U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Becket, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Becket, MA, Massachusetts, Massachusetts forum, All US cities.


National Bridge Inventory (NBI) Statistics
Number of bridges: 27
Total length: 92 meters (302ft)
Total costs: $11,952,000
Total average daily traffic: 144,852
Total average daily truck traffic: 11,877
National Bridge Inventory (NBI) Registered Bridges for Becket

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 3
  • 1920-1929: 3
  • 1930-1939: 4
  • 1940-1949: 1
  • 1950-1959: 10
  • 1960-1969: 3
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 0
  • 2000-2009: 2

Reconstructed bridges - Historical Statistics

  • 1920-1929: 4
  • 1930-1939: 0
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 5
  • 1990-1999: 3

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: B030080AMMHDNBI,  Location: 0.5 MI W OF CHESTER TL (Lat: 42.268056,  Lng: -73.011389),  Route carried "on" structure: US 20,  Year Built: 1914,  Year Reconstructed: 1931,  Status: Posted for load,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 1,700 (year 2004),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,685 (year 2028),  Features Intersected: WATER WALKER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.355,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 20.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $520,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: B030100ANMHDNBI,  Location: 1.2 MI W OF CHESTER TL (Lat: 42.270278,  Lng: -73.021667),  Route carried "on" structure: US 20,  Year Built: 1914,  Year Reconstructed: 1931,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,700 (year 2004),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,685 (year 2028),  Features Intersected: WATER WALKER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.415,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 22.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $470,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: B030110APMHDNBI,  Location: 1.7 MI W OF CHESTER TL (Lat: 42.268056,  Lng: -73.031111),  Route carried "on" structure: US 20,  Year Built: 1906,  Year Reconstructed: 1931,  Status: Posted for load,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 2,600 (year 1997),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,106 (year 2028),  Design Load: H 15,  Features Intersected: WATER WALKER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.562,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $598,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: B030190BAMHDNBI,  Location: 4.9 MI N OF US 20 (Lat: 42.314444,  Lng: -73.093889),  Route carried "on" structure: State highway 8,  Year Built: 1915,  Year Reconstructed: 1928,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,300 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,632 (year 2028),  Features Intersected: WATER YOKUM POND BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.522,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $275,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: B030238VGMHDNBI,  Location: 6.0 MI N OF US 20 (Lat: 42.325278,  Lng: -73.083611),  Route carried "on" structure: State highway 8,  Year Built: 2006,  Status: Open,  Structure Length: 1.50m (4.92ft),  Average Daily Traffic: 1,500 (year 2000),  Average Future Daily Traffic: 2,369 (year 2027),  Design Load: HS 20,  Features Intersected: WATER YOKUM POND BROOK
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 46.380,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.3m (43.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B030240BCMHDNBI,  Location: 6.2 MI N OF US 20 (Lat: 42.329444,  Lng: -73.083611),  Route carried "on" structure: State highway 8,  Year Built: 1922,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 2,300 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,632 (year 2028),  Design Load: H 15,  Features Intersected: WATER YOKUM POND BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.831,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $287,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: B030250BDMHDNBI,  Location: 6.5 MI N OF US 20 (Lat: 42.332222,  Lng: -73.085556),  Route carried "on" structure: State highway 8,  Year Built: 1922,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,500 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,369 (year 2027),  Design Load: H 15,  Features Intersected: WATER SHAKER MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.233,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $254,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: B030367N9MUNNBI,  Location: @ MIDDLEFIELD BDR NR RR (Lat: 42.309444,  Lng: -73.031389),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 140 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 221 (year 2027),  Design Load: HS 20,  Features Intersected: WATER W BR WESTFIELD R,  Facility Carried by Structure: HWY BANCROFT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B03039038MUNNBI,  Location: E OF RT8 NR WASHINGTON (Lat: 42.332222,  Lng: -73.083056),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1983,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 100 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 158 (year 2029),  Features Intersected: WATER W BR WESTFIELD RIV,  Facility Carried by Structure: HWY MAPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $214,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: B03041039MUNNBI,  Location: 300 FT N BROOKER HILL RD (Lat: 42.330833,  Lng: -73.091667),  Route carried "on" structure: City street ,  Year Built: 1939,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 2008),  Average Future Daily Traffic: 158 (year 2029),  Design Load: HS 20,  Features Intersected: WATER MORGAN BROOK,  Facility Carried by Structure: HWY LOVERS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $187,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B030430AQMHDNBI,  Location: 2.2 MI W OF CHESTER TL (Lat: 42.265556,  Lng: -73.040000),  Route carried "on" structure: US 20,  Year Built: 1931,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,600 (year 1997),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,106 (year 2027),  Design Load: H 15,  Features Intersected: WATER WALKER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.701,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $329,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: B0304503AMUNNBI,  Location: S. OF RTE.20 NR CHESTER (Lat: 42.265278,  Lng: -73.015000),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 100 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 158 (year 2028),  Design Load: H 15,  Features Intersected: WATER CUSHMAN BROOK,  Facility Carried by Structure: HWY QUARRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.283,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Other Special Inspection Date: May 2007,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $338,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: B0304703BMUNNBI,  Location: 0.7M SW OF MIDDLEFIELD (Lat: 42.304167,  Lng: -73.039722),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 158 (year 2027),  Design Load: H 15,  Features Intersected: WATER MTN PASTURE BROOK,  Facility Carried by Structure: HWY SURRINER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $191,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: B030520DAMHD634,  Location: 0.1 MI N OF ST 8 (Lat: 42.333333,  Lng: -73.083333),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 900 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,421 (year 2028),  Features Intersected: COMB WESTFLD&PLSNT&RR,  Facility Carried by Structure: HWY HIGH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Critical Feature Inspection Date: April 2007,  Bridge Improvement Cost: $1,897,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $2,846,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: B0305603CMUNNBI,  Location: E OF OCTOBER MTN STE FRST (Lat: 42.315556,  Lng: -73.117778),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 300 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 474 (year 2027),  Features Intersected: WATER YOKUM BROOK,  Facility Carried by Structure: HWY YOKUM PD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.012,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.50m (1.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $107,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $161,000 ( Estimate for 2006)
Find on map >>

Structure Number: B030594G1MTANBI,  Location: .2MI.E.GREENWATER POND B1 (Lat: 42.276878,  Lng: -73.142211),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 21,613 (year 1997),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,133 (year 2027),  Design Load: HS 20,  Features Intersected: US 20 JACOBS LADDER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.588,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $374,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B030594G2MTANBI,  Location: .2MIE.GREENWATER POND B1 (Lat: 42.277083,  Lng: -73.142139),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 21,613 (year 1997),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,133 (year 2027),  Design Load: HS 20,  Features Intersected: US 20 JACOBS LADDER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.588,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $359,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B030604FYMTANBI,  Location: .1MI N. SHAW POND B2 (Lat: 42.261550,  Lng: -73.127664),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 21,613 (year 1997),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,133 (year 2029),  Design Load: HS 20,  Features Intersected: US 20 JACOBS LADDER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.841,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $596,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B030604G0MTANBI,  Location: .1MI N. SHAW POND B2 (Lat: 42.261372,  Lng: -73.127258),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 21,613 (year 1997),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,133 (year 2029),  Design Load: HS 20,  Features Intersected: US 20 JACOBS LADDER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.841,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $596,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B030614FXMTANBI,  Location: .5 MI E. SHAW POND B3 (Lat: 42.249047,  Lng: -73.113703),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 300 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 474 (year 2028),  Design Load: HS 20,  Features Intersected: I 90,  Facility Carried by Structure: HWY WRDN OTIS RD
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 29.611,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,237,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,856,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B030624FWMTANBI,  Location: 1 MI S. US 20 B4 (Lat: 42.244936,  Lng: -73.084031),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 158 (year 2028),  Design Load: HS 20,  Features Intersected: I 90,  Facility Carried by Structure: HWY JOHNSON RD
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 32.025,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $515,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $773,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: B03063002DEMNBI,  Location: OCTOBER MTN STATE FOREST (Lat: 42.312500,  Lng: -73.131944),  Route carried "on" structure: State lands road ,  Year Built: 1964,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 40 (year 1993),  Truck Traffic: 6%,  Average Future Daily Traffic: 63 (year 2027),  Features Intersected: WATER RESERVOIR OUTLET,  Facility Carried by Structure: HWY BKLY DTN RES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $271,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: B03064036MUNNBI,  Location: E OF RT8 NEAR WASHINGTON (Lat: 42.330833,  Lng: -73.083611),  Route carried "on" structure: City street ,  Year Built: 1960,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.50m (4.92ft),  Average Daily Traffic: 20 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 32 (year 2029),  Design Load: H 20,  Features Intersected: WATER W BR WESTFIELD RIV,  Facility Carried by Structure: HWY PRENTICE PL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.9m (12.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.3m (43.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $457,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B030614FXMTANBI,  Location: 0.3 MI S RT 20 (Lat: 42.250000,  Lng: -73.116667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 10,000 (year 0 ),  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY WRDN OTIS RD
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 29.611,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>

Structure Number: B030614FXMTANBI,  Location: 0.3 MI S RT 20 (Lat: 42.250000,  Lng: -73.116667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 10,000 (year 0 ),  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY WRDN OTIS RD
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 29.611,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>

Structure Number: B030624FWMTANBI,  Location: 1 MI S RT 20 (Lat: 42.250000,  Lng: -73.083333),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 10,000 (year 0 ),  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY JOHNSON RD
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 32.025,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>

Structure Number: B030624FWMTANBI,  Location: 1 MI S RT 20 (Lat: 42.250000,  Lng: -73.083333),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 10,000 (year 0 ),  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY JOHNSON RD
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 32.025,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Discuss this city on our hugely popular Massachusetts forum

Back to: Becket, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.