National Bridge Inventory (NBI) Statistics
Number of bridges: 17
Total length: 94 meters (308ft)
Total costs: $20,497,000
Total average daily traffic: 91,370
Total average daily truck traffic: 6,696
National Bridge Inventory (NBI) Registered Bridges for Brattleboro

New bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 0
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 3
  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 11
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 101302005113021,  Location: 0.04 MI TO JCT W CL1 TH2 (Lat: 42.850000,  Lng: -72.589722),  Route carried "on" structure: Other road C3372,  Year Built: 1994,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 220 (year 2000),  Truck Traffic: 2%,  Average Future Daily Traffic: 330 (year 2020),  Design Load: HS 20,  Features Intersected: WHETSTONE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $753,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200091005N13022,  Location: 0.7 MI N EXIT 1 (Lat: 42.844444,  Lng: -72.573056),  Route carried "on" structure: Interstate 91,  Year Built: 1960,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 8,900 (year 1998),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,350 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 NB OVER MAPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.178,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $2,115,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,265,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091005S13022,  Location: 0.7 MI N EXIT 1 (Lat: 42.844444,  Lng: -72.573333),  Route carried "on" structure: Interstate 91,  Year Built: 1960,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 8,900 (year 1998),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,350 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 SB OVER MAPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.178,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $1,892,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,042,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091006N13022,  Location: 0.2 MI S EXIT 2 (Lat: 42.848889,  Lng: -72.578333),  Route carried "on" structure: Interstate 91,  Year Built: 1960,  Status: Open,  Structure Length: 12.65m (41.50ft),  Average Daily Traffic: 8,900 (year 1998),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,350 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER WILLIAMS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.821,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.90m (45.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $4,202,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $4,352,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200091006S13022,  Location: 0.2 MI S EXIT 2 (Lat: 42.848889,  Lng: -72.578611),  Route carried "on" structure: Interstate 91,  Year Built: 1960,  Status: Open,  Structure Length: 12.65m (41.50ft),  Average Daily Traffic: 8,900 (year 1998),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,350 (year 2018),  Design Load: HS 20,  Features Intersected: I 91 OVER WILLIAMS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.821,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.90m (45.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $4,202,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $4,352,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 202000000713022,  Location: 0.1 MI N JCT. VT.142 (Lat: 42.850833,  Lng: -72.557500),  Route carried "on" structure: US 5,  Year Built: 1938,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 15,260 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 22,890 (year 2019),  Design Load: HS 25,  Features Intersected: WHETSTONE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 17.9m (58.7ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,900,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,050,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 202012003113022,  Location: ELLIOT ST (Lat: 42.849722,  Lng: -72.567778),  Route carried "on" structure: City street ELLT,  Year Built: 1946,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 4,500 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,750 (year 2017),  Features Intersected: WHETSTONE BROOK,  Facility Carried by Structure: CITY ELLIOT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $865,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,015,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 202014003213022,  Location: ELM ST (Lat: 42.849167,  Lng: -72.560833),  Route carried "on" structure: City street ELM,  Year Built: 1966,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 3,900 (year 1997),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,850 (year 2017),  Design Load: HS 20,  Features Intersected: WHETSTONE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.54m (11.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,004,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,154,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>

Structure Number: 202028003013022,  Location: GUILFORD ST (Lat: 42.849722,  Lng: -72.585833),  Route carried "on" structure: City street GUILF,  Year Built: 1879,  Status: Posted for load,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 4,000 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,000 (year 2017),  Features Intersected: WHETSTONE BROOK
Minimum Vertical Clearance: 3.53m (11.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Inventory Rating: 2.7 metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $465,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $615,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 202048003413022,  Location: WILLIAMS ST (Lat: 42.848889,  Lng: -72.575000),  Route carried "on" structure: City street WILMS,  Year Built: 1939,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 1,340 (year 2000),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,010 (year 2020),  Design Load: HS 20+Mod,  Features Intersected: WHETSTONE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $765,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $915,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 202048003513022,  Location: WILLIAMS ST (Lat: 42.848611,  Lng: -72.573056),  Route carried "on" structure: City street WILMS,  Year Built: 1930,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,300 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,950 (year 2017),  Features Intersected: WHETSTONE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $818,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $968,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: CEPNEDVT5010002,  Location: 27.4 KM N OF BRATTLEBORO (Lat: 43.020000,  Lng: -72.725000),  Route carried "on" structure: Federal lands road ,  Year Built: 1961,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 50 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 50 (year 2024),  Design Load: H 15,  Features Intersected: SPILLWAY CHANNEL,  Facility Carried by Structure: ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.16m (30.05ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Critical Feature Inspection Date: June 2006,  Bridge Improvement Cost: $16,000,  Total Project Cost: $16,000 ( Estimate for 2006),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 200010054A13022,  Location: I91 EXIT 2 (Lat: 42.850556,  Lng: -72.579444),  Route carried "under" structure: Interstate 91,  Year Built: 1960,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 17,800 (year 1998),  Truck Traffic: 13%,  Features Intersected: I 91 UNDER VT 9,  Facility Carried by Structure: VT 00009 ML
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 14.047,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>

Structure Number: 200091005N13022,  Location: MAPLE STREET (Lat: 42.844444,  Lng: -72.573056),  Route carried "under" structure: City street MAPLE,  Year Built: 1960,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 2,400 (year 1997),  Truck Traffic: 6%,  Features Intersected: 91 NB OVER MAPLE STREET,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>

Structure Number: 200091005S13022,  Location: MAPLE STREET (Lat: 42.844444,  Lng: -72.573333),  Route carried "under" structure: City street MAPLE,  Year Built: 1960,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 2,400 (year 1997),  Truck Traffic: 6%,  Features Intersected: I 91 SB OVER MAPLE ST.,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 0.48m (1.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>

Structure Number: 200091006N13022,  Location: WILLIAMS STREET (Lat: 42.848889,  Lng: -72.578333),  Route carried "under" structure: City street WILMS,  Year Built: 1960,  Structure Length: 12.65m (41.50ft),  Average Daily Traffic: 1,300 (year 1997),  Truck Traffic: 6%,  Features Intersected: I 91 OVER WILLIAMS,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 17.04m (55.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>

Structure Number: 200091006S13022,  Location: WILLIAMS STREET (Lat: 42.848889,  Lng: -72.578611),  Route carried "under" structure: City street WILMS,  Year Built: 1960,  Structure Length: 12.65m (41.50ft),  Average Daily Traffic: 1,300 (year 1997),  Truck Traffic: 6%,  Features Intersected: I 91 OVER WILLIAMS,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 17.04m (55.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Discuss this city on our hugely popular Vermont forum

Back to: Brattleboro, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.