Bridge Statistics for Beacon Falls, Connecticut (CT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Beacon Falls, CT, Connecticut, Connecticut forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 15 Total length: 139 meters (456ft) Total costs: $22,000 Total average daily traffic: 193,088 Total average daily truck traffic: 14,566 National Bridge Inventory (NBI) Registered Bridges for Beacon Falls
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 3001, Location: 0.3 MI N. OF ROUTE 42 (Lat: 41.441667, Lng: -73.061667), Route carried "on" structure: City street , Year Built: 1920, Year Reconstructed: 1949, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 8,450 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 4,225 (year 2026), Design Load: H 20, Features Intersected: BEACON FALLS CANAL, Facility Carried by Structure: SOUTH MAIN STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 4, Owner: Town or Township Highway Agency, Approaching Roadway Width: 19.5m (64.0ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.1m (33.1ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 52.2 metric tons, Inventory Rating: 30.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000) Find on map >>
Structure Number: 3432, Location: .4 MILE WEST OF ROUTE 8 (Lat: 41.426667, Lng: -73.071667), Route carried "on" structure: State highway 42, Year Built: 1966, Status: Open, Structure Length: 17.22m (56.50ft), Average Daily Traffic: 5,800 (year 2005), Truck Traffic: 3%, Average Future Daily Traffic: 2,900 (year 2026), Design Load: HS 20, Features Intersected: NAUGATUCK RIVER AND RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.505, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 24.1m (79.1ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.8m (35.4ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 24 months, Inspection Date: November 2006, Underwater Inspection Date: January 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 3788, Location: AT ROUTE 8 EXIT 24 (Lat: 41.435000, Lng: -73.063333), Route carried "on" structure: City street , Year Built: 1935, Year Reconstructed: 1987, Status: Posted for load, Structure Length: 6.46m (21.19ft), Average Daily Traffic: 2,120 (year 2007), Truck Traffic: 40%, Average Future Daily Traffic: 1,060 (year 2026), Design Load: HS 20, Features Intersected: NAUGATUCK RIVER, Facility Carried by Structure: DEPOT STREET Minimum Vertical Clearance: 4.29m (14.07ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 63.1m (207.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Good, Superstructure: Poor, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 14.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 8.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 3 months, Inspection Date: June 2007, Critical Feature Inspection Date: June 2007, Other Special Inspection Date: March 2008, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4383, Location: RTE 8 NEAR EXIT 23 (Lat: 41.430000, Lng: -73.066667), Route carried "on" structure: State highway 8, Year Built: 1981, Status: Open, Structure Length: 13.32m (43.70ft), Average Daily Traffic: 41,100 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 20,550 (year 2026), Design Load: HS 20, Features Intersected: RTE 42 & NAUGATUCK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 33.837, Lanes on structure: 4, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 29.6m (97.1ft), Skew: 33 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 47.5m (155.8ft), Curb-To-Curb Width: 29.6m (97.1ft), Out-to-Out Width: 31.4m (103.0ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 69.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 4384, Location: .4 MILES NORTH OF EXIT 23 (Lat: 41.431667, Lng: -73.066667), Route carried "on" structure: State highway 8, Year Built: 1981, Status: Open, Structure Length: 5.61m (18.41ft), Average Daily Traffic: 41,100 (year 2005), Truck Traffic: 5%, Average Future Daily Traffic: 20,550 (year 2026), Design Load: HS 20, Features Intersected: METRO NRTH RR&PRIVATE RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 34.288, Lanes on structure: 4, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 29.6m (97.1ft), Skew: 32 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 29.3m (96.1ft), Curb-To-Curb Width: 29.6m (97.1ft), Out-to-Out Width: 31.3m (102.7ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 61.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 4385, Location: BET. RTE 8 EXIT 23 & 24 (Lat: 41.440000, Lng: -73.066667), Route carried "on" structure: City street , Year Built: 1981, Status: Open, Structure Length: 7.38m (24.21ft), Average Daily Traffic: 848 (year 2006), Truck Traffic: 2%, Average Future Daily Traffic: 424 (year 2026), Design Load: HS 20, Features Intersected: ROUTE 8, Facility Carried by Structure: LOPUS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.597, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 36.6m (120.1ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 14.2m (46.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 89.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 4386, Location: RTE 8 EXIT 24 (Lat: 41.443333, Lng: -73.066667), Route carried "on" structure: State highway 8, Year Built: 1981, Status: Open, Structure Length: 16.67m (54.69ft), Average Daily Traffic: 20,550 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 10,275 (year 2026), Design Load: HS 20, Features Intersected: METRO NORTH & NAUGTCK RV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 35.382, Lanes on structure: 2, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 14.0m (45.9ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 3, Length of Maximum Span: 59.7m (195.9ft), Curb-To-Curb Width: 14.0m (45.9ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 56.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 4387, Location: RTE 8 EXIT 24 (Lat: 41.443333, Lng: -73.065000), Route carried "on" structure: State highway 8, Year Built: 1981, Status: Open, Structure Length: 15.64m (51.31ft), Average Daily Traffic: 20,550 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 10,275 (year 2026), Design Load: HS 20, Features Intersected: METRO NORTH & NAUGTCK RV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 35.382, Lanes on structure: 2, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 14.0m (45.9ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 3, Length of Maximum Span: 51.8m (169.9ft), Curb-To-Curb Width: 14.0m (45.9ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Very good, Operating Rating: 89.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 53.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 4919, Location: 500 FT E OF ROUTE 8 (Lat: 41.471667, Lng: -73.050000), Route carried "on" structure: City street , Year Built: 1950, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 230 (year 2006), Truck Traffic: 2%, Average Future Daily Traffic: 115 (year 2026), Features Intersected: BEACON HILL BROOK, Facility Carried by Structure: ANDRASKO ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.464, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 8.6m (28.2ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 52.2 metric tons, Inventory Rating: 30.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000) Find on map >>
Structure Number: 5364, Location: NEAR EXIT 25 ROUTE 8 (Lat: 41.476667, Lng: -73.046667), Route carried "on" structure: City street , Year Built: 1933, Status: Open, Structure Length: 0.94m (3.08ft), Average Daily Traffic: 2,090 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 1,045 (year 2026), Design Load: H 15, Features Intersected: BEACON HILL BROOK, Facility Carried by Structure: BEACON VALLEY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.425, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.0m (13.1ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 8.7m (28.5ft) Condition: Superstructure: Fair, Substructure: Serious, Channel: Poor, Operating Rating: 52.2 metric tons, Inventory Rating: 30.6 metric tons, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 6 months, Inspection Date: August 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000) Find on map >>
Structure Number: 6018, Location: .4 MILES S OF MAIN STREET (Lat: 41.442500, Lng: -73.064167), Route carried "on" structure: City street , Year Built: 1991, Status: Open, Structure Length: 1.40m (4.59ft), Average Daily Traffic: 1,050 (year 1993), Truck Traffic: 4%, Average Future Daily Traffic: 525 (year 2026), Design Load: HS 20, Features Intersected: METRO NORTH RAILROAD, Facility Carried by Structure: LOPUS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.129, Lanes on structure: 2, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.5m (41.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.7m (5.6ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 12.4m (40.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 4383, Location: RTE 8 NEAR EXIT 23 (Lat: 41.430000, Lng: -73.066667), Route carried "under" structure: State highway 42, Year Built: 1981, Structure Length: 13.32m (43.70ft), Average Daily Traffic: 8,100 (year 2005), Truck Traffic: 5%, Features Intersected: RTE 42 & NAUGATUCK RIVER, Facility Carried by Structure: ROUTE 8 Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 5.101, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft) Find on map >>
Structure Number: 4385, Location: BET. RTE 8 EXIT 23 & 24 (Lat: 41.440000, Lng: -73.066667), Route carried "under" structure: State highway 8, Year Built: 1981, Structure Length: 7.38m (24.21ft), Average Daily Traffic: 41,100 (year 2005), Truck Traffic: 10%, Features Intersected: ROUTE 8, Facility Carried by Structure: LOPUS ROAD Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 34.964, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft) Find on map >>
Structure Number: 4386, Location: RTE 8 EXIT 24 (Lat: 41.443333, Lng: -73.066667), Route carried "under" structure: Ramp State highway 8, Year Built: 1981, Structure Length: 16.67m (54.69ft), Truck Traffic: 5%, Features Intersected: METRO NORTH & NAUGTCK RV Minimum Vertical Clearance: 8.43m (27.66ft), Kilometerpoint: 0.451, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 59.7m (195.9ft) Find on map >>
Structure Number: 4387, Location: RTE 8 EXIT 24 (Lat: 41.443333, Lng: -73.065000), Route carried "under" structure: Ramp State highway 8, Year Built: 1981, Structure Length: 15.64m (51.31ft), Truck Traffic: 5%, Features Intersected: METRO NORTH & NAUGTCK RV Minimum Vertical Clearance: 8.28m (27.17ft), Kilometerpoint: 0.499, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.8m (169.9ft) Discuss this city on our hugely popular Connecticut forum Back to: Beacon Falls, CT, Connecticut, All US cities.
|
![]() |