National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 15 meters (49ft)
Total costs: $4,389,000
Total average daily traffic: 1,458
Total average daily truck traffic: 118
Total future (year 2015) average daily traffic: 1,939
National Bridge Inventory (NBI) Registered Bridges for Birdsall

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 3
  • 1970-1979: 2
  • 1980-1989: 0
  • 1990-1999: 2

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 221427,  Location: .7 MILE SOUTH OF BIRDSALL (Lat: 42.380744,  Lng: -77.920244),  Route carried "on" structure: City street ,  Year Built: 1928,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 26 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 34 (year 2018),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: JOE MCMAHON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $134,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 221428,  Location: 4.0 MI. SE OF BIRDSALL (Lat: 42.377642,  Lng: -77.851489),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 38 (year 1995),  Truck Traffic: 9%,  Average Future Daily Traffic: 50 (year 2015),  Design Load: HS 20,  Features Intersected: CANISTEO RIVER,  Facility Carried by Structure: HILTONVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $134,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 221429,  Location: 3.7 MILES SE OF BIRDSALL (Lat: 42.369661,  Lng: -77.854069),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 3 (year 2015),  Features Intersected: CANISTEO RIVER,  Facility Carried by Structure: SULLIVAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.3m (10.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $134,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 22143,  Location: 4.1 MI SE OF BIRDSALL (Lat: 42.369072,  Lng: -77.847364),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 60 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 78 (year 2020),  Features Intersected: CANISTEO RIVER,  Facility Carried by Structure: HILTONVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $134,000 ( Estimate for 2007),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 221432,  Location: 3.8 MI SE OF BIRDSALL (Lat: 42.373056,  Lng: -77.849394),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 38 (year 1995),  Truck Traffic: 9%,  Average Future Daily Traffic: 50 (year 2015),  Design Load: H 15,  Features Intersected: CANISTEO RIVER,  Facility Carried by Structure: HILTONVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $276,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 221433,  Location: 3.2 MI S OF CANASERAGA (Lat: 42.372756,  Lng: -77.922050),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 42 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 55 (year 2017),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: HAMILTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $303,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 304786,  Location: 1.6 MI S OF BIRDSALL (Lat: 42.367778,  Lng: -77.921125),  Route carried "on" structure: County highway ,  Year Built: 1963,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 5.05m (16.57ft),  Average Daily Traffic: 383 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 518 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: CR 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.05m (16.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $969,000,  Roadway Improvement Cost: $577,000,  Total Project Cost: $1,546,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 304787,  Location: IN BIRDSALL (Lat: 42.391172,  Lng: -77.918308),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 330 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 446 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: CR 15B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $616,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333004,  Location: 1.0 MI N OF BIRDSALL (Lat: 42.403489,  Lng: -77.924019),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 267 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 349 (year 2018),  Design Load: HS 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: CR 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $556,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333005,  Location: 2.5 MI N OF BIRDSALL (Lat: 42.426481,  Lng: -77.929989),  Route carried "on" structure: County highway ,  Year Built: 1962,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 272 (year 2002),  Truck Traffic: 9%,  Average Future Daily Traffic: 356 (year 2022),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $556,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Birdsall, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.