U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Ashford, Connecticut (CT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Ashford, CT, Connecticut, Connecticut forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 11 meters (36ft)
Total costs: $20,000
Total average daily traffic: 29,700
Total average daily truck traffic: 1,124
Total future (year 2026) average daily traffic: 14,850
National Bridge Inventory (NBI) Registered Bridges for Ashford

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 1
  • 1930-1939: 3
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 1
  • 1970-1979: 2
  • 1980-1989: 1
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Find on map >>

Structure Number: 997,  Location: .7 MI WEST OF ROUTE 74 (Lat: 41.850000,  Lng: -72.190000),  Route carried "on" structure: US 44,  Year Built: 1929,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 5,400 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,700 (year 2026),  Design Load: H 15,  Features Intersected: KNOWLTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 130.442,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1254,  Location: 2.1 MI SOUTH OF ROUTE 44 (Lat: 41.848333,  Lng: -72.166667),  Route carried "on" structure: State highway 89,  Year Built: 1939,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 2,400 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,200 (year 2026),  Design Load: HS 20,  Features Intersected: MOUNT HOPE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.606,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 56.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1256,  Location: 1.2 MILES NORTH OF RTE 44 (Lat: 41.876667,  Lng: -72.163333),  Route carried "on" structure: State highway 89,  Year Built: 1930,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,600 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,300 (year 2026),  Design Load: H 15,  Features Intersected: MOUNT HOPE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.272,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 82.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4442,  Location: AT EASTFORD TOWN LINE (Lat: 41.945000,  Lng: -72.148333),  Route carried "on" structure: City street ,  Year Built: 1910,  Year Reconstructed: 1985,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 50 (year 1991),  Truck Traffic: 7%,  Average Future Daily Traffic: 25 (year 2026),  Features Intersected: BIGELOW BROOK,  Facility Carried by Structure: BOSTON HOLLOW RD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.060,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 25.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 4584,  Location: 1000 FT EAST OF ROUTE 89 (Lat: 41.873333,  Lng: -72.160000),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 230 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 115 (year 2026),  Design Load: HS 20,  Features Intersected: MOUNT HOPE RIVER,  Facility Carried by Structure: JAMES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4585,  Location: 0.2 MILE WEST OF ROUTE 89 (Lat: 41.888333,  Lng: -72.170000),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 300 (year 1991),  Truck Traffic: 7%,  Average Future Daily Traffic: 150 (year 2026),  Features Intersected: MOUNT HOPE RIVER,  Facility Carried by Structure: WESTFORD HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Other Special Inspection Date: January 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4586,  Location: AT EASTFORD TOWN LINE (Lat: 41.963333,  Lng: -72.151667),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 20 (year 1991),  Truck Traffic: 7%,  Average Future Daily Traffic: 10 (year 2026),  Features Intersected: BIGELOW BROOK,  Facility Carried by Structure: AXE FACTORY RD #2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 5524,  Location: 0.2 MI NORTH OF ROUTE 44 (Lat: 41.880000,  Lng: -72.160000),  Route carried "on" structure: State highway 89,  Year Built: 1930,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 3,100 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,550 (year 2026),  Design Load: HS 20,  Features Intersected: MOUNT HOPE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.727,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 5819,  Location: 1.5 MILE WEST OF ROUTE 44 (Lat: 41.873333,  Lng: -72.203333),  Route carried "on" structure: State highway 74,  Year Built: 1989,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,700 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,850 (year 2026),  Design Load: HS 20,  Features Intersected: KNOWLTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.338,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 58.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 5869,  Location: .1 MI WEST OF ROUTE 89 (Lat: 41.865000,  Lng: -72.161667),  Route carried "on" structure: US 44,  Year Built: 1990,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 9,900 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,950 (year 2026),  Design Load: HS 20,  Features Intersected: MOUNT HOPE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 133.145,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing

Discuss this city on our hugely popular Connecticut forum

Back to: Ashford, CT, Connecticut, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.