Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Attleboro, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 58Number of bridges
  • 558ft / 170mTotal length
  • $126,047,000Total costs
  • 1,648,753Total average daily traffic
  • 79,314Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Attleboro
  • No street view available for this location

New bridges in Attleboro, MA - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 21900-1909
  • 21920-1929
  • 11930-1939
  • 11940-1949
  • 131950-1959
  • 191960-1969
  • 11970-1979
  • 11980-1989
  • 61990-1999
  • 42000-2009
  • 62010-2019
Reconstructed bridges in Attleboro, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 51980-1989
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Attleboro, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.9%Very good
  • 40.0%Good
  • 24.4%Satisfactory
  • 24.4%Fair
  • 2.2%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 13.0%Very good
  • 37.0%Good
  • 32.6%Satisfactory
  • 15.2%Fair
  • 2.2%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.9%Very good
  • 43.5%Good
  • 30.4%Satisfactory
  • 15.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 68.2%Good
  • 9.1%Satisfactory
  • 13.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Very good
  • 62.5%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 53270-00051,  Location: GREENWOOD LAKE DAM (Lat: 41.993167,  Lng: -71.282667),  Route carried "on" structure: Federal lands road ,  Year Built: 1993,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 30 (year 2021),  Average Future Daily Traffic: 50 (year 2041),  Features Intersected: G. LAKE DAM SPILLWAY,  Facility Carried by Structure: G. LAKE DAM ROAD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.644,  Lanes on structure: 1,  Owner: Bureau of Fish and Wildlife,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: A160013UXDOTNBI,  Location: AT SEVEN MILE RIVER (Lat: 41.930142,  Lng: -71.337017),  Route carried "on" structure: State highway 123,  Year Built: 1967,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 17,100 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 38,377 (year 2031),  Design Load: H 20,  Features Intersected: WATER SEVEN MILE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.842,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2020,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $44,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160033L1MUNNBI,  Location: .5 MI SW OF READ ST (Lat: 41.901142,  Lng: -71.343453),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 8,100 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,109 (year 2031),  Design Load: HS 20,  Features Intersected: WATER SEVEN MILE RIVER,  Facility Carried by Structure: HWY COUNTY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.7m (18.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Very good,  Inventory Rating: 62.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.20m (0.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $108,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $163,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: A16005AWFMUNNBI,  Location: .2 M FROM JCT N MAIN ST (Lat: 41.951922,  Lng: -71.296686),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.35m (4.43ft),  Average Daily Traffic: 7,113 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 26,769 (year 2032),  Design Load: HS 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.7m (38.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $647,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $971,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: A160068PEMUNNBI,  Location: 0.1 KM FROM WEST ST. (Lat: 41.950631,  Lng: -71.295781),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 2,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,163 (year 2032),  Design Load: HS 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY WATER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $793,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: A160083L3MUNNBI,  Location: .2 MI NW OF RTE 123 (Lat: 41.944883,  Lng: -71.288314),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 1,940 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,896 (year 2032),  Design Load: HS 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY HODGES ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $667,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: A160093UYDOTNBI,  Location: IN ATTL. CENTER (Lat: 41.943744,  Lng: -71.285178),  Route carried "on" structure: State highway 123,  Year Built: 1967,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 13,100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 27,638 (year 2032),  Design Load: H 20,  Features Intersected: WATER TEN MILE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.012,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2021,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $534,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $802,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: A160103L4MUNNBI,  Location: .1 MI W OF RTE 123 (Lat: 41.942136,  Lng: -71.286400),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 2.11m (6.92ft),  Average Daily Traffic: 3,800 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 12,319 (year 2032),  Design Load: H 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY WALL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,158,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,738,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160113HVMUNNBI,  Location: .1 MI SO OF ST 123 (Lat: 41.937417,  Lng: -71.290239),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 8,922 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 30,165 (year 2033),  Design Load: H 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY OLIVE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $561,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $842,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160123L2MUNNBI,  Location: 1.8MI E OF RT.95 (Lat: 41.933058,  Lng: -71.287869),  Route carried "on" structure: City street ,  Year Built: 1905,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 4,914 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,478 (year 2033),  Design Load: HS 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY LAMB ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 82.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: Febuary 2022,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $675,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $1,013,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160133HWMUNNBI,  Location: .1 MI N OF RTE 152 (Lat: 41.927625,  Lng: -71.289286),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 6,600 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,896 (year 2032),  Design Load: HS 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY THACHER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 90.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.50m (1.64ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $373,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $560,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: A16014B0VMUNNBI,  Location: BETWEEN COUNTY&S. MAIN ST (Lat: 41.917811,  Lng: -71.305794),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 6,724 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,476 (year 2031),  Design Load: HS 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY TIFFANY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $635,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: A160153L0MUNNBI,  Location: 100 FT W OF KNIGHT ST (Lat: 41.905169,  Lng: -71.319553),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 4,150 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,738 (year 2031),  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $850,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: A16018945MUNNBI,  Location: @ COLONAL BLAKINGTON INN (Lat: 41.949956,  Lng: -71.290042),  Route carried "on" structure: City street 152,  Year Built: 2012,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 11,598 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,427 (year 2005),  Design Load: HS 25 or greater,  Features Intersected: WATER BUNGAY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.129,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.9m (32.5ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 63.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $431,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A16019400DOT634,  Location: RR MP 198.68 (Lat: 41.961792,  Lng: -71.270128),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 3,464 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,686 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY LINDSEY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.2m (82.7ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $476,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A160203YYDOT634,  Location: .2MI.N OF ST 123 (Lat: 41.952800,  Lng: -71.276511),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 14,400 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 40,430 (year 2032),  Design Load: H 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY HOLDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.1m (59.4ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,037,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $3,056,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A16025AMYDOT634,  Location: RR AMTRAK MP 196.72 (Lat: 41.936275,  Lng: -71.288181),  Route carried "on" structure: City street ,  Year Built: 2013,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 10,900 (year 2018),  Truck Traffic: 6%,  Design Load: HS 25 or greater,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY OLIVE ST
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 97.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,342,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $3,514,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A16026AQPDOT634,  Location: RR AMTRAK MP 196.36 (Lat: 41.931750,  Lng: -71.291347),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 2.33m (7.64ft),  Average Daily Traffic: 13,100 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,110 (year 2031),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY THACHER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,223,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A16027401DOT634,  Location: 1.5 MI NE OF SEEKONK TL (Lat: 41.917625,  Lng: -71.301372),  Route carried "on" structure: State highway 152,  Year Built: 1949,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 16,163 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 22,110 (year 2033),  Design Load: H 20,  Features Intersected: RR AMTRAK/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.963,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $4,861,000,  Roadway Improvement Cost: $487,000,  Total Project Cost: $7,292,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160283YTDOT634,  Location: AMTRAK RR MP 194/51 (Lat: 41.912069,  Lng: -71.305264),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 4,345 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,054 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY THURBER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,017,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,526,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A160293VMDOTNBI,  Location: HEBRONVILLE RR #193.89 (Lat: 41.904364,  Lng: -71.317994),  Route carried "on" structure: State highway 152,  Year Built: 1966,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 12,800 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,794 (year 2033),  Design Load: H 20,  Features Intersected: RR AMTRAK/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.853,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,107,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $3,161,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A16030403DOT634,  Location: AMTRAK RR MM 193.4 (Lat: 41.902189,  Lng: -71.330247),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 5,900 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,265 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY POND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.4m (50.5ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $698,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,048,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A16031AP8DOT634,  Location: AMTRAK MM 192.47 (Lat: 41.899444,  Lng: -71.345694),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 3.40m (11.15ft),  Average Daily Traffic: 14,300 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,477 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY COUNTY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.7m (51.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $595,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A16032B59DOT634,  Location: .2 MI SO I 95 INTERCHANGE (Lat: 41.897892,  Lng: -71.354794),  Route carried "on" structure: Alternate State highway 1A,  Year Built: 2011,  Status: Open,  Structure Length: 2.84m (9.32ft),  Average Daily Traffic: 33,100 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 51,643 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: COMB RR AMTRAK/MBTA RD,  Facility Carried by Structure: ST 1 A/NEWPRT AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.0m (75.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,067,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,601,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A160343YXDOT634,  Location: RR MP 191.13 (Lat: 41.894958,  Lng: -71.371006),  Route carried "on" structure: US 1,  Year Built: 1937,  Status: Open,  Structure Length: 2.88m (9.45ft),  Average Daily Traffic: 28,400 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 44,852 (year 2031),  Design Load: H 20,  Features Intersected: RR AMTRAK/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,887,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,831,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A16036404DOT634,  Location: MP QN 2.03 (Lat: 41.946075,  Lng: -71.247594),  Route carried "on" structure: City street ,  Year Built: 1906,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 4,784 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,896 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY PIKE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $695,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,043,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160413XADOTNBI,  Location: .1 MI SW OF US 1 (Lat: 41.897017,  Lng: -71.373156),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 13,100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 33,955 (year 2031),  Design Load: H 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY BACON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $5,297,000,  Roadway Improvement Cost: $530,000,  Total Project Cost: $7,946,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160423Q4DOTNBI,  Location: .4 MI NO OF R.I. BORDER (Lat: 41.898450,  Lng: -71.369253),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 51,400 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 74,631 (year 2032),  Design Load: HS 20,  Features Intersected: US 1 WASHINGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.674,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.0m (52.5ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,290,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,936,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160423Q5DOTNBI,  Location: I 95 AT US 1 (Lat: 41.898783,  Lng: -71.369094),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 50,173 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 74,631 (year 2032),  Design Load: HS 20,  Features Intersected: US 1 WASHINGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.674,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,098,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $6,148,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160433Q6DOTNBI,  Location: I 95 AT ST1A (Lat: 41.902408,  Lng: -71.355914),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 248,953 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 143,336 (year 2032),  Design Load: HS 20,  Features Intersected: ST 1 A/NEWPORT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.012,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,580,000,  Roadway Improvement Cost: $359,000,  Total Project Cost: $5,371,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160433Q7DOTNBI,  Location: JCT ST 1 A & I-95 (Lat: 41.902658,  Lng: -71.355986),  Route carried "on" structure: Interstate 95,  Year Built: 1961,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 49,000 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 143,243 (year 2032),  Design Load: H 20,  Features Intersected: ST 1 A/NEWPORT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.012,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,580,000,  Roadway Improvement Cost: $359,000,  Total Project Cost: $5,371,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160443Q8DOTNBI,  Location: .5 MI.NE OF ST 1A (Lat: 41.904944,  Lng: -71.347697),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 99,200 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 127,923 (year 2031),  Design Load: HS 20,  Features Intersected: WATER SEVEN MILE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.820,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $41,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $62,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: A160453Q9DOTNBI,  Location: .6 MI NE OF US 1A (Lat: 41.909667,  Lng: -71.339333),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 51,016 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 126,344 (year 2032),  Design Load: HS 20,  Features Intersected: HWY READ ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.510,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,598,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $3,898,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160463QADOTNBI,  Location: .6 MI NE OF ST 1A (Lat: 41.910389,  Lng: -71.339836),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 48,125 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 128,555 (year 2032),  Design Load: HS 20,  Features Intersected: HWY READ ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.510,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,076,000,  Roadway Improvement Cost: $308,000,  Total Project Cost: $4,615,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160473QBDOTNBI,  Location: .5 MI. SW. OF 123 & 95 (Lat: 41.928650,  Lng: -71.324356),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 49,000 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 78,965 (year 2032),  Design Load: HS 20,  Features Intersected: HWY TIFFANY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.954,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $539,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160483QCDOTNBI,  Location: .5 MI SW OF 123 & 95 (Lat: 41.928089,  Lng: -71.323769),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 51,016 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 78,965 (year 2032),  Design Load: HS 20,  Features Intersected: HWY TIFFANY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.954,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,380,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $2,071,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A160493QDDOTNBI,  Location: I 95 AT ST 123 (Lat: 41.934050,  Lng: -71.319825),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 48,125 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 78,965 (year 2032),  Design Load: HS 20,  Features Intersected: ST123 SOUTH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.759,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,385,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $6,578,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Attleboro, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.