Bridge Statistics for Arietta, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Arietta, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 13 Total length: 22 meters (72ft) Total costs: $7,291,000 Total average daily traffic: 7,865 Total average daily truck traffic: 560 Total future (year 2013) average daily traffic: 9,206 National Bridge Inventory (NBI) Registered Bridges for Arietta
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 100477, Location: 2.3 MI W JCT SH 8 & SH 10 (Lat: 43.389919, Lng: -74.593978), Route carried "on" structure: State highway 8, Year Built: 1950, Year Reconstructed: 1986, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 785 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 892 (year 2027), Design Load: HS 20, Features Intersected: SHERIFF LAKE OUTL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.717, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.7m (31.8ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.6m (38.1ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Satisfactory, Channel: Good, Inventory Rating: 66.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $292,000, Total Project Cost: $786,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100478, Location: 1.3 MI W JCT SH 10 & SH 8 (Lat: 43.388769, Lng: -74.575844), Route carried "on" structure: State highway 8, Year Built: 1950, Year Reconstructed: 1986, Status: Open, Structure Length: 2.98m (9.78ft), Average Daily Traffic: 785 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 892 (year 2027), Design Load: H 20, Features Intersected: PISECO LAKE OUTLT Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 22.351, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.6m (93.8ft), Curb-To-Curb Width: 9.5m (31.2ft), Out-to-Out Width: 10.2m (33.5ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.98m (9.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $292,000, Total Project Cost: $786,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100479, Location: 4.2 MI NE JCT RTS 8 & 10 (Lat: 43.427194, Lng: -74.498556), Route carried "on" structure: State highway 8, Year Built: 1950, Year Reconstructed: 1986, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 1,920 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 2,182 (year 2027), Design Load: HS 20, Features Intersected: ROGERS BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 31.533, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft) Condition: Deck: Satisfactory, Superstructure: Excellent, Substructure: Good, Channel: Good, Inventory Rating: 74.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $292,000, Total Project Cost: $786,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1008, Location: 1 MI N HAMILTON CO LINE (Lat: 43.250800, Lng: -74.517736), Route carried "on" structure: State highway 10, Year Built: 1930, Status: Open, Structure Length: 1.64m (5.38ft), Average Daily Traffic: 345 (year 2000), Truck Traffic: 7%, Average Future Daily Traffic: 422 (year 2020), Design Load: HS 20, Features Intersected: W B SACANDAGA RVR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.646, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.5m (50.9ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Poor, Superstructure: Good, Substructure: Fair, Channel: Good, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.64m (5.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $292,000, Total Project Cost: $786,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100801, Location: 2 MI N HAMILTON CO LINE (Lat: 43.255203, Lng: -74.535589), Route carried "on" structure: State highway 10, Year Built: 1969, Status: Open, Structure Length: 2.28m (7.48ft), Average Daily Traffic: 345 (year 2000), Truck Traffic: 7%, Average Future Daily Traffic: 422 (year 2020), Design Load: HS 20, Features Intersected: W BR SACANDAGA RI Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.643, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 10.6m (34.8ft), Out-to-Out Width: 11.7m (38.4ft) Condition: Deck: Good, Superstructure: Excellent, Substructure: Very good, Channel: Very good, Operating Rating: 38.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 22.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $292,000, Total Project Cost: $786,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100804, Location: 1 MI S JCT RTS 8 & 10 (Lat: 43.380989, Lng: -74.544856), Route carried "on" structure: State highway 10, Year Built: 1969, Status: Open, Structure Length: 2.98m (9.78ft), Average Daily Traffic: 345 (year 2000), Truck Traffic: 7%, Average Future Daily Traffic: 422 (year 2020), Design Load: HS 20, Features Intersected: PISECO LAKE OUTLE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.541, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.0m (91.9ft), Curb-To-Curb Width: 10.6m (34.8ft), Out-to-Out Width: 11.7m (38.4ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.98m (9.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $494,000, Roadway Improvement Cost: $292,000, Total Project Cost: $786,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 102028, Location: 11.2 MI SW RTS 28 & 28N (Lat: 43.807031, Lng: -74.610131), Route carried "on" structure: State highway 28, Year Built: 1929, Year Reconstructed: 1991, Status: Open, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 1,622 (year 1999), Truck Traffic: 8%, Average Future Daily Traffic: 1,843 (year 2019), Design Load: H 15, Features Intersected: S INLET RAQUETTE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 25.322, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Very good, Superstructure: Fair, Substructure: Satisfactory, Channel: Very good, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.96m (12.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: July 2006, Critical Feature Inspection Date: July 2006, Underwater Inspection Date: June 2007, Bridge Improvement Cost: $663,000, Roadway Improvement Cost: $394,000, Total Project Cost: $1,057,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 220449, Location: 2.3 MI SW S TIP FERRIS LK (Lat: 43.309883, Lng: -74.654367), Route carried "on" structure: City street , Year Built: 1911, Year Reconstructed: 1967, Status: Posted for load, Structure Length: 1.00m (3.28ft), Average Daily Traffic: 53 (year 1996), Truck Traffic: 5%, Average Future Daily Traffic: 66 (year 2016), Design Load: H 10, Features Intersected: EAST CANADA CREEK, Facility Carried by Structure: POWLEY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 3.9m (12.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 4.2m (13.8ft), Out-to-Out Width: 4.4m (14.4ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 26.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 15.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 12 months, Inspection Date: September 2007, Bridge Improvement Cost: $96,000, Roadway Improvement Cost: $57,000, Total Project Cost: $153,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 22045, Location: .9 MILE NORTH OF PISECO (Lat: 43.458561, Lng: -74.522011), Route carried "on" structure: City street , Year Built: 1960, Status: Posted for load, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 11 (year 1997), Truck Traffic: 5%, Average Future Daily Traffic: 14 (year 2017), Features Intersected: COLD STREAM, Facility Carried by Structure: HASKELL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 4.4m (14.4ft), Out-to-Out Width: 4.9m (16.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Poor, Operating Rating: 31.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 12 months, Inspection Date: September 2007, Bridge Improvement Cost: $91,000, Roadway Improvement Cost: $54,000, Total Project Cost: $145,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 330738, Location: 3.5 MILES SW OF SPY LAKE (Lat: 43.393100, Lng: -74.593892), Route carried "on" structure: County highway , Year Built: 1937, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 79 (year 1997), Truck Traffic: 5%, Average Future Daily Traffic: 98 (year 2017), Design Load: H 20, Features Intersected: BARNES BROOK, Facility Carried by Structure: COUNTY ROAD 24 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $142,000, Roadway Improvement Cost: $84,000, Total Project Cost: $226,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 330739, Location: .2 MILE WEST OF PISECO (Lat: 43.448075, Lng: -74.524831), Route carried "on" structure: County highway , Year Built: 1931, Status: Open, Structure Length: 1.12m (3.67ft), Average Daily Traffic: 633 (year 1993), Truck Traffic: 5%, Average Future Daily Traffic: 785 (year 2013), Design Load: H 20, Features Intersected: MILL STREAM, Facility Carried by Structure: COUNTY ROAD 24 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.0m (32.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 11.4m (37.4ft) Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 96.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.12m (3.67ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $142,000, Roadway Improvement Cost: $84,000, Total Project Cost: $226,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 33074, Location: .1 MILE EAST OF PISECO (Lat: 43.448333, Lng: -74.521011), Route carried "on" structure: County highway , Year Built: 1931, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 309 (year 1998), Truck Traffic: 5%, Average Future Daily Traffic: 383 (year 2018), Design Load: H 20, Features Intersected: COLD STREAM, Facility Carried by Structure: COUNTY ROAD 24 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 11.4m (37.4ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Satisfactory, Channel: Fair, Operating Rating: 67.2 metric tons, Inventory Rating: 28.9 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2007, Underwater Inspection Date: June 1999, Bridge Improvement Cost: $241,000, Roadway Improvement Cost: $143,000, Total Project Cost: $384,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 330741, Location: .3 MILE SE OF PISECO (Lat: 43.443244, Lng: -74.518544), Route carried "on" structure: County highway , Year Built: 1931, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 633 (year 1993), Truck Traffic: 5%, Average Future Daily Traffic: 785 (year 2013), Design Load: H 20, Features Intersected: FALL STREAM, Facility Carried by Structure: COUNTY ROAD 24 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.4m (40.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 11.4m (37.4ft) Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 82.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $241,000, Roadway Improvement Cost: $143,000, Total Project Cost: $384,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Discuss this city on our hugely popular New York forum Back to: Arietta, NY, New York, All US cities.
|
![]() |