  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 102ft / 30.7mTotal length
  • $17,595,000Total costs
  • 5,862Total average daily traffic
  • 429Total average daily truck traffic
  • 7,043Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Berne
  • No street view available for this location

New bridges in Berne, NY - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11940-1949
  • 21960-1969
  • 31970-1979
  • 41990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Berne, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 32010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Excellent
  • 46.2%Very good
  • 7.7%Good
  • 30.8%Satisfactory
  • 7.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 38.5%Excellent
  • 7.7%Very good
  • 30.8%Good
  • 23.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Excellent
  • 15.4%Very good
  • 30.8%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Very good
  • 37.5%Good
  • 18.8%Satisfactory
  • 37.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 102526,  Location: 5.7 MI SW JCT SH443&SH146 (Lat: 42.627403,  Lng: -74.156986),  Route carried "on" structure: State highway 443,  Year Built: 1931,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 626 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 653 (year 2040),  Features Intersected: FOX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.234,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $2,638,000,  Roadway Improvement Cost: $1,545,000,  Total Project Cost: $4,183,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102527,  Location: JCT SH 443 & SH 156 (Lat: 42.625372,  Lng: -74.133819),  Route carried "on" structure: State highway 443,  Year Built: 1973,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 626 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 653 (year 2040),  Design Load: HL 93,  Features Intersected: FOX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.278,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $570,000,  Roadway Improvement Cost: $334,000,  Total Project Cost: $904,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103867,  Location: .7 MI N JCT S H 443 & 156 (Lat: 42.634078,  Lng: -74.137139),  Route carried "on" structure: State highway 156,  Year Built: 1963,  Status: Closed,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 895 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 933 (year 2040),  Design Load: H 20,  Features Intersected: BEAVERDAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $842,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 10745,  Location: .5 MI EAST OF EAST BERNE (Lat: 42.612408,  Lng: -74.066756),  Route carried "on" structure: State highway 443,  Year Built: 1963,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,112 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,160 (year 2040),  Design Load: HS 20,  Features Intersected: FOX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.665,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $132,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $210,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220013,  Location: 2.0MI W OF EAST BERNE (Lat: 42.621317,  Lng: -74.111103),  Route carried "on" structure: Other road ,  Year Built: 1978,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 46 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 64 (year 2039),  Features Intersected: FOX CREEK,  Facility Carried by Structure: KAEHLER LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Fair,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $394,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 330086,  Location: .8 MI WEST OF EAST BERNE (Lat: 42.613650,  Lng: -74.089719),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 560 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: FOX CREEK,  Facility Carried by Structure: CR 2, COLE HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.434,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $367,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $583,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330087,  Location: 1.3 MI E OF WEST BERNE (Lat: 42.625553,  Lng: -74.159706),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 374 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 524 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: FOX CREEK,  Facility Carried by Structure: SWITZKILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.409,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $921,000,  Roadway Improvement Cost: $539,000,  Total Project Cost: $1,461,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330088,  Location: HAMLET OF WEST BERNE (Lat: 42.628692,  Lng: -74.184086),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 503 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 704 (year 2039),  Design Load: HS 20,  Features Intersected: FOX CREEK,  Facility Carried by Structure: BRADT HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,281,000,  Roadway Improvement Cost: $750,000,  Total Project Cost: $2,031,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330089,  Location: 1 MI S OF WEST BERNE (Lat: 42.614789,  Lng: -74.181497),  Route carried "on" structure: County highway ,  Year Built: 1949,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 183 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 256 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BRADT HOLLOW CREEK,  Facility Carried by Structure: CANADAY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.767,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $789,000,  Roadway Improvement Cost: $462,000,  Total Project Cost: $1,251,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33009,  Location: 1.5 MILES SW OF BERNE (Lat: 42.618567,  Lng: -74.161103),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 183 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 256 (year 2039),  Design Load: HS 20,  Features Intersected: SWITZ KILL,  Facility Carried by Structure: CR 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.811,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $759,000,  Roadway Improvement Cost: $444,000,  Total Project Cost: $1,203,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 330091,  Location: 1.2MI SW OF BERNE (Lat: 42.611436,  Lng: -74.156056),  Route carried "on" structure: County highway ,  Year Built: 1973,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 113 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 158 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: SWITZ KILL,  Facility Carried by Structure: SICKLE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.224,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $469,000,  Total Project Cost: $1,271,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330092,  Location: 1.9 M SW VILLAGE OF BERNE (Lat: 42.598325,  Lng: -74.150869),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 93 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 130 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: SWITZ KILL,  Facility Carried by Structure: RAVINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.914,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $469,000,  Total Project Cost: $1,270,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330093,  Location: 1.7 MI NW OF SOUTH BERNE (Lat: 42.576686,  Lng: -74.121272),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 63 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 88 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SWITZ KILL,  Facility Carried by Structure: GIFFORD HOLLOW ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.475,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $595,000,  Roadway Improvement Cost: $349,000,  Total Project Cost: $944,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330094,  Location: 1.8 MI SW OF HUNTERSLAND (Lat: 42.561044,  Lng: -74.231911),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 157 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 220 (year 2036),  Design Load: HS 20,  Features Intersected: LITTLE SCHOHARIE CREEK,  Facility Carried by Structure: HUNTERSLAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.990,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $470,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330096,  Location: 1.3 MI NW OF SOUTH BERNE (Lat: 42.566631,  Lng: -74.124483),  Route carried "on" structure: State lands road ,  Year Built: 1932,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 44 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 62 (year 2039),  Features Intersected: TRIBUTARY TO SWITZ KILL,  Facility Carried by Structure: GIFFORD HOLLOW ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.979,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $399,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3301,  Location: 1 MI NW OF SOUTH BERNE (Lat: 42.568081,  Lng: -74.112622),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 444 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 622 (year 2039),  Features Intersected: SWITZ KILL,  Facility Carried by Structure: SWITZKILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.026,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $179,000 ( Estimate for 2021)