Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Billingsley, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 194ft / 59.2mTotal length
  • $15,072,000Total costs
  • 15,995Total average daily traffic
  • 2,890Total average daily truck traffic
  • 21,673Total future (year 2029) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Billingsley
  • No street view available for this location

New bridges in Billingsley, AL - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 21950-1959
  • 41960-1969
  • 11970-1979
  • 31990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Truck Traffic in Billingsley, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 14.3%Very good
  • 28.6%Good
  • 14.3%Satisfactory
  • 28.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Excellent
  • 28.6%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.6%Excellent
  • 28.6%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 12.5%Very good
  • 43.8%Good
  • 31.3%Satisfactory
  • 6.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.1%Excellent
  • 55.6%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 1907,  Location: 4.1MI.EASTCHILTONCOLINE (Lat: 32.616156,  Lng: -86.728767),  Route carried "on" structure: US 82,  Year Built: 1939,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 2,950 (year 2013),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,820 (year 2033),  Design Load: H 15,  Features Intersected: LITTLE MULBERRYCREEKREIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.667,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,063,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,169,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1908,  Location: 4.3 MI E CHILTON COLINE (Lat: 32.614397,  Lng: -86.725350),  Route carried "on" structure: US 82,  Year Built: 1939,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 2,950 (year 2013),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,820 (year 2033),  Design Load: H 15,  Features Intersected: LITTLEMULBERRYCREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.959,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,712,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $1,883,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1909,  Location: 4.9MIEASTCHILTONCO.LINE (Lat: 32.610272,  Lng: -86.718003),  Route carried "on" structure: US 82,  Year Built: 1939,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,950 (year 2013),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,820 (year 2033),  Design Load: H 15,  Features Intersected: LITTLEMULBERRYCREEKRELIE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 193.884,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $466,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $513,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6111,  Location: CR24 1.5M.W BETHSALM CH (Lat: 32.721667,  Lng: -86.694778),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Posted for load,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 350 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2034),  Design Load: H 15,  Features Intersected: SWIFT CREEK,  Facility Carried by Structure: CR24 EAS RT 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 10.29m (33.76ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,763,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,939,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6969,  Location: 1MI.SO.CHILTON CO. LINE (Lat: 32.699011,  Lng: -86.652403),  Route carried "on" structure: County highway 19,  Year Built: 1960,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 911 (year 2030),  Design Load: H 10,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $316,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 697,  Location: HAYNES (Lat: 32.626903,  Lng: -86.670492),  Route carried "on" structure: County highway 19,  Year Built: 1960,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 15%,  Average Future Daily Traffic: 911 (year 2030),  Design Load: H 15,  Features Intersected: RELIEF-CULVERT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $354,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $389,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6971,  Location: HAYNES (Lat: 32.627997,  Lng: -86.668511),  Route carried "on" structure: County highway 19,  Year Built: 1960,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 15%,  Average Future Daily Traffic: 911 (year 2030),  Design Load: H 10,  Features Intersected: SWIFT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $496,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $546,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6972,  Location: HAYNES (Lat: 32.628278,  Lng: -86.668175),  Route carried "on" structure: County highway 19,  Year Built: 1960,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 15%,  Average Future Daily Traffic: 911 (year 2030),  Design Load: H 10,  Features Intersected: SWIFT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $496,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $546,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1033,  Location: 1 MILE EAST BILLINGSLEY (Lat: 32.670206,  Lng: -86.680406),  Route carried "on" structure: County highway 24,  Year Built: 1970,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 535 (year 2009),  Truck Traffic: 15%,  Average Future Daily Traffic: 796 (year 2029),  Design Load: H 15,  Features Intersected: SWIFT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $275,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15296,  Location: BETHSALEM RD. (Lat: 32.694022,  Lng: -86.666858),  Route carried "on" structure: County highway 55,  Year Built: 1991,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 65 (year 1988),  Truck Traffic: 10%,  Average Future Daily Traffic: 75 (year 2030),  Design Load: H 15,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $640,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16135,  Location: BILLINGSLEY BETHSALEM RD (Lat: 32.681739,  Lng: -86.684725),  Route carried "on" structure: County highway 67,  Year Built: 1993,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 75 (year 1995),  Average Future Daily Traffic: 137 (year 2030),  Design Load: HS 20,  Features Intersected: SWIFT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $618,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16661,  Location: 3.2KM S BILLINGSLEY (Lat: 32.639889,  Lng: -86.718731),  Route carried "on" structure: Alternate County highway 79,  Year Built: 1995,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 75 (year 1991),  Average Future Daily Traffic: 166 (year 2030),  Design Load: HS 20,  Features Intersected: BEADLESCOMB BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.29m (4.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $298,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $328,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17953,  Location: 0.5MI.S.OF BILLINGSLEY (Lat: 32.652367,  Lng: -86.727961),  Route carried "on" structure: County highway 37,  Year Built: 2001,  Status: Open,  Structure Length: 12.00m (39.37ft),  Average Daily Traffic: 980 (year 1999),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,780 (year 2030),  Design Load: HS 20,  Features Intersected: LITTLE MULBERRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.85m (42.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,820,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $3,102,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19858,  Location: CR24 1.6 M W BETHSALEM CH (Lat: 32.721647,  Lng: -86.694725),  Route carried "on" structure: County highway 24,  Year Built: 1957,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,900 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,900 (year 2029),  Features Intersected: SIMPSON BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 5.0m (16.4ft),  Right: 5.0m (16.4ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Good,  Culverts: Excellent,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $288,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20069,  Location: CR350 2MISW NEW CEDRON CH (Lat: 32.707422,  Lng: -86.757364),  Route carried "on" structure: County highway 350,  Year Built: 2007,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 50 (year 2007),  Average Future Daily Traffic: 150 (year 2033),  Design Load: HS 20,  Features Intersected: CR. 350 LITTLE MULBERRY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 4.3m (14.1ft),  Right: 4.3m (14.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,601,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,761,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 21089,  Location: CR352 3ME Pilgram Rest Ch (Lat: 32.677817,  Lng: -86.737875),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 115 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 165 (year 2036),  Design Load: HS 20,  Features Intersected: CR352 Little MulberryCrk,  Facility Carried by Structure: CR 352
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $759,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Billingsley, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.