![]() |
Bridge Statistics for Bozrah, Connecticut (CT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Bozrah, CT, Connecticut, Connecticut forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 21 Total length: 77 meters (253ft) Total costs: $32,000 Total average daily traffic: 121,160 Total average daily truck traffic: 6,368 National Bridge Inventory (NBI) Registered Bridges for Bozrah
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 398, Location: 1.10 MI EAST LEBANON TL. (Lat: 41.578333, Lng: -72.183333), Route carried "on" structure: City street , Year Built: 1961, Year Reconstructed: 1999, Status: Open, Structure Length: 6.19m (20.31ft), Average Daily Traffic: 400 (year 1993), Truck Traffic: 1%, Average Future Daily Traffic: 200 (year 2026), Design Load: HS 20, Features Intersected: ROUTE 2, Facility Carried by Structure: BASHON HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.894, Lanes on structure: 2, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 10.1m (33.1ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 32.3m (106.0ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Inventory Rating: 55.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 399, Location: 1.88 MI WEST OF NORWICH (Lat: 41.561667, Lng: -72.165000), Route carried "on" structure: State highway 2, Year Built: 1961, Year Reconstructed: 1993, Status: Open, Structure Length: 3.69m (12.11ft), Average Daily Traffic: 11,750 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 5,875 (year 2026), Design Load: HS 20, Features Intersected: ROUTE 163 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 53.612, Lanes on structure: 3, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 16.6m (54.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 53.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4, Location: 1.88 MI WEST OF NORWIC TL (Lat: 41.560000, Lng: -72.165000), Route carried "on" structure: State highway 2, Year Built: 1961, Year Reconstructed: 1993, Status: Open, Structure Length: 3.69m (12.11ft), Average Daily Traffic: 11,750 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 5,875 (year 2026), Design Load: HS 20, Features Intersected: ROUTE 163 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 53.612, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.6m (44.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 401, Location: 1.53MI WEST OF NORWICH TL (Lat: 41.560000, Lng: -72.158333), Route carried "on" structure: State highway 2, Year Built: 1961, Year Reconstructed: 1988, Status: Open, Structure Length: 8.66m (28.41ft), Average Daily Traffic: 13,000 (year 2004), Truck Traffic: 6%, Average Future Daily Traffic: 6,500 (year 2026), Design Load: H 20, Features Intersected: FITCHVLLE POND&BOZRAH ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 54.159, Lanes on structure: 3, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 23.5m (77.1ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 15.1m (49.5ft), Out-to-Out Width: 16.8m (55.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 79.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 48 months, Inspection Date: May 2006, Underwater Inspection Date: July 2004, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 402, Location: 1.53MI WEST OF NORWICH TL (Lat: 41.565000, Lng: -72.158333), Route carried "on" structure: State highway 2, Year Built: 1961, Year Reconstructed: 1988, Status: Open, Structure Length: 8.90m (29.20ft), Average Daily Traffic: 13,000 (year 2004), Truck Traffic: 6%, Average Future Daily Traffic: 6,500 (year 2026), Design Load: HS 20, Features Intersected: FITCHVLLE POND&BOZRAH ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 54.175, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.3m (37.1ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.7m (81.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 79.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 48 months, Inspection Date: May 2006, Underwater Inspection Date: July 2004, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 403, Location: .67 MI WEST OF NORWICH TL (Lat: 41.565000, Lng: -72.143333), Route carried "on" structure: State highway 2, Year Built: 1961, Year Reconstructed: 1992, Status: Open, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 12,750 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 6,375 (year 2026), Design Load: HS 20, Features Intersected: SR 608 NWCH/CLCHST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 55.559, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.8m (51.8ft), Curb-To-Curb Width: 12.5m (41.0ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 53.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 404, Location: .67 MI WEST OF NORWICH TL (Lat: 41.558333, Lng: -72.143333), Route carried "on" structure: State highway 2, Year Built: 1961, Year Reconstructed: 1992, Status: Open, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 12,750 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 6,375 (year 2026), Design Load: HS 20, Features Intersected: SR 608 NWCH/CLCHST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 55.559, Lanes on structure: 3, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.8m (51.8ft), Curb-To-Curb Width: 13.2m (43.3ft), Out-to-Out Width: 14.9m (48.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 86.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1407, Location: 1.65 MI. SO. OF RTE 2 EB (Lat: 41.548333, Lng: -72.180000), Route carried "on" structure: State highway 163, Year Built: 1925, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 2,400 (year 2006), Truck Traffic: 3%, Average Future Daily Traffic: 1,200 (year 2026), Design Load: HS 15, Features Intersected: PEARSONS BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.940, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 8.7m (28.5ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 61.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 53.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: July 2007, Other Special Inspection Date: July 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 1632, Location: 1.49 MI EAST OF BOZRAH TL (Lat: 41.580000, Lng: -72.176667), Route carried "on" structure: State highway 608, Year Built: 1941, Year Reconstructed: 1999, Status: Open, Structure Length: 2.38m (7.81ft), Average Daily Traffic: 1,500 (year 2004), Truck Traffic: 2%, Average Future Daily Traffic: 750 (year 2026), Design Load: HS 20, Features Intersected: YANTIC RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.719, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.2m (76.1ft), Curb-To-Curb Width: 9.9m (32.5ft), Out-to-Out Width: 11.1m (36.4ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 73.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.7 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1634, Location: 0.5 MI NORTH OF ROUTE 2 (Lat: 41.551667, Lng: -72.165000), Route carried "on" structure: State highway 612, Year Built: 2002, Status: Open, Structure Length: 3.72m (12.20ft), Average Daily Traffic: 2,200 (year 2004), Truck Traffic: 2%, Average Future Daily Traffic: 1,100 (year 2026), Design Load: HS 20, Features Intersected: FITCHVILLE POND Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.097, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 18.0m (59.1ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.6m (44.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 68.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 24 months, Inspection Date: November 2006, Other Special Inspection Date: November 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 4172, Location: 0.49 MI WEST OF SR 612 (Lat: 41.563333, Lng: -72.155000), Route carried "on" structure: State highway 608, Year Built: 1934, Year Reconstructed: 1978, Status: Open, Structure Length: 2.71m (8.89ft), Average Daily Traffic: 3,200 (year 2004), Truck Traffic: 2%, Average Future Daily Traffic: 1,600 (year 2026), Design Load: HS 20, Features Intersected: YANTIC RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.650, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 68.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 4587, Location: 400 FT SE OF ROUTE 163 (Lat: 41.540000, Lng: -72.173333), Route carried "on" structure: City street , Year Built: 2001, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 420 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 210 (year 2026), Design Load: HS 20, Features Intersected: PEARSONS BROOK, Facility Carried by Structure: BISHOP ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.899, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.1m (26.6ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 4589, Location: 700 FT E OF ROUTE 163 (Lat: 41.560000, Lng: -72.160000), Route carried "on" structure: City street , Year Built: 1930, Year Reconstructed: 2006, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 630 (year 2006), Truck Traffic: 2%, Average Future Daily Traffic: 315 (year 2026), Design Load: H 20, Features Intersected: FITCHVILLE POND, Facility Carried by Structure: BOZRAH STREET EXT Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.030, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.4m (4.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.1m (39.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 53.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 24 months, Inspection Date: October 2006, Underwater Inspection Date: Febuary 2006, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 459, Location: 600 FT N OF ROUTE 608 (Lat: 41.571667, Lng: -72.190000), Route carried "on" structure: City street , Year Built: 1957, Status: Open, Structure Length: 1.77m (5.81ft), Average Daily Traffic: 340 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 170 (year 2026), Features Intersected: YANTIC RIVER, Facility Carried by Structure: STANTON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.158, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 6.3m (20.7ft), Out-to-Out Width: 7.2m (23.6ft) Condition: Deck: Good, Superstructure: Poor, Substructure: Good, Channel: Good, Operating Rating: 36.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 22.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 4591, Location: 75 FT N OF GILMAN ROAD (Lat: 41.576667, Lng: -72.196667), Route carried "on" structure: City street , Year Built: 1963, Status: Open, Structure Length: 1.95m (6.40ft), Average Daily Traffic: 340 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 170 (year 2026), Design Load: HS 20, Features Intersected: YANTIC RIVER, Facility Carried by Structure: STANTON HILL RD EX Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.349, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.3m (60.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.7m (28.5ft) Condition: Deck: Poor, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 70.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 5517, Location: 500 FT. EAST OF ROUTE 163 (Lat: 41.560000, Lng: -72.165000), Route carried "on" structure: City street , Year Built: 1984, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 230 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 115 (year 2026), Design Load: HS 20, Features Intersected: GARDNER BROOK, Facility Carried by Structure: GAGER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.287, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb-To-Curb Width: 7.0m (23.0ft), Out-to-Out Width: 8.0m (26.2ft) Condition: Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 52.2 metric tons, Inventory Rating: 30.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.01m (0.03ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2000) Find on map >>
Structure Number: 398, Location: 1.10 MI EAST LEBANON TL. (Lat: 41.578333, Lng: -72.183333), Route carried "under" structure: State highway 2, Year Built: 1961, Structure Length: 6.19m (20.31ft), Average Daily Traffic: 23,900 (year 2004), Truck Traffic: 5%, Features Intersected: ROUTE 2, Facility Carried by Structure: BASHON HILL ROAD Minimum Vertical Clearance: 7.26m (23.82ft), Kilometerpoint: 51.826, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft) Find on map >>
Structure Number: 399, Location: 1.88 MI WEST OF NORWICH (Lat: 41.561667, Lng: -72.165000), Route carried "under" structure: State highway 163, Year Built: 1961, Structure Length: 3.69m (12.11ft), Average Daily Traffic: 2,900 (year 2006), Truck Traffic: 2%, Features Intersected: ROUTE 163, Facility Carried by Structure: ROUTE 2 EASTBOUND Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 20.595, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.0m (45.9ft) Find on map >>
Structure Number: 4, Location: 1.88 MI WEST OF NORWIC TL (Lat: 41.560000, Lng: -72.165000), Route carried "under" structure: State highway 163, Year Built: 1961, Structure Length: 3.69m (12.11ft), Average Daily Traffic: 2,900 (year 2006), Truck Traffic: 2%, Features Intersected: ROUTE 163, Facility Carried by Structure: ROUTE 2 WESTBOUND Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 20.627, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.0m (45.9ft) Find on map >>
Structure Number: 403, Location: .67 MI WEST OF NORWICH TL (Lat: 41.565000, Lng: -72.143333), Route carried "under" structure: State highway 608, Year Built: 1961, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 2,400 (year 2006), Truck Traffic: 5%, Features Intersected: SR 608 NWCH/CLCHST, Facility Carried by Structure: ROUTE 2 EASTBOUND Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 5.889, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 15.8m (51.8ft) Find on map >>
Structure Number: 404, Location: .67 MI WEST OF NORWICH TL (Lat: 41.558333, Lng: -72.143333), Route carried "under" structure: State highway 608, Year Built: 1961, Structure Length: 4.08m (13.39ft), Average Daily Traffic: 2,400 (year 2004), Truck Traffic: 5%, Features Intersected: SR 608 NWCH/CLCHST, Facility Carried by Structure: ROUTE 2 WESTBOUND Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 5.857, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 15.8m (51.8ft) Discuss this city on our hugely popular Connecticut forum Back to: Bozrah, CT, Connecticut, All US cities.
|
![]() |