![]() |
Bridge Statistics for Belen, New Mexico (NM) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Belen, NM, New Mexico, New Mexico forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 19 Total length: 104 meters (341ft) Total costs: $1,917,000 Total average daily traffic: 140,134 Total average daily truck traffic: 8,348 National Bridge Inventory (NBI) Registered Bridges for Belen
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 5985, Location: 0.9 MI. N. OF NM309-BELEN (Lat: 34.675000, Lng: -106.771667), Route carried "on" structure: Interstate L0013, Year Built: 1964, Status: Open, Structure Length: 6.46m (21.19ft), Average Daily Traffic: 19,548 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 25,480 (year 2027), Design Load: HS 20, Features Intersected: AT&SF RAILROAD, Facility Carried by Structure: LOOP-13 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.779, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 18.9m (62.0ft), Skew: 23 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.7m (81.0ft), Curb-To-Curb Width: 19.2m (63.0ft), Out-to-Out Width: 19.5m (64.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 61.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 7036, Location: S BELEN INTR-CHANGE (Lat: 34.633333, Lng: -106.780000), Route carried "on" structure: Interstate L0013, Year Built: 1970, Year Reconstructed: 1990, Status: Open, Structure Length: 11.37m (37.30ft), Average Daily Traffic: 2,403 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 3,132 (year 2027), Design Load: HS 20, Features Intersected: I-25 NBLS/SBLS, Facility Carried by Structure: LOOP-13/BELEN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.298, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 4 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 37.5m (123.0ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 7116, Location: 0.4 MI E OF JCT NM-314 (Lat: 34.693333, Lng: -106.761667), Route carried "on" structure: City street , Year Built: 1970, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 1,604 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 2,172 (year 2027), Features Intersected: IRRIGATION DITCH, Facility Carried by Structure: COUNTY RD-269 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.644, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Wood or Timber, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 56.7 metric tons, Inventory Rating: 40.5 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 7127, Location: 1.9 MI E I-25 N BELEN INT (Lat: 34.530000, Lng: -106.766667), Route carried "on" structure: State highway 314, Year Built: 1970, Status: Open, Structure Length: 6.10m (20.01ft), Average Daily Traffic: 5,539 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 7,219 (year 2027), Design Load: HS 20, Features Intersected: LOOP 13/BELEN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.032, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 3, Length of Maximum Span: 32.3m (106.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 6.10m (20.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $486,000, Roadway Improvement Cost: $48,000, Total Project Cost: $729,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 7129, Location: 2.8 MI N OF S BELEN INTER (Lat: 34.670000, Lng: -106.795000), Route carried "on" structure: Interstate 25, Year Built: 1970, Year Reconstructed: 1990, Status: Open, Structure Length: 4.11m (13.48ft), Average Daily Traffic: 6,081 (year 2007), Truck Traffic: 12%, Average Future Daily Traffic: 9,153 (year 2027), Design Load: HS 20, Features Intersected: ARAGON RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 310.716, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 16.5m (54.1ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 713, Location: 2.8 MI N OF S BELEN INTER (Lat: 34.670000, Lng: -106.795000), Route carried "on" structure: Interstate 25, Year Built: 1970, Year Reconstructed: 1990, Status: Open, Structure Length: 4.11m (13.48ft), Average Daily Traffic: 6,117 (year 2007), Truck Traffic: 12%, Average Future Daily Traffic: 9,208 (year 2027), Design Load: HS 20, Features Intersected: ARAGON RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 310.716, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 16.2m (53.1ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 7449, Location: .3 MI E OF JCT I-25/BELEN (Lat: 34.706667, Lng: -106.780000), Route carried "on" structure: Interstate L0013, Year Built: 1970, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 19,831 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 25,849 (year 2027), Design Load: HS 20, Features Intersected: BELEN HIGHLINE CANAL, Facility Carried by Structure: LOOP-13/BELEN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 10.055, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 28.0m (91.9ft), Skew: 10 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.34m (4.40ft), Designated Inspection Frequency: Every 48 months, Inspection Date: January 2005, Bridge Improvement Cost: $792,000, Roadway Improvement Cost: $79,000, Total Project Cost: $1,188,000 ( Estimate for 2008) Find on map >>
Structure Number: 8683, Location: 2.5 MI E OF MAIN ST/BELEN (Lat: 34.653333, Lng: -106.738333), Route carried "on" structure: State highway 309, Year Built: 1987, Status: Open, Structure Length: 18.38m (60.30ft), Average Daily Traffic: 19,130 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 24,332 (year 2027), Design Load: HS 20, Features Intersected: RIO GRANDE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.023, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 21 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 22.9m (75.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.7m (5.6ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 22.3m (73.2ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 892, Location: 0.5 MI W OF 10TH ST/BELEN (Lat: 34.658333, Lng: -106.788333), Route carried "on" structure: City street 5224, Year Built: 1970, Year Reconstructed: 1993, Status: Open, Structure Length: 1.52m (4.99ft), Average Daily Traffic: 2,088 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 2,827 (year 2027), Design Load: HS 20, Features Intersected: BELEN HIGHLINE CANAL, Facility Carried by Structure: DELGADO STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.364, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 12.9m (42.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 35.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 8963, Location: 0.9 MI W OF MAIN ST/BELEN (Lat: 34.670000, Lng: -106.788333), Route carried "on" structure: City street 4228, Year Built: 1995, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 977 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 1,323 (year 2027), Features Intersected: BELEN HIGHLINE CANAL, Facility Carried by Structure: ARAGON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.448, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb-To-Curb Width: 13.3m (43.6ft), Out-to-Out Width: 16.4m (53.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 9028, Location: 0.62 MI W OF MAIN STREET (Lat: 34.650000, Lng: -106.783333), Route carried "on" structure: City street 4224, Year Built: 1996, Status: Open, Structure Length: 1.16m (3.81ft), Average Daily Traffic: 5,324 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 5,400 (year 2027), Design Load: HS 20, Features Intersected: BELEN HIGHLINE CANAL, Facility Carried by Structure: CAMINO EL LLANO Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.515, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.4m (34.1ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007 Find on map >>
Structure Number: 904, Location: 0.5 MI E OF JCT LOOP-13 (Lat: 34.661333, Lng: -106.767833), Route carried "on" structure: State highway 309, Year Built: 2004, Status: Open, Structure Length: 12.01m (39.40ft), Average Daily Traffic: 19,953 (year 2007), Truck Traffic: 4%, Average Future Daily Traffic: 20,238 (year 2027), Design Load: HS 20, Features Intersected: BNSF RAILROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 20 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 45.7m (149.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 26.2m (86.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 64.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 7037, Location: 1.6 MI N OF S BELEN INTER (Lat: 34.653333, Lng: -106.795000), Route carried "under" structure: City street 4224, Year Built: 1970, Structure Length: 4.30m (14.11ft), Average Daily Traffic: 5,324 (year 2007), Features Intersected: I-25 NBL, Facility Carried by Structure: I-25 NBL Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.064, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.5m (54.1ft) Find on map >>
Structure Number: 7038, Location: 1.6 MI N OF S BELEN INTER (Lat: 34.653333, Lng: -106.795000), Route carried "under" structure: City street 4224, Year Built: 1970, Structure Length: 4.27m (14.01ft), Average Daily Traffic: 3,987 (year 2007), Features Intersected: I-25 SBL, Facility Carried by Structure: I-25 SBL Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.048, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.5m (54.1ft) Find on map >>
Structure Number: 7046, Location: NORTH BELEN INTERCHANGE (Lat: 34.690000, Lng: -106.788333), Route carried "under" structure: Interstate L0013, Year Built: 1970, Structure Length: 6.80m (22.31ft), Average Daily Traffic: 7,163 (year 2007), Truck Traffic: 6%, Features Intersected: I-25 NBL, Facility Carried by Structure: I-25 NBL Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 1.038, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.9m (98.1ft) Find on map >>
Structure Number: 7047, Location: NORTH BELEN INTERCHANGE (Lat: 34.690000, Lng: -106.788333), Route carried "under" structure: Interstate L0013, Year Built: 1970, Structure Length: 6.71m (22.01ft), Average Daily Traffic: 7,163 (year 2007), Truck Traffic: 6%, Features Intersected: I-25 SBL, Facility Carried by Structure: I-25 SBL Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 10.396, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.9m (98.1ft) Find on map >>
Structure Number: 7127, Location: 1.9 MI E I-25 N BELEN INT (Lat: 34.530000, Lng: -106.766667), Route carried "under" structure: Interstate L0013, Year Built: 1970, Structure Length: 6.10m (20.01ft), Average Daily Traffic: 4,688 (year 2007), Features Intersected: LOOP-13/BELEN, Facility Carried by Structure: NM-314 Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 7.564, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.3m (106.0ft) Find on map >>
Structure Number: 7129, Location: 2.8 MI N OF S BELEN INTER (Lat: 34.670000, Lng: -106.795000), Route carried "under" structure: City street 4228, Year Built: 1970, Structure Length: 4.11m (13.48ft), Average Daily Traffic: 1,607 (year 2007), Truck Traffic: 13%, Features Intersected: I-25 NBL, Facility Carried by Structure: I-25 NBL Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 0.058, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.5m (54.1ft) Find on map >>
Structure Number: 713, Location: 2.8 MI N OF S BELEN INTER (Lat: 34.670000, Lng: -106.795000), Route carried "under" structure: City street 4228, Year Built: 1970, Structure Length: 4.11m (13.48ft), Average Daily Traffic: 1,607 (year 2007), Truck Traffic: 13%, Features Intersected: I-25 SBL, Facility Carried by Structure: I-25 SBL Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 0.039, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.2m (53.1ft) Discuss this city on our hugely popular New Mexico forum Back to: Belen, NM, New Mexico, All US cities.
|
![]() |