,586 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,020 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.631,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $4,179,000,  Roadway Improvement Cost: $418,000,  Total Project Cost: $4,597,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13398,  Location: 10.1 MI E US 78 (Lat: 33.654486,  Lng: -85.836706),  Route carried "on" structure: State highway 202,  Year Built: 1984,  Status: Open,  Structure Length: 13.84m (45.41ft),  Average Daily Traffic: 13,180 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,764 (year 2033),  Design Load: HS 20,  Features Intersected: NFKSOU RR GLEN ADDIE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.712,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.8m (137.1ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.64m (48.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $8,634,000,  Roadway Improvement Cost: $863,000,  Total Project Cost: $9,497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13399,  Location: 10.3 MI E US 78 (Lat: 33.654503,  Lng: -85.833303),  Route carried "on" structure: State highway 202,  Year Built: 1984,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 14,818 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,745 (year 2038),  Design Load: HS 20,  Features Intersected: ABANDONED R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.017,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.84m (35.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $6,394,000,  Roadway Improvement Cost: $639,000,  Total Project Cost: $7,033,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13498,  Location: .3 MI N US 78:ANNISTON (Lat: 33.618858,  Lng: -85.803528),  Route carried "on" structure: City street ,  Year Built: 1960,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,500 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,700 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: COLEMAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $499,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $549,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13931,  Location: Anniston W 15th & Boynton (Lat: 33.663611,  Lng: -85.849167),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,200 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,700 (year 2041),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: W15TH*BOYNTON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14126,  Location: 3 MI E JCT SR 21 (Lat: 33.611825,  Lng: -85.778803),  Route carried "on" structure: Interstate 20,  Year Built: 1969,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 20,519 (year 2018),  Truck Traffic: 40%,  Average Future Daily Traffic: 28,727 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 303.516,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $936,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,030,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15437,  Location: South Noble Street (Lat: 33.661111,  Lng: -85.829722),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 7,600 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,800 (year 2041),  Design Load: H 15,  Features Intersected: SNOW CREEK,  Facility Carried by Structure: SO. NOBLE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 85.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $652,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $717,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16369,  Location: 0.5 MI W OF AL 21 (Lat: 33.725278,  Lng: -85.821944),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 1,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,500 (year 2041),  Design Load: HS 20,  Features Intersected: ABANDONED RAILROAD,  Facility Carried by Structure: NOAH MEDDERS PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,664,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $1,830,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18198,  Location: 4.6 MI N I20 (Lat: 33.675442,  Lng: -85.794078),  Route carried "on" structure: Bypass US 431,  Year Built: 2006,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 18,798 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 26,317 (year 2039),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 369.457,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $7,768,000,  Roadway Improvement Cost: $777,000,  Total Project Cost: $8,545,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18256,  Location: .25 MI. NORTH OF US 78 (Lat: 33.603000,  Lng: -85.927111),  Route carried "on" structure: Bypass State highway 202,  Year Built: 2001,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 14,119 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,767 (year 2039),  Design Load: HS 20,  Features Intersected: COLD WATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.947,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,465,000,  Roadway Improvement Cost: $347,000,  Total Project Cost: $3,812,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18596,  Location: TRAINING AREA 16 B (Lat: 33.732778,  Lng: -85.756111),  Route carried "on" structure: State lands road ,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 200 (year 2020),  Features Intersected: BRANCH,  Facility Carried by Structure: FT. MCCELLAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Toll: Toll bridge is a segment,  Owner: State Highway Agency,  Maintenance Responsibility: State Agenciy,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $317,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18607,  Location: TA 5A1 (Lat: 33.728111,  Lng: -85.955853),  Route carried "on" structure: State lands road ,  Year Built: 1983,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 150 (year 2021),  Average Future Daily Traffic: 200 (year 2041),  Features Intersected: CANE CREEK,  Facility Carried by Structure: GATE 5 ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Toll: Toll bridge is a segment,  Owner: State Agenciy,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.1m (82.3ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.05m (19.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $746,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $821,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Anniston, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.