Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bedford, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 92ft / 28.5mTotal length
  • $25,064,000Total costs
  • 216,945Total average daily traffic
  • 8,237Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bedford
  • No street view available for this location

New bridges in Bedford, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 21960-1969
  • 61970-1979
  • 12000-2009
Reconstructed bridges in Bedford, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 02000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Bedford, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 10.0%Very good
  • 30.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 50.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Satisfactory
  • 50.0%Fair
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 101659,  Location: 3.0 MI S JCT RTS 22+172 (Lat: 41.226550,  Lng: -73.656872),  Route carried "on" structure: State highway 22,  Year Built: 1927,  Status: Posted for load-capacity,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 4,143 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,162 (year 2040),  Design Load: H 20,  Features Intersected: STONE HILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.808,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 10.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 7.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $335,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $531,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10374,  Location: 1 MI NE JCT SH 22 & SH121 (Lat: 41.215781,  Lng: -73.631947),  Route carried "on" structure: State highway 121,  Year Built: 2002,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 4,107 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,989 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: STONE HILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.0m (49.2ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $340,000,  Total Project Cost: $920,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 105305,  Location: 3.3 MI N EXIT 3 OF I684 (Lat: 41.181111,  Lng: -73.685408),  Route carried "on" structure: Other road ,  Year Built: 1971,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 47 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 66 (year 2017),  Design Load: HS 20,  Features Intersected: 684I684I87011118 SB, RTE,  Facility Carried by Structure: SANCTUARY CONNECT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 95.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.34m (24.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,169,000,  Roadway Improvement Cost: $1,856,000,  Total Project Cost: $5,024,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1053071,  Location: JCT RTS I684+172 (Lat: 41.195128,  Lng: -73.686506),  Route carried "on" structure: Interstate 684,  Year Built: 1971,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 29,979 (year 2000),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: RTE 172
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.386,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,326,000,  Roadway Improvement Cost: $1,948,000,  Total Project Cost: $5,273,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1053072,  Location: JCT RTS I684+172 (Lat: 41.194992,  Lng: -73.686197),  Route carried "on" structure: Interstate 684,  Year Built: 1971,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 27,992 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 47,401 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 172
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.450,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,446,000,  Roadway Improvement Cost: $2,018,000,  Total Project Cost: $5,463,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105308,  Location: 0.9 MI N JCT RTS I684+172 (Lat: 41.208306,  Lng: -73.685419),  Route carried "on" structure: Other road ,  Year Built: 1968,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 7.04m (23.10ft),  Truck Traffic: 3%,  Design Load: HS 20,  Features Intersected: 684I684I87011137, RTE I6,  Facility Carried by Structure: GUARD HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.397,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,405,000,  Roadway Improvement Cost: $1,994,000,  Total Project Cost: $5,399,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222491,  Location: 4.6 MI NE OF MOUNT KISCO (Lat: 41.220156,  Lng: -73.646808),  Route carried "on" structure: Other road ,  Year Built: 1956,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 352 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 493 (year 2037),  Features Intersected: BEAVER DAM CREEK,  Facility Carried by Structure: HOOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.076,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $361,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $573,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 222492,  Location: 5.1 MI E OF MOUNT KISCO (Lat: 41.201606,  Lng: -73.632711),  Route carried "on" structure: Other road ,  Year Built: 1941,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,180 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,652 (year 2039),  Features Intersected: MIANUS RIVER,  Facility Carried by Structure: MIDDLE PATENT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $252,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222493,  Location: 5.5 MI E OF MOUNT KISCO (Lat: 41.194144,  Lng: -73.624072),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 105 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 147 (year 2035),  Design Load: HS 20,  Features Intersected: MIANUS RIVER,  Facility Carried by Structure: MILLERS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $761,000,  Roadway Improvement Cost: $445,000,  Total Project Cost: $1,206,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334794,  Location: 4.6 MI EAST OF MT KISCO (Lat: 41.195247,  Lng: -73.643308),  Route carried "on" structure: County highway ,  Year Built: 1919,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,879 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,562 (year 2040),  Features Intersected: MIANUS RIVER,  Facility Carried by Structure: GREENWICH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.004,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $423,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105305,  Location: 3.3 MI N EXIT 3 OF I684 (Lat: 41.181111,  Lng: -73.685408),  Route carried "under" structure: Interstate 684,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 62,545 (year 2002),  Features Intersected: 684I684I87011118 SB, RTE,  Facility Carried by Structure: SANCTUARY CONNECT
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 18.874,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 1053071,  Location: JCT RTS I684+172 (Lat: 41.195128,  Lng: -73.686506),  Route carried "under" structure: State highway 172,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 12,500 (year 1972),  Features Intersected: RTE 172,  Facility Carried by Structure: RTE I684
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 16.364,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 1053072,  Location: JCT RTS I684+172 (Lat: 41.194992,  Lng: -73.686197),  Route carried "under" structure: State highway 172,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 12,500 (year 1972),  Features Intersected: RTE 172,  Facility Carried by Structure: RTE I684
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 16.364,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 105308,  Location: 0.9 MI N JCT RTS I684+172 (Lat: 41.208306,  Lng: -73.685419),  Route carried "under" structure: Interstate 684,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 58,616 (year 2002),  Features Intersected: 684I684I87011137, RTE I6,  Facility Carried by Structure: GUARD HILL ROAD
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 21.947,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.5m (119.8ft)

Discuss Bedford, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.