Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ashland, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 108ft / 33.1mTotal length
  • $26,375,000Total costs
  • 135,882Total average daily traffic
  • 4,760Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ashland
  • No street view available for this location

New bridges in Ashland, MA - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 11900-1909
  • 21920-1929
  • 31950-1959
  • 31990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Ashland, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11910-1919
  • 01920-1929
  • 11930-1939
  • 01940-1949
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Ashland, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 20.0%Satisfactory
  • 30.0%Fair
  • 10.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 27.3%Fair
  • 9.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 36.4%Good
  • 18.2%Satisfactory
  • 36.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 85.7%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: A1400128ADOTNBI,  Location: 2.5 MI W OF 126 & 135 (Lat: 42.259772,  Lng: -71.451956),  Route carried "on" structure: State highway 135,  Year Built: 1900,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 17,357 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 36,008 (year 2032),  Design Load: H 20,  Features Intersected: WATER SUDBURY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.636,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2021,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $1,664,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $2,497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A14002B7VDOTNBI,  Location: 200 FT E. OF CHESTNUT ST (Lat: 42.258472,  Lng: -71.455478),  Route carried "on" structure: City street 135,  Year Built: 2012,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 13,485 (year 2018),  Truck Traffic: 5%,  Design Load: HL 93,  Features Intersected: WATER SUDBURY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.737,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 74.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,287,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,931,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A14003241MUNNBI,  Location: .1 MI. N. OF ST-135 (Lat: 42.260211,  Lng: -71.456214),  Route carried "on" structure: City street ,  Year Built: 1880,  Year Reconstructed: 1930,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 7,430 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,734 (year 2032),  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY FRONT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $752,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A1400425HMUNNBI,  Location: .2 MI NORTH OF FRONT ST (Lat: 42.262142,  Lng: -71.463356),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 1,030 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,627 (year 2032),  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY CONCORD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $554,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $832,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: A14005242MUNNBI,  Location: .5 MI N OF ST-135 (Lat: 42.263864,  Lng: -71.467019),  Route carried "on" structure: City street ,  Year Built: 1924,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 12,000 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,952 (year 2032),  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY MYRTLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2021,  Underwater Inspection Date: March 2019,  Bridge Improvement Cost: $329,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $494,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A14006243MUNNBI,  Location: 1.3 MI NE OF HOPKINTON (Lat: 42.262333,  Lng: -71.480378),  Route carried "on" structure: City street ,  Year Built: 1870,  Year Reconstructed: 1921,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 13,000 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,531 (year 2031),  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY CORDAVLLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.478,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: August 2020,  Underwater Inspection Date: April 2020,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,163,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,745,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A1400825KMUNNBI,  Location: 1MI. N OF HOPKINTON TL. (Lat: 42.265711,  Lng: -71.496997),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 1,300 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,053 (year 2031),  Design Load: HS 20,  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY HOWE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.012,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $934,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,402,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A14011AE1DOT634,  Location: .1 MI. N. OF ST-135 (Lat: 42.260819,  Lng: -71.453175),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 5,330 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,418 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY FOUNTAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 93.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,756,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $2,635,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A1401329CDOT634,  Location: .1 MI S OF CORDAVILLE RD (Lat: 42.265014,  Lng: -71.498075),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 600 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 948 (year 2031),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY HOWE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,869,000,  Roadway Improvement Cost: $287,000,  Total Project Cost: $4,304,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A140204NYDOTNBI,  Location: AT I-90 MM 110.2 (Lat: 42.285317,  Lng: -71.498158),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 3,000 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,738 (year 2032),  Design Load: HS 20,  Features Intersected: I 90,  Facility Carried by Structure: HWY OAK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 177.345,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.2m (66.3ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,640,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $3,961,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A14022AGPDOT634,  Location: 1 MI W MAIN & PLEASANT (Lat: 42.261644,  Lng: -71.484089),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 8.36m (27.43ft),  Average Daily Traffic: 1,750 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,764 (year 2033),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY HIGH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 82.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,881,000,  Roadway Improvement Cost: $389,000,  Total Project Cost: $5,822,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A140204NYDOTNBI,  Location: .7MI.SO.RTE9 (Lat: 42.283333,  Lng: -71.216667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 29,800 (year 0000),  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY OAK ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 177.345,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: A140204NYDOTNBI,  Location: .7MI.SO.RTE9 (Lat: 42.283333,  Lng: -71.216667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 29,800 (year 0000),  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY OAK ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 177.345,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Discuss Ashland, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.