National Bridge Inventory (NBI) Statistics
Number of bridges: 39
Total length: 117 meters (384ft)
Total costs: $54,000
Total average daily traffic: 1,187,432
Total average daily truck traffic: 113,828
National Bridge Inventory (NBI) Registered Bridges for Branford

New bridges - Historical Statistics

  • Before 1900: 2
  • 1900-1909: 1
  • 1910-1919: 3
  • 1920-1929: 2
  • 1930-1939: 0
  • 1940-1949: 1
  • 1950-1959: 18
  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 4
  • 1990-1999: 3
  • 2000-2009: 4

Reconstructed bridges - Historical Statistics

  • 1960-1969: 2
  • 1970-1979: 0
  • 1980-1989: 4
  • 1990-1999: 3

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 187,  Location: 0.5 MI N OF US ROUTE 1 (Lat: 41.268333,  Lng: -72.851667),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 300 (year 1991),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: HOSLEY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.409,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 188,  Location: 1.0 MI W OF US ROUTE 1 (Lat: 41.286667,  Lng: -72.836667),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 78,300 (year 2004),  Truck Traffic: 9%,  Average Future Daily Traffic: 39,150 (year 2026),  Design Load: HS 20,  Features Intersected: SR 794 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.199,  Lanes on structure: 7,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 43.9m (144.0ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 47.5m (155.8ft),  Out-to-Out Width: 50.5m (165.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 189,  Location: 0.5 MI N OF US ROUTE 1 (Lat: 41.286667,  Lng: -72.828333),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 850 (year 1993),  Truck Traffic: 2%,  Average Future Daily Traffic: 425 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: CHERRY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 85.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 19,  Location: 0.3 MI N OF US ROUTE 1 (Lat: 41.288333,  Lng: -72.823333),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 600 (year 1993),  Truck Traffic: 2%,  Average Future Daily Traffic: 300 (year 2026),  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: TODDS HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 191,  Location: 0.2 MI N OF US ROUTE 1 (Lat: 41.288333,  Lng: -72.820000),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 75,200 (year 2006),  Truck Traffic: 14%,  Average Future Daily Traffic: 37,600 (year 2026),  Design Load: HS 20,  Features Intersected: SR 740 (CEDAR STREET)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 85.647,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 63.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 192,  Location: 1.7 MI S. OF US ROUTE 1 (Lat: 41.291667,  Lng: -72.815000),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 83,100 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 41,550 (year 2026),  Design Load: HS 20,  Features Intersected: IVY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.001,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 32.2m (105.6ft),  Out-to-Out Width: 34.7m (113.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 193,  Location: 0.1 MI N OF US ROUTE 1 (Lat: 41.293333,  Lng: -72.806667),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 84,200 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 42,100 (year 2026),  Design Load: HS 20,  Features Intersected: CHESTNUT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.854,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 29.5m (96.8ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 54.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 194,  Location: 0.1 MI N OF US ROUTE 1 (Lat: 41.293333,  Lng: -72.796667),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 84,200 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 42,100 (year 2026),  Design Load: HS 20,  Features Intersected: MILL PLAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.642,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 29.0m (95.1ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 195,  Location: 0.6 MI S OF US ROUTE 1 (Lat: 41.293333,  Lng: -72.795000),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 84,200 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 42,100 (year 2026),  Design Load: HS 20,  Features Intersected: BRANFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.771,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Inventory Rating: 89.1 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 196,  Location: AT EXIT 55 OFF I-95 (Lat: 41.293333,  Lng: -72.783333),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 84,200 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 42,100 (year 2026),  Design Load: HS 20,  Features Intersected: US ROUTE 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.785,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 29.0m (95.1ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 197,  Location: 2 TENTHS SOUTH OF ROUTE 1 (Lat: 41.293333,  Lng: -72.776667),  Route carried "on" structure: City street ,  Year Built: 1958,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 2,300 (year 1990),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,150 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: FEATHERBED LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.670,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 198,  Location: 0.6 MI N OF US ROUTE 1 (Lat: 41.295000,  Lng: -72.773333),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 80,500 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 40,250 (year 2026),  Design Load: HS 20,  Features Intersected: BRANFORD STEAM RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.670,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 60.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 199,  Location: .3 MI S OF US ROUTE 1 (Lat: 41.296667,  Lng: -72.763333),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 4,700 (year 1993),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,350 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: LEETES ISLAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.020,  Lanes on structure: 5,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.5m (83.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 341,  Location: 0.5 mi s of I-95 (Lat: 41.298333,  Lng: -72.793333),  Route carried "on" structure: US 1,  Year Built: 1958,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 19,500 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,750 (year 2026),  Design Load: HS 20,  Features Intersected: BRANFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 90.587,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 56.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1358,  Location: 0.3 MI N OF US ROUTE 1 (Lat: 41.285000,  Lng: -72.780000),  Route carried "on" structure: State highway 139,  Year Built: 1925,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 9,100 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,550 (year 2026),  Features Intersected: BRANFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1368,  Location: 1.5 MI S. OF US ROUTE 1 (Lat: 41.275000,  Lng: -72.805000),  Route carried "on" structure: State highway 146,  Year Built: 1996,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 6,700 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,350 (year 2026),  Design Load: HS 20,  Features Intersected: BRANFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.462,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 3749,  Location: 0.1 MI E OF ROUTE 146 (Lat: 41.281667,  Lng: -72.803333),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 7,472 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,736 (year 2026),  Design Load: HS 20,  Features Intersected: BRANFORD RIVER,  Facility Carried by Structure: PINE ORCHARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3881,  Location: 200' S OF INTERSTATE-95 (Lat: 41.275000,  Lng: -72.851667),  Route carried "on" structure: City street ,  Year Built: 1887,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 250 (year 1993),  Truck Traffic: 2%,  Average Future Daily Traffic: 125 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD,  Facility Carried by Structure: HOSLEY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 62.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 3883,  Location: .5 MI S. OF ROUTE 146 (Lat: 41.268333,  Lng: -72.815000),  Route carried "on" structure: City street ,  Year Built: 1892,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 6,200 (year 1993),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,100 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD,  Facility Carried by Structure: KIRKHAM STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4083,  Location: 200' N OF WEST END AVENUE (Lat: 41.270000,  Lng: -72.823333),  Route carried "on" structure: City street ,  Year Built: 1917,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 150 (year 1991),  Truck Traffic: 7%,  Average Future Daily Traffic: 75 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD,  Facility Carried by Structure: BRIDGE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4848,  Location: 0.3 MI N. OF US ROUTE 1 (Lat: 41.310000,  Lng: -72.768333),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 575 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 288 (year 2026),  Features Intersected: NOTCH HILL BROOK,  Facility Carried by Structure: SCHOOL GROUND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Very good,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5738,  Location: .5 MI N. OF ROUTE 146 (Lat: 41.278333,  Lng: -72.786667),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 2,700 (year 1993),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,350 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD,  Facility Carried by Structure: PINE ORCHARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 574,  Location: .3MI E OF PINE ORCHARD RD (Lat: 41.281667,  Lng: -72.778333),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 1,000 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 500 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD,  Facility Carried by Structure: BIRCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Galvanized Reinforcing
Find on map >>

Structure Number: 5749,  Location: .8 MI S. OF ROUTE 146 (Lat: 41.268333,  Lng: -72.760000),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 100 (year 1994),  Truck Traffic: 2%,  Average Future Daily Traffic: 50 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD,  Facility Carried by Structure: PLEASANT POINT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.480,  Lanes on structure: 2,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 82.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 5832,  Location: 1 MI SOUTH OF ROUTE 146 (Lat: 41.276667,  Lng: -72.758333),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 114 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 57 (year 2026),  Design Load: HS 20,  Features Intersected: ABANDONED TROLLEY LINE,  Facility Carried by Structure: PLEASANT POINT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 84.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6033,  Location: .5 MI NORTH OF ROUTE 146 (Lat: 41.266667,  Lng: -72.811667),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 3,500 (year 1993),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,750 (year 2026),  Design Load: HS 20,  Features Intersected: BRANFORD RIVER,  Facility Carried by Structure: INDIAN NECK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Underwater Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6034,  Location: 0.1 MI N OF ROUTE 148 (Lat: 41.261667,  Lng: -72.796667),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 171 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 86 (year 2026),  Design Load: HS 20,  Features Intersected: BROOK,  Facility Carried by Structure: WAVERLY PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 187,  Location: 0.5 MI N OF US ROUTE 1 (Lat: 41.268333,  Lng: -72.851667),  Route carried "under" structure: Interstate 95,  Year Built: 1958,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 89,800 (year 2004),  Truck Traffic: 20%,  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: HOSLEY AVENUE
Minimum Vertical Clearance: 0.47m (1.54ft),  Kilometerpoint: 82.912,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>

Structure Number: 188,  Location: 1.0 MI W OF US ROUTE 1 (Lat: 41.286667,  Lng: -72.836667),  Route carried "under" structure: Ramp State highway 794,  Year Built: 1958,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 6,450 (year 2004),  Truck Traffic: 5%,  Features Intersected: SR 794 WB,  Facility Carried by Structure: INTERSTATE-95
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.241,  Lanes on structure: 7,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>

Structure Number: 189,  Location: 0.5 MI N OF US ROUTE 1 (Lat: 41.286667,  Lng: -72.828333),  Route carried "under" structure: Interstate 95,  Year Built: 1958,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 78,300 (year 2004),  Truck Traffic: 14%,  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: CHERRY HILL ROAD
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 84.923,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>

Structure Number: 19,  Location: 0.3 MI N OF US ROUTE 1 (Lat: 41.288333,  Lng: -72.823333),  Route carried "under" structure: Interstate 95,  Year Built: 2002,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 69,300 (year 2004),  Truck Traffic: 14%,  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: TODDS HILL ROAD
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 85.357,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>

Structure Number: 191,  Location: 0.2 MI N OF US ROUTE 1 (Lat: 41.288333,  Lng: -72.820000),  Route carried "under" structure: State highway 740,  Year Built: 1958,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 15,400 (year 2006),  Truck Traffic: 3%,  Features Intersected: SR 740 (CEDAR STREET),  Facility Carried by Structure: INTERSTATE-95
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.306,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>

Structure Number: 196,  Location: AT EXIT 55 OFF I-95 (Lat: 41.293333,  Lng: -72.783333),  Route carried "under" structure: US 1,  Year Built: 1958,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 22,900 (year 2006),  Truck Traffic: 1%,  Features Intersected: US ROUTE 1,  Facility Carried by Structure: INTERSTATE-95
Minimum Vertical Clearance: 0.46m (1.51ft),  Kilometerpoint: 91.423,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>

Structure Number: 197,  Location: 2 TENTHS SOUTH OF ROUTE 1 (Lat: 41.293333,  Lng: -72.776667),  Route carried "under" structure: Interstate 95,  Year Built: 1958,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 71,800 (year 2003),  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: FEATHERBED LANE
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 89.396,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>

Structure Number: 199,  Location: .3 MI S OF US ROUTE 1 (Lat: 41.296667,  Lng: -72.763333),  Route carried "under" structure: Interstate 95,  Year Built: 2003,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 67,400 (year 2004),  Truck Traffic: 10%,  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: LEETES ISLAND ROAD
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 90.506,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>

Structure Number: 34,  Location: 100'E OF JUC RT 142 & US1 (Lat: 41.275000,  Lng: -72.830000),  Route carried "under" structure: US 1,  Year Built: 1928,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 27,600 (year 2005),  Truck Traffic: 1%,  Features Intersected: US ROUTE 1,  Facility Carried by Structure: AMTRAK NE CORRIDOR
Minimum Vertical Clearance: 4.17m (13.68ft),  Kilometerpoint: 86.709,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>

Structure Number: 342,  Location: 0.3 MI N OF ROUTE 139 (Lat: 41.298333,  Lng: -72.775000),  Route carried "under" structure: US 1,  Year Built: 1913,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 9,400 (year 2005),  Truck Traffic: 10%,  Features Intersected: US ROUTE 1,  Facility Carried by Structure: PRIVATE RAILROAD
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 9.226,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>

Structure Number: 1369,  Location: AT TWEED ROAD (Lat: 41.268333,  Lng: -72.773333),  Route carried "under" structure: State highway 146,  Year Built: 1917,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 2,200 (year 2005),  Truck Traffic: 5%,  Features Intersected: ROUTE 146,  Facility Carried by Structure: AMTRAK RAILROAD
Minimum Vertical Clearance: 3.15m (10.33ft),  Kilometerpoint: 7.788,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 8.8m (28.9ft)

Find on map >>

Structure Number: 5386,  Location: 1.4 MI E OF US ROUTE 1 (Lat: 41.276667,  Lng: -72.806667),  Route carried "under" structure: State highway 146,  Year Built: 1900,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 6,700 (year 2004),  Truck Traffic: 5%,  Features Intersected: ROUTE 146,  Facility Carried by Structure: AMTRAK RAILROAD
Minimum Vertical Clearance: 3.05m (10.01ft),  Kilometerpoint: 2.253,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Discuss this city on our hugely popular Connecticut forum