National Bridge Inventory (NBI) Statistics
Number of bridges: 11
Total length: 14 meters (46ft)
Total costs: $10,165,000
Total average daily traffic: 56,122
Total average daily truck traffic: 5,130
National Bridge Inventory (NBI) Registered Bridges for Ballston

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 1
  • 1930-1939: 0
  • 1940-1949: 1
  • 1950-1959: 2
  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 5

Reconstructed bridges - Historical Statistics

  • 1980-1989: 1
  • 1990-1999: 1
  • 2000-2009: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 102633,  Location: 1.2MI SW JCT 50 & 67 (Lat: 42.972306,  Lng: -73.862656),  Route carried "on" structure: State highway 50,  Year Built: 1995,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 10,024 (year 2006),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,289 (year 2026),  Design Load: HS 25,  Features Intersected: MOURNING KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.172,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $599,000,  Roadway Improvement Cost: $356,000,  Total Project Cost: $955,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 102915,  Location: RTE 67 & MORNING KILL (Lat: 42.985433,  Lng: -73.931733),  Route carried "on" structure: State highway 67,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,175 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,393 (year 2026),  Features Intersected: MOURNING KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.668,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $322,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 105365,  Location: 0.9 MI SE JCT RTS 50 & 67 (Lat: 42.975933,  Lng: -73.847692),  Route carried "on" structure: State highway 67,  Year Built: 1993,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 16,988 (year 2007),  Truck Traffic: 13%,  Average Future Daily Traffic: 22,191 (year 2027),  Design Load: HS 20,  Features Intersected: MORNING KILL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 25.092,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $3,406,000,  Roadway Improvement Cost: $1,976,000,  Total Project Cost: $5,382,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 220255,  Location: 3MI W BALSTON SPA (Lat: 42.985386,  Lng: -73.933025),  Route carried "on" structure: City street ,  Year Built: 1925,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 159 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 209 (year 2022),  Design Load: HS 25,  Features Intersected: MOURNING KILL,  Facility Carried by Structure: FINLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,011,000,  Roadway Improvement Cost: $601,000,  Total Project Cost: $1,612,000 ( Estimate for 2007),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 330438,  Location: 1.5 MI SW JCT NYS 50 & 67 (Lat: 42.970000,  Lng: -73.879422),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,573 (year 2002),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,308 (year 2022),  Design Load: HS 25,  Features Intersected: MOURNING KILL,  Facility Carried by Structure: MIDDLE LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $280,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 330439,  Location: 4 MI SW BALLSTON SPA (Lat: 42.973783,  Lng: -73.920814),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 629 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 825 (year 2022),  Features Intersected: MOURNING KILL,  Facility Carried by Structure: HOP CITY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 77.5 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $233,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 330467,  Location: .5 MI S JCT NY50(Lat: 42.976589,  Lng: -73.850769),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 20 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 26 ,  Design Load: H 20,  Features Intersected: MOURNING KILL,  Facility Carried by Structure: TIFFAULT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 86.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $462,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 330469,  Location: 1.5 MI SW JCT SH50 & SH67 (Lat: 42.968467,  Lng: -73.881253),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 391 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 513 (year 2022),  Design Load: HS 25,  Features Intersected: MOURNING KILL,  Facility Carried by Structure: DEVILS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $462,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 33047,  Location: BALLSTON SPA (Lat: 42.975917,  Lng: -73.925042),  Route carried "on" structure: City street ,  Year Built: 1949,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 75 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 98 ,  Design Load: H 20,  Features Intersected: MOURNING KILL,  Facility Carried by Structure: LASHER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $136,000 ( Estimate for 2007),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 330471,  Location: 2.2 MI S BALLSTON SPA (Lat: 42.956775,  Lng: -73.848086),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 100 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 131 ,  Design Load: HS 20,  Features Intersected: BALLSTON CREEK,  Facility Carried by Structure: OUTLET ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 79.7 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $201,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $321,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 702917,  Location: JCT RTE 67 & D&H RR (Lat: 42.975847,  Lng: -73.847719),  Route carried "under" structure: State highway 67,  Year Built: 1916,  Structure Length: 2.46m (8.07ft),  Average Daily Traffic: 16,988 (year 2007),  Truck Traffic: 7%,  Features Intersected: RTE 67, MOURNING KILL,  Facility Carried by Structure: DELAWARE & HUDSON
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 24.199,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 24.6m (80.7ft)

Discuss this city on our hugely popular New York forum

Back to: Ballston, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.