U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Bossier City, Louisiana (LA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Bossier City, LA, Louisiana, Louisiana forum, All US cities.





Parts: 1, 2, 3


National Bridge Inventory (NBI) Statistics
Number of bridges: 107
Total length: 1,180 meters (3,871ft)
Total costs: $53,276,000
Total average daily traffic: 2,297,301
Total average daily truck traffic: 380,300
National Bridge Inventory (NBI) Registered Bridges for Bossier City

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 3
  • 1940-1949: 0
  • 1950-1959: 4
  • 1960-1969: 44
  • 1970-1979: 32
  • 1980-1989: 6
  • 1990-1999: 5
  • 2000-2009: 12

Reconstructed bridges - Historical Statistics

  • 1970-1979: 2
  • 1980-1989: 0
  • 1990-1999: 8

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 40804513106541,  Location: 2.8 MI EAST OF LA 3105 (Lat: 32.558056,  Lng: -93.655028),  Route carried "under" structure: Interstate 220,  Year Built: 1991,  Structure Length: 19.51m (64.01ft),  Average Daily Traffic: 19,800 (year 2007),  Features Intersected: I-220 UNDER SHED RD,  Facility Carried by Structure: LOC RD
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 9.751,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>

Structure Number: 40804513108721,  Location: I-220 OVER US 80 (Lat: 32.541500,  Lng: -93.632139),  Route carried "under" structure: US 80,  Year Built: 1979,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 15,600 (year 2007),  Features Intersected: US 79 & 80,  Facility Carried by Structure: I0220
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 11.472,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>

Structure Number: 40804513108722,  Location: I-220 OVER US 80 (Lat: 32.541500,  Lng: -93.632139),  Route carried "under" structure: US 80,  Year Built: 1979,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 15,600 (year 2007),  Features Intersected: US 79 & 80,  Facility Carried by Structure: I0220
Minimum Vertical Clearance: 0.49m (1.61ft),  Kilometerpoint: 11.488,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)


Parts: 1, 2, 3

Discuss this city on our hugely popular Louisiana forum

Back to: Bossier City, LA, Louisiana, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.