![]() |
Bridge Statistics for Bradley, Illinois (IL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Bradley, IL, Illinois, Illinois forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 11 Total length: 53 meters (174ft) Total costs: $2,896,000 Total average daily traffic: 173,850 Total average daily truck traffic: 26,519 National Bridge Inventory (NBI) Registered Bridges for Bradley
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Find on map >>
Structure Number: 46001410481, Location: IL RT 50 INTRCHG (Lat: 41.168633, Lng: -87.851133), Route carried "on" structure: Interstate 57, Year Built: 1965, Year Reconstructed: 2007, Status: Open, Structure Length: 5.70m (18.70ft), Average Daily Traffic: 14,000 (year 2007), Truck Traffic: 23%, Average Future Daily Traffic: 25,500 (year 2027), Design Load: HS 20+Mod, Features Intersected: ILL 50 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 507.591, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 14.5m (47.6ft), Out-to-Out Width: 16.0m (52.5ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 60.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 5.70m (18.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $1,014,000, Roadway Improvement Cost: $102,000, Total Project Cost: $1,521,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 46001510482, Location: ILL RTE 50 INTER (Lat: 41.169019, Lng: -87.851131), Route carried "on" structure: Interstate 57, Year Built: 1963, Status: Open, Structure Length: 5.70m (18.70ft), Average Daily Traffic: 13,700 (year 2007), Truck Traffic: 23%, Average Future Daily Traffic: 27,000 (year 2027), Design Load: HS 20+Mod, Features Intersected: ILL 50 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 507.607, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 14.8m (48.6ft), Out-to-Out Width: 16.4m (53.8ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 60.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 46008810687, Location: 2.0 MI N OF ILL 17 (Lat: 41.148142, Lng: -87.838211), Route carried "on" structure: Other road 6177, Year Built: 1960, Status: Open, Structure Length: 6.22m (20.41ft), Average Daily Traffic: 6,900 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 9,500 (year 2025), Design Load: HS 15, Features Intersected: I-57 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.041, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 17.7m (58.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Operating Rating: 57.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.47m (24.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,250,000, Roadway Improvement Cost: $125,000, Total Project Cost: $1,375,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 46012636197, Location: 3.2 MI N OF ILL 17 (Lat: 41.162728, Lng: -87.844131), Route carried "on" structure: Other road 6176, Year Built: 2002, Status: Open, Structure Length: 6.60m (21.65ft), Average Daily Traffic: 10,200 (year 2007), Average Future Daily Traffic: 12,200 (year 2027), Design Load: HS 20, Features Intersected: FAI 057 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.797, Lanes on structure: 4, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 19.3m (63.3ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.2m (82.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.6m (5.2ft), Curb-To-Curb Width: 16.4m (53.8ft), Out-to-Out Width: 21.2m (69.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 71.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: January 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 46001410481, Location: IL RT 50 INTRCHG (Lat: 41.168633, Lng: -87.851133), Route carried "under" structure: State highway 50, Year Built: 1965, Structure Length: 5.70m (18.70ft), Average Daily Traffic: 30,800 (year 2007), Truck Traffic: 11%, Features Intersected: ILL 50, Facility Carried by Structure: FAI-57 SB Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 8.302, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 15.2m (49.9ft) Find on map >>
Structure Number: 46001510482, Location: ILL RTE 50 INTER (Lat: 41.169019, Lng: -87.851131), Route carried "under" structure: State highway 50, Year Built: 1963, Structure Length: 5.70m (18.70ft), Average Daily Traffic: 27,100 (year 2007), Truck Traffic: 10%, Features Intersected: ILL 50, Facility Carried by Structure: FAI-57 NB Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 8.335, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 15.2m (49.9ft) Find on map >>
Structure Number: 46008810687, Location: 2.0 MI N OF ILL 17 (Lat: 41.148142, Lng: -87.838211), Route carried "under" structure: Interstate 57, Year Built: 1960, Structure Length: 6.22m (20.41ft), Average Daily Traffic: 28,000 (year 2007), Truck Traffic: 23%, Features Intersected: I-57, Facility Carried by Structure: NORTH ST/FAU 6177 Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 505.001, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.7m (58.1ft) Find on map >>
Structure Number: 46012636197, Location: 3.2 MI N OF ILL 17 (Lat: 41.162728, Lng: -87.844131), Route carried "under" structure: Interstate 57, Year Built: 2002, Structure Length: 6.60m (21.65ft), Average Daily Traffic: 28,000 (year 2007), Truck Traffic: 23%, Features Intersected: FAI 057, Facility Carried by Structure: ARMOUR RD/FAU 6176 Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 50.669, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 25.2m (82.7ft) Find on map >>
Structure Number: 46630027109, Location: 1 BLOCK W SCHULYER (Lat: 41.142069, Lng: -87.861675), Route carried "under" structure: Other road 6179, Year Built: 1925, Structure Length: 1.65m (5.41ft), Average Daily Traffic: 5,050 (year 2005), Truck Traffic: 5%, Features Intersected: FAU 6179 BROADWAY, Facility Carried by Structure: ICG RR Minimum Vertical Clearance: 4.01m (13.16ft), Kilometerpoint: 1.239, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Slab, Length of Maximum Span: 6.7m (22.0ft) Find on map >>
Structure Number: 4663012711, Location: 1 BLOCK W SCHULYER (Lat: 41.142047, Lng: -87.861492), Route carried "under" structure: Other road 6179, Year Built: 1925, Structure Length: 1.65m (5.41ft), Average Daily Traffic: 5,050 (year 2005), Truck Traffic: 5%, Features Intersected: FAU 6179 BROADWAY ST, Facility Carried by Structure: ICG RR Minimum Vertical Clearance: 4.01m (13.16ft), Kilometerpoint: 1.255, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Slab, Length of Maximum Span: 6.7m (22.0ft) Find on map >>
Structure Number: 46630227111, Location: 1 BLOCK W SCHULYER (Lat: 41.142028, Lng: -87.861303), Route carried "under" structure: Other road 6179, Year Built: 1925, Structure Length: 1.65m (5.41ft), Average Daily Traffic: 5,050 (year 2005), Truck Traffic: 5%, Features Intersected: FAU 6179 BROADWAY ST, Facility Carried by Structure: ICG RR Minimum Vertical Clearance: 4.01m (13.16ft), Kilometerpoint: 1.271, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Slab, Length of Maximum Span: 6.7m (22.0ft) Discuss this city on our hugely popular Illinois forum Back to: Bradley, IL, Illinois, All US cities.
|
![]() |