![]() |
Bridge Statistics for Beckley, West Virginia (WV) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Beckley, WV, West Virginia, West Virginia forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 16 Total length: 109 meters (358ft) Total costs: $2,290,000 Total average daily traffic: 317,300 Total average daily truck traffic: 33,210 National Bridge Inventory (NBI) Registered Bridges for Beckley
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Find on map >>
Structure Number: 41A027, Location: 0.13 MI E OF CR 3/49 (Lat: 37.793333, Lng: -81.216667), Route carried "on" structure: State highway 300, Year Built: 1983, Status: Open, Structure Length: 6.10m (20.01ft), Average Daily Traffic: 16,000 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 22,000 (year 2026), Design Load: HS 20, Features Intersected: I-77 NB & SB, Facility Carried by Structure: WV RT 3 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 57.860, Lanes on structure: 6, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 29.9m (98.1ft), Curb-To-Curb Width: 27.1m (88.9ft), Out-to-Out Width: 28.2m (92.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 59.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 37.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 41A073, Location: 0.38 MI. N. OF CR 16/6 (Lat: 37.766667, Lng: -81.200000), Route carried "on" structure: State highway 1600, Year Built: 1958, Status: Posted for load-capacity, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 27,000 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 36,990 (year 2026), Design Load: H 20, Features Intersected: COVA ST., Facility Carried by Structure: WV. 16 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 26.532, Lanes on structure: 5, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 22 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 14.6m (47.9ft), Curb-To-Curb Width: 20.1m (65.9ft), Out-to-Out Width: 22.3m (73.2ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 55.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.96m (12.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $600,000, Roadway Improvement Cost: $50,000, Total Project Cost: $650,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 41A074, Location: 0.09 MI. N. OF WV. 3 (Lat: 37.773333, Lng: -81.196667), Route carried "on" structure: State highway 1600, Year Built: 1959, Status: Open, Structure Length: 0.94m (3.08ft), Average Daily Traffic: 24,500 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 33,565 (year 2026), Design Load: H 20, Features Intersected: BECKLEY BIKE & PED TRAIL, Facility Carried by Structure: WV. RTE. 16 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 27.804, Lanes on structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 18.3m (60.0ft), Skew: 6 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.2m (26.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 21.3m (69.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 63.0 metric tons, Inventory Rating: 28.8 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.98m (3.22ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $400,000, Roadway Improvement Cost: $40,000, Total Project Cost: $440,000 ( Estimate for 2006), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 41A086, Location: 0.07 MI. E. OF CR. 21/3 (Lat: 37.795000, Lng: -81.176667), Route carried "on" structure: County highway 1908, Year Built: 1955, Status: Open, Structure Length: 3.99m (13.09ft), Average Daily Traffic: 10,500 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 14,385 (year 2026), Design Load: HS 15, Features Intersected: ABANDONED C&O RAILROAD, Facility Carried by Structure: COUNTY ROUTE 19/8 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.981, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 17.7m (58.1ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 43.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.99m (13.09ft), Designated Inspection Frequency: Every 12 months, Inspection Date: June 2007, Bridge Improvement Cost: $800,000, Roadway Improvement Cost: $100,000, Total Project Cost: $900,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 41A178, Location: 0.36 MI. E. OF CR. 3/18 (Lat: 37.773333, Lng: -81.220000), Route carried "on" structure: County highway 321, Year Built: 1983, Status: Open, Structure Length: 7.59m (24.90ft), Average Daily Traffic: 18,000 (year 2003), Truck Traffic: 6%, Average Future Daily Traffic: 2,300 (year 2023), Design Load: HS 20+Mod, Features Intersected: I-77, Facility Carried by Structure: CR 3/2 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.092, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 38.4m (126.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 14.4m (47.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 64.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 38.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 41A198, Location: 0.06 MI N OF WV 210 (Lat: 37.790000, Lng: -81.183333), Route carried "on" structure: State highway 1600, Year Built: 1988, Status: Open, Structure Length: 1.25m (4.10ft), Average Daily Traffic: 31,000 (year 2003), Truck Traffic: 6%, Average Future Daily Traffic: 42,500 (year 2023), Design Load: HS 20, Features Intersected: LITTLE WHITESTICK CREEK, Facility Carried by Structure: WV RT 16 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 29.911, Lanes on structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.6m (38.1ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 20.3m (66.6ft), Out-to-Out Width: 24.0m (78.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 67.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 41A219, Location: 0.99 MI. N. OF WV. 3 (Lat: 37.780000, Lng: -81.221667), Route carried "on" structure: Interstate 7700, Year Built: 1984, Status: Open, Structure Length: 15.76m (51.71ft), Average Daily Traffic: 22,000 (year 2005), Truck Traffic: 17%, Average Future Daily Traffic: 46,200 (year 2025), Design Load: HS 20+Mod, Features Intersected: CABELL RD, WHITESTICK, Facility Carried by Structure: I-77 N Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 70.136, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On Interstate toll segment, Owner: State Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Skew: 32 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 4, Length of Maximum Span: 35.7m (117.1ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.5m (44.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 60.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 30.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 41A22, Location: WV ROUTE 16 (Lat: 37.758333, Lng: -81.213333), Route carried "on" structure: Interstate 7700, Year Built: 1984, Status: Open, Structure Length: 10.52m (34.51ft), Average Daily Traffic: 23,000 (year 2006), Truck Traffic: 17%, Average Future Daily Traffic: 48,300 (year 2026), Design Load: HS 20+Mod, Features Intersected: WV. 16, Facility Carried by Structure: I-77 NB. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 67.578, Lanes on structure: 3, Lanes under structure: 8, Base Highway Network: Yes, Toll: On Interstate toll segment, Owner: State Toll Authority, Approaching Roadway Width: 15.5m (50.9ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 4, Length of Maximum Span: 27.1m (88.9ft), Curb-To-Curb Width: 16.4m (53.8ft), Out-to-Out Width: 17.5m (57.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 56.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 41A265, Location: 0.10 MI. EAST OF US 19 (Lat: 37.806667, Lng: -81.181667), Route carried "on" structure: County highway 800, Year Built: 1996, Status: Open, Structure Length: 2.16m (7.09ft), Average Daily Traffic: 11,500 (year 2003), Truck Traffic: 6%, Average Future Daily Traffic: 14,786 (year 2023), Design Load: HS 25, Features Intersected: CRANBERRY CREEK, Facility Carried by Structure: CO 8 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.161, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.7m (67.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.2m (33.5ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 68.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.16m (7.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $250,000, Roadway Improvement Cost: $50,000, Total Project Cost: $300,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 41A027, Location: 0.13 MI E OF CR 3/49 (Lat: 37.793333, Lng: -81.216667), Route carried "under" structure: Interstate 7700, Year Built: 1983, Structure Length: 6.10m (20.01ft), Average Daily Traffic: 44,000 (year 2006), Truck Traffic: 17%, Features Intersected: WV RT 3, Facility Carried by Structure: WV RT 3 Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 71.713, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.0m (200.1ft) Find on map >>
Structure Number: 41A073, Location: 0.38 MI. N. OF CR 16/6 (Lat: 37.766667, Lng: -81.200000), Route carried "under" structure: City street , Year Built: 1958, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 100 (year 2006), Features Intersected: WV.16, Facility Carried by Structure: WV. 16 Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.6m (129.9ft) Find on map >>
Structure Number: 41A075, Location: 0.03 MI S OF CR 3/71 (Lat: 37.788333, Lng: -81.190000), Route carried "under" structure: State highway 1600, Year Built: 1950, Structure Length: 2.83m (9.28ft), Average Daily Traffic: 28,000 (year 2003), Truck Traffic: 6%, Features Intersected: BECKLEY BIKE TRAIL, Facility Carried by Structure: BECKLEY BIKE TRAIL Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 29.396, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 26.5m (86.9ft) Find on map >>
Structure Number: 41A178, Location: 0.36 MI. E. OF CR. 3/18 (Lat: 37.773333, Lng: -81.220000), Route carried "under" structure: Interstate 7700, Year Built: 1983, Structure Length: 7.59m (24.90ft), Average Daily Traffic: 44,000 (year 2005), Truck Traffic: 16%, Features Intersected: CR. 3/21, Facility Carried by Structure: CR 3/2 Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 69.364, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 75.9m (249.0ft) Find on map >>
Structure Number: 41A219, Location: 0.99 MI. N. OF WV. 3 (Lat: 37.780000, Lng: -81.221667), Route carried "under" structure: County highway 1801, Year Built: 1984, Structure Length: 15.76m (51.71ft), Average Daily Traffic: 100 (year 2003), Features Intersected: I-77 N., Facility Carried by Structure: I-77 N Minimum Vertical Clearance: 7.44m (24.41ft), Kilometerpoint: 1.335, Lanes on structure: 2, Lanes under structure: 2, Toll: On Interstate toll segment, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 157.6m (517.1ft) Find on map >>
Structure Number: 41A22, Location: WV ROUTE 16 (Lat: 37.758333, Lng: -81.213333), Route carried "under" structure: State highway 1600, Year Built: 1984, Structure Length: 10.52m (34.51ft), Average Daily Traffic: 17,500 (year 2006), Truck Traffic: 6%, Features Intersected: I-77, Facility Carried by Structure: I-77 NB. Minimum Vertical Clearance: 5.48m (17.98ft), Kilometerpoint: 25.133, Lanes on structure: 3, Lanes under structure: 8, Toll: On Interstate toll segment, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 105.2m (345.1ft) Find on map >>
Structure Number: 41A22, Location: WV ROUTE 16 (Lat: 37.758333, Lng: -81.213333), Route carried "under" structure: Other road 1616, Year Built: 1984, Structure Length: 10.52m (34.51ft), Average Daily Traffic: 100 (year 2006), Features Intersected: I-77, Facility Carried by Structure: I-77 NB. Minimum Vertical Clearance: 6.09m (19.98ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 8, Toll: On Interstate toll segment, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 105.2m (345.1ft) Discuss this city on our hugely popular West Virginia forum Back to: Beckley, WV, West Virginia, All US cities.
|
![]() |