![]() |
Bridge Statistics for Big Beaver, Pennsylvania (PA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Big Beaver, PA, Pennsylvania, Pennsylvania forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 45 Total length: 337 meters (1,106ft) Total costs: $13,233,000 Total average daily traffic: 362,401 Total average daily truck traffic: 72,411 National Bridge Inventory (NBI) Registered Bridges for Big Beaver
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 40018072, Location: 3200' NORTH OF SR 0551 (Lat: 40.797361, Lng: -80.334953), Route carried "on" structure: State highway 18, Year Built: 1950, Year Reconstructed: 1995, Status: Open, Structure Length: 15.42m (50.59ft), Average Daily Traffic: 12,059 (year 2008), Truck Traffic: 9%, Average Future Daily Traffic: 15,000 (year 2022), Design Load: H 15, Features Intersected: CREEK, Facility Carried by Structure: FOURTH AV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 46.415, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 19.2m (63.0ft), Skew: 30 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 24.4m (80.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 18.8m (61.7ft), Out-to-Out Width: 20.8m (68.2ft) Condition: Deck: Good, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Inventory Rating: 66.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 15.42m (50.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $51,000, Roadway Improvement Cost: $149,000, Total Project Cost: $683,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4035100303172, Location: 500' N.W. OF TWP. RD.703 (Lat: 40.845667, Lng: -80.412542), Route carried "on" structure: State highway 351, Year Built: 1929, Status: Temporarily open, Structure Length: 2.96m (9.71ft), Average Daily Traffic: 1,120 (year 2008), Truck Traffic: 5%, Average Future Daily Traffic: 1,250 (year 2020), Design Load: H 15, Features Intersected: N.FORK L.BEAVER CREEK, Facility Carried by Structure: ECHO VALLEY RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.260, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 14.6m (47.9ft), Curb-To-Curb Width: 7.0m (23.0ft), Out-to-Out Width: 7.8m (25.6ft) Condition: Deck: Serious, Superstructure: Serious, Substructure: Poor, Channel: Satisfactory, Operating Rating: 32.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.96m (9.71ft), Designated Inspection Frequency: Every 6 months, Other Special Inspection Frequency: Every 6 months, Inspection Date: November 2007, Other Special Inspection Date: May 2005, Bridge Improvement Cost: $65,000, Roadway Improvement Cost: $191,000, Total Project Cost: $876,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 4035100800455, Location: 300' S.W. OF PA TURNPIKE (Lat: 40.840111, Lng: -80.388100), Route carried "on" structure: State highway 351, Year Built: 1951, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 2,310 (year 2008), Truck Traffic: 7%, Average Future Daily Traffic: 2,400 (year 2020), Design Load: HS 20, Features Intersected: JORDAN RUN, Facility Carried by Structure: FAIRLANE BL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.441, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 4 degrees, Material/Design: Concrete, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft) Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 49.0 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007 Find on map >>
Structure Number: 4035101002435, Location: BIG BEAVER BOROUGH (Lat: 40.843333, Lng: -80.370000), Route carried "on" structure: State highway 351, Year Built: 1992, Status: Open, Structure Length: 7.62m (25.00ft), Average Daily Traffic: 2,384 (year 2008), Truck Traffic: 5%, Average Future Daily Traffic: 3,197 (year 2028), Design Load: H 15, Features Intersected: PA TPK(PA 60);BV-115nbsb Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.687, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 40.8m (133.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.3m (43.6ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 24 months, Inspection Date: March 2008, Critical Feature Inspection Date: March 2008, Other Special Inspection Date: March 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4400600100052, Location: @INTER.W/SR 4001 (Lat: 40.816806, Lng: -80.375328), Route carried "on" structure: State highway , Year Built: 1976, Status: Open, Structure Length: 5.67m (18.60ft), Average Daily Traffic: 799 (year 2008), Truck Traffic: 7%, Average Future Daily Traffic: 1,300 (year 2020), Design Load: HS 20, Features Intersected: N & S RR, Facility Carried by Structure: SUMMIT CUT RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Steel continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 3, Length of Maximum Span: 41.1m (134.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 14.5m (47.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Structural Evaluation: High priority of corrective action, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4706099003067, Location: BIG BEAVER BOROUGH (Lat: 40.795000, Lng: -80.360000), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 10.18m (33.40ft), Average Daily Traffic: 9,871 (year 1998), Truck Traffic: 12%, Design Load: H 15, Features Intersected: SR 0551; BV-106 NB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.5m (41.0ft), Skew: 19 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 50.9m (167.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 77.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4706099003068, Location: BIG BEAVER BOROUGH (Lat: 40.795000, Lng: -80.361667), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 10.12m (33.20ft), Average Daily Traffic: 9,871 (year 1998), Truck Traffic: 12%, Design Load: H 15, Features Intersected: SR 0551; BV-106 SB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 13 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 50.6m (166.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 78.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4706099003245, Location: BIG BEAVER BOROUGH (Lat: 40.820000, Lng: -80.371667), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 9,871 (year 1998), Truck Traffic: 12%, Design Load: H 15, Features Intersected: SR4001,NORFOLK;BV-110 NB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 10 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 45.7m (149.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Excellent, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4706099003246, Location: BIG BEAVER BOROUGH (Lat: 40.820000, Lng: -80.373333), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 9,871 (year 1998), Truck Traffic: 12%, Design Load: H 15, Features Intersected: SR4001,NORFOLK;BV-110 SB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 10 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 45.7m (149.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Excellent, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4706099003469, Location: BIG BEAVER BOROUGH (Lat: 40.850000, Lng: -80.368333), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 7.22m (23.69ft), Average Daily Traffic: 9,871 (year 1998), Truck Traffic: 12%, Design Load: H 15, Features Intersected: TRIB JORDAN RUN;BV-116NB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 13.1m (43.0ft), Skew: 10 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Excellent, Inventory Rating: 60.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 470609900347, Location: BIG BEAVER BOROUGH (Lat: 40.850000, Lng: -80.370000), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 7.22m (23.69ft), Average Daily Traffic: 9,871 (year 1998), Truck Traffic: 12%, Design Load: H 15, Features Intersected: TRIB JORDAN RUN;BV-116SB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 10 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Excellent, Inventory Rating: 60.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4706099003548, Location: BIG BEAVER BOROUGH (Lat: 40.865000, Lng: -80.371667), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 183 (year 1995), Truck Traffic: 10%, Design Load: H 15, Features Intersected: T-303; BV-118 SB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 14 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 39.0m (128.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 57.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4706099003549, Location: BIG BEAVER BOROUGH (Lat: 40.865000, Lng: -80.370000), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 3.35m (10.99ft), Average Daily Traffic: 171 (year 1995), Truck Traffic: 9%, Design Load: H 15, Features Intersected: T-303; BV-118 NB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 13 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.7m (104.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4707699000811, Location: NEAR NEW GALILEE (Lat: 40.851667, Lng: -80.396667), Route carried "on" structure: City street T689, Year Built: 1952, Status: Open, Structure Length: 2.65m (8.69ft), Average Daily Traffic: 200 (year 1990), Average Future Daily Traffic: 240 (year 2010), Design Load: H 15, Features Intersected: PA TURNPIKE(I-76);WB-200, Facility Carried by Structure: T-689 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Toll Authority, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.9m (25.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 3.38m (11.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $13,000, Roadway Improvement Cost: $37,000, Total Project Cost: $171,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4707699000896, Location: SR 351 OVER PTC (Lat: 40.841667, Lng: -80.386667), Route carried "on" structure: State highway 351, Year Built: 1952, Year Reconstructed: 1997, Status: Open, Structure Length: 4.15m (13.62ft), Average Daily Traffic: 2,310 (year 2008), Truck Traffic: 7%, Average Future Daily Traffic: 26,280 (year 2006), Design Load: H 15, Features Intersected: PA TURNPIKE(I-76);WB-202 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.441, Lanes on structure: 2, Lanes under structure: 4, Owner: State Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 99, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 10.2m (33.5ft), Out-to-Out Width: 11.3m (37.1ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.00m (16.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $41,000, Roadway Improvement Cost: $121,000, Total Project Cost: $554,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4707699000947, Location: BIG BEAVER BOROUGH (Lat: 40.838333, Lng: -80.381667), Route carried "on" structure: Ramp State highway 7076, Year Built: 1992, Status: Open, Structure Length: 8.14m (26.71ft), Design Load: H 15, Features Intersected: PA TURNPIKE(I-76);BV-114, Facility Carried by Structure: PA TPK(PA-60)RP O Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 17.1m (56.1ft), Skew: 33 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 55.8m (183.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 18.1m (59.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 83.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4707699001, Location: BIG BEAVER BOROUGH (Lat: 40.835000, Lng: -80.371667), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 9,871 (year 1998), Truck Traffic: 12%, Design Load: H 15, Features Intersected: PA TPK(I-76);BV-112 SB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 16.8m (55.1ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 39.3m (128.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.6m (57.7ft), Out-to-Out Width: 18.6m (61.0ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 80.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4707699001001, Location: BIG BEAVER BORO (Lat: 40.835000, Lng: -80.370000), Route carried "on" structure: State highway 60, Year Built: 1992, Status: Open, Structure Length: 6.71m (22.01ft), Average Daily Traffic: 9,871 (year 1998), Truck Traffic: 12%, Design Load: H 15, Features Intersected: PA TPK.I-76;BV-112 NB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 37.8m (124.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 78.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4707699001013, Location: WEST OF BEAVER VAL INTG (Lat: 40.833861, Lng: -80.367694), Route carried "on" structure: State highway , Year Built: 1952, Year Reconstructed: 1984, Status: Open, Structure Length: 4.02m (13.19ft), Average Daily Traffic: 593 (year 2008), Truck Traffic: 5%, Average Future Daily Traffic: 240 (year 2012), Design Load: H 15, Features Intersected: PA TURNPIKE(I-76);WB-203, Facility Carried by Structure: LR 04099,SR 4001 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.907, Lanes on structure: 2, Lanes under structure: 4, Owner: State Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 99, Length of Maximum Span: 26.2m (86.0ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 7.2m (23.6ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 4.90m (16.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2008, Bridge Improvement Cost: $16,000, Roadway Improvement Cost: $46,000, Total Project Cost: $210,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4707699001202, Location: WEST OF BEAVER VAL INTG (Lat: 40.835000, Lng: -80.336667), Route carried "on" structure: Interstate 76, Year Built: 1952, Year Reconstructed: 1994, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 21,390 (year 2001), Truck Traffic: 28%, Average Future Daily Traffic: 20,422 (year 2012), Design Load: H 15, Features Intersected: T-655;WB-205 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 24.4m (80.1ft), Skew: 32 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 24.4m (80.1ft), Out-to-Out Width: 26.1m (85.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 61.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.70m (5.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2008, Bridge Improvement Cost: $21,000, Roadway Improvement Cost: $63,000, Total Project Cost: $287,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete Find on map >>
Structure Number: 4707699001258, Location: JUNCTION T-680&SR4006 (Lat: 40.816667, Lng: -80.330000), Route carried "on" structure: City street , Year Built: 1952, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 500 (year 1992), Average Future Daily Traffic: 600 (year 2012), Design Load: H 15, Features Intersected: PA TURNPIKE(I-76);WB-206, Facility Carried by Structure: TWP-680 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 26.8m (87.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 1.6m (5.2ft), Curb-To-Curb Width: 7.0m (23.0ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 4.90m (16.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2008, Bridge Improvement Cost: $15,000, Roadway Improvement Cost: $45,000, Total Project Cost: $205,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4707699001283, Location: BEAVER VALLEY INTERCHANGE (Lat: 40.813333, Lng: -80.323333), Route carried "on" structure: Interstate 76, Year Built: 1952, Year Reconstructed: 1994, Status: Open, Structure Length: 2.65m (8.69ft), Average Daily Traffic: 21,390 (year 2001), Truck Traffic: 28%, Average Future Daily Traffic: 20,400 (year 2012), Design Load: HS 20, Features Intersected: SR18,LR77;WB-209 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 8, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 31.1m (102.0ft), Skew: 31 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.2m (76.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 28.7m (94.2ft), Out-to-Out Width: 29.7m (97.4ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Good, Structural Evaluation: High priority of corrective action, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.40m (11.15ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2008, Bridge Improvement Cost: $110,000, Roadway Improvement Cost: $323,000, Total Project Cost: $1,480,000, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 4707699001286, Location: BEAVER VALLEY INTERCHANGE (Lat: 40.813333, Lng: -80.325000), Route carried "on" structure: Interstate 76, Year Built: 1952, Year Reconstructed: 1994, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 21,390 (year 2001), Truck Traffic: 28%, Average Future Daily Traffic: 20,400 (year 2010), Design Load: HS 20, Features Intersected: PA TPK RAMP A:WB-210 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 25.6m (84.0ft), Skew: 30 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.6m (38.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 25.0m (82.0ft), Out-to-Out Width: 26.2m (86.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Structural Evaluation: High priority of corrective action, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.00m (6.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2008, Bridge Improvement Cost: $47,000, Roadway Improvement Cost: $137,000, Total Project Cost: $630,000, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 4707699001321, Location: EAST OF BEAVER VAL INTG (Lat: 40.811667, Lng: -80.318333), Route carried "on" structure: Interstate 76, Year Built: 1952, Year Reconstructed: 1988, Status: Open, Structure Length: 47.12m (154.59ft), Average Daily Traffic: 22,663 (year 2001), Truck Traffic: 28%, Average Future Daily Traffic: 24,000 (year 2011), Design Load: H 15, Features Intersected: SR 1001,BEAVER RIV, RR* Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 23.2m (76.1ft), Skew: 30 degrees, Material/Design: Steel, Design/Construction: Truss - Deck, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 2, Length of Maximum Span: 125.0m (410.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 18.6m (61.0ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Very good, Operating Rating: 51.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 47.10m (154.53ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $603,000, Roadway Improvement Cost: $1,775,000, Total Project Cost: $8,137,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4035101002435, Location: BIG BEAVER BOROUGH (Lat: 40.843333, Lng: -80.370000), Route carried "under" structure: State highway 60, Year Built: 1992, Structure Length: 7.62m (25.00ft), Average Daily Traffic: 353 (year 1995), Truck Traffic: 10%, Features Intersected: PA TPK(PA 60);BV-115nbsb, Facility Carried by Structure: SR 0351 Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.8m (133.9ft) Find on map >>
Structure Number: 4035101002435, Location: BIG BEAVER BOROUGH (Lat: 40.843333, Lng: -80.370000), Route carried "under" structure: _, Year Built: 1992, Structure Length: 7.62m (25.00ft), Features Intersected: PA TPK(PA 60);BV-115nbsb, Facility Carried by Structure: SR 0351 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.8m (133.9ft) Find on map >>
Structure Number: 4706099003067, Location: BIG BEAVER BOROUGH (Lat: 40.795000, Lng: -80.360000), Route carried "under" structure: State highway 551, Year Built: 1992, Structure Length: 10.18m (33.40ft), Average Daily Traffic: 3,842 (year 2008), Truck Traffic: 13%, Features Intersected: SR 0551; BV-106 NB, Facility Carried by Structure: PA TURNPIKE(PA-60) Minimum Vertical Clearance: 7.24m (23.75ft), Kilometerpoint: 2.602, Lanes on structure: 2, Lanes under structure: 3, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.9m (167.0ft) Find on map >>
Structure Number: 4706099003068, Location: BIG BEAVER BOROUGH (Lat: 40.795000, Lng: -80.361667), Route carried "under" structure: State highway 551, Year Built: 1992, Structure Length: 10.12m (33.20ft), Average Daily Traffic: 3,842 (year 2008), Truck Traffic: 13%, Features Intersected: SR 0551; BV-106 SB, Facility Carried by Structure: PA TURNPIKE(PA-60) Minimum Vertical Clearance: 6.96m (22.83ft), Kilometerpoint: 2.602, Lanes on structure: 2, Lanes under structure: 3, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.6m (166.0ft) Find on map >>
Structure Number: 4706099003245, Location: BIG BEAVER BOROUGH (Lat: 40.820000, Lng: -80.371667), Route carried "under" structure: State highway , Year Built: 1992, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 593 (year 2008), Truck Traffic: 5%, Features Intersected: SR4001,NORFOLK;BV-110 NB, Facility Carried by Structure: PA TURNPIKE(PA-60) Minimum Vertical Clearance: 1.28m (4.20ft), Kilometerpoint: 2.985, Lanes on structure: 2, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft) Find on map >>
Structure Number: 4706099003246, Location: BIG BEAVER BOROUGH (Lat: 40.820000, Lng: -80.373333), Route carried "under" structure: State highway , Year Built: 1992, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 593 (year 2008), Truck Traffic: 5%, Features Intersected: SR4001,NORFOLK;BV-110 SB, Facility Carried by Structure: PA TURNPIKE(PA-60) Minimum Vertical Clearance: 13.26m (43.50ft), Kilometerpoint: 2.985, Lanes on structure: 2, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft) Find on map >>
Structure Number: 4706099003548, Location: BIG BEAVER BOROUGH (Lat: 40.865000, Lng: -80.371667), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 4.08m (13.39ft), Features Intersected: T-303; BV-118 SB, Facility Carried by Structure: PA TURNPIKE(PA-60) Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft) Find on map >>
Structure Number: 4706099003549, Location: BIG BEAVER BOROUGH (Lat: 40.865000, Lng: -80.370000), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 3.35m (10.99ft), Features Intersected: T-303; BV-118 NB, Facility Carried by Structure: PA TURNPIKE(PA-60) Minimum Vertical Clearance: 4.78m (15.68ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft) Find on map >>
Structure Number: 4707699000811, Location: NEAR NEW GALILEE (Lat: 40.851667, Lng: -80.396667), Route carried "under" structure: Interstate 76, Year Built: 1952, Structure Length: 2.65m (8.69ft), Average Daily Traffic: 21,767 (year 2004), Truck Traffic: 21%, Features Intersected: PA TURNPIKE(I-76);WB-200, Facility Carried by Structure: T-689 Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft) Find on map >>
Structure Number: 4707699000896, Location: SR 351 OVER PTC (Lat: 40.841667, Lng: -80.386667), Route carried "under" structure: Interstate 76, Year Built: 1952, Structure Length: 4.15m (13.62ft), Average Daily Traffic: 19,297 (year 2001), Truck Traffic: 29%, Features Intersected: PA TURNPIKE(I-76);WB-202, Facility Carried by Structure: SR 0351 Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft) Find on map >>
Structure Number: 4707699000896, Location: SR 351 OVER PTC (Lat: 40.841667, Lng: -80.386667), Route carried "under" structure: _, Year Built: 1952, Structure Length: 4.15m (13.62ft), Features Intersected: PA TURNPIKE(I-76);WB-202, Facility Carried by Structure: SR 0351 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft) Find on map >>
Structure Number: 4707699000947, Location: BIG BEAVER BOROUGH (Lat: 40.838333, Lng: -80.381667), Route carried "under" structure: Interstate 76, Year Built: 1992, Structure Length: 8.14m (26.71ft), Average Daily Traffic: 21,767 (year 2004), Truck Traffic: 21%, Features Intersected: PA TURNPIKE(I-76);BV-114, Facility Carried by Structure: PA TPK(PA-60)RP O Minimum Vertical Clearance: 7.01m (23.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 55.8m (183.1ft) Find on map >>
Structure Number: 4707699001, Location: BIG BEAVER BOROUGH (Lat: 40.835000, Lng: -80.371667), Route carried "under" structure: Interstate 76, Year Built: 1992, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 21,767 (year 2004), Truck Traffic: 21%, Features Intersected: PA TPK(I-76);BV-112 SB, Facility Carried by Structure: PA TURNPIKE(PA-60) Minimum Vertical Clearance: 10.19m (33.43ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.3m (128.9ft) Find on map >>
Structure Number: 4707699001001, Location: BIG BEAVER BORO (Lat: 40.835000, Lng: -80.370000), Route carried "under" structure: Interstate 76, Year Built: 1992, Structure Length: 6.71m (22.01ft), Average Daily Traffic: 21,767 (year 2004), Truck Traffic: 21%, Features Intersected: PA TPK.I-76;BV-112 NB, Facility Carried by Structure: PA TPK(I-60) Minimum Vertical Clearance: 9.22m (30.25ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.8m (124.0ft) Find on map >>
Structure Number: 4707699001013, Location: WEST OF BEAVER VAL INTG (Lat: 40.833861, Lng: -80.367694), Route carried "under" structure: Interstate 76, Year Built: 1952, Structure Length: 4.02m (13.19ft), Average Daily Traffic: 21,767 (year 2004), Truck Traffic: 21%, Features Intersected: PA TURNPIKE(I-76);WB-203, Facility Carried by Structure: LR 04099,SR 4001 Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft) Find on map >>
Structure Number: 4707699001202, Location: WEST OF BEAVER VAL INTG (Lat: 40.835000, Lng: -80.336667), Route carried "under" structure: City street , Year Built: 1952, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 200 (year 1992), Features Intersected: T-655;WB-205, Facility Carried by Structure: PA TURNPIKE (I-76) Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 7.9m (25.9ft) Find on map >>
Structure Number: 4707699001258, Location: JUNCTION T-680&SR4006 (Lat: 40.816667, Lng: -80.330000), Route carried "under" structure: Interstate 76, Year Built: 1952, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 21,390 (year 2001), Truck Traffic: 28%, Features Intersected: PA TURNPIKE(I-76);WB-206, Facility Carried by Structure: TWP-680 Minimum Vertical Clearance: 11.66m (38.25ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: 4707699001283, Location: BEAVER VALLEY INTERCHANGE (Lat: 40.813333, Lng: -80.323333), Route carried "under" structure: State highway 18, Year Built: 1952, Structure Length: 2.65m (8.69ft), Average Daily Traffic: 6,001 (year 2008), Truck Traffic: 9%, Features Intersected: SR18,LR77;WB-209, Facility Carried by Structure: PA TURNPIKE (I-76) Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 47.521, Lanes on structure: 6, Lanes under structure: 4, Toll: On toll road, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 23.2m (76.1ft) Find on map >>
Structure Number: 4707699001283, Location: BEAVER VALLEY INTERCHANGE (Lat: 40.813333, Lng: -80.323333), Route carried "under" structure: State highway 18, Year Built: 1952, Structure Length: 2.65m (8.69ft), Average Daily Traffic: 6,058 (year 2008), Truck Traffic: 9%, Features Intersected: SR18,LR77;WB-209, Facility Carried by Structure: PA TURNPIKE (I-76) Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 47.534, Lanes on structure: 6, Lanes under structure: 4, Toll: On toll road, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 23.2m (76.1ft) Find on map >>
Structure Number: 4707699001286, Location: BEAVER VALLEY INTERCHANGE (Lat: 40.813333, Lng: -80.325000), Route carried "under" structure: Ramp Interstate 76, Year Built: 1952, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 1,719 (year 1995), Truck Traffic: 16%, Features Intersected: PA TPK RAMP A:WB-210 Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Toll: On toll road, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 11.6m (38.1ft) Find on map >>
Structure Number: 4707699001321, Location: EAST OF BEAVER VAL INTG (Lat: 40.811667, Lng: -80.318333), Route carried "under" structure: State highway , Year Built: 1952, Structure Length: 47.12m (154.59ft), Average Daily Traffic: 1,248 (year 2008), Truck Traffic: 3%, Features Intersected: SR 1001,BEAVER RIV, RR*, Facility Carried by Structure: PTC I-76;WB-211 Minimum Vertical Clearance: 10.62m (34.84ft), Kilometerpoint: 3.916, Lanes on structure: 4, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Truss - Deck, Length of Maximum Span: 125.0m (410.1ft) Discuss this city on our hugely popular Pennsylvania forum Back to: Big Beaver, PA, Pennsylvania, All US cities.
|
![]() |