U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Brecksville, Ohio (OH) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Brecksville, OH, Ohio, Ohio forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 20
Total length: 142 meters (466ft)
Total costs: $800,000
Total average daily traffic: 539,265
Total average daily truck traffic: 49,270
National Bridge Inventory (NBI) Registered Bridges for Brecksville

New bridges - Historical Statistics

  • 1930-1939: 3
  • 1940-1949: 0
  • 1950-1959: 4
  • 1960-1969: 9
  • 1970-1979: 3
  • 1980-1989: 0
  • 1990-1999: 1

Reconstructed bridges - Historical Statistics

  • 1970-1979: 1
  • 1980-1989: 2
  • 1990-1999: 1
  • 2000-2009: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 180286,  Location: .13 M N SR-82 (Lat: 41.321881,  Lng: -81.626858),  Route carried "on" structure: State highway 21,  Year Built: 1995,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 15,550 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,583 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: CHIPPEWA CRK .13 MI N 82
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.930,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1805649,  Location: 2.48 MI. S. OF JCT SR-82 (Lat: 41.282878,  Lng: -81.636258),  Route carried "on" structure: City street 229,  Year Built: 1968,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 22,460 (year 2002),  Truck Traffic: 7%,  Average Future Daily Traffic: 77,103 (year 2028),  Design Load: H 20,  Features Intersected: I-77 (UNDER SNOWVILLE RD,  Facility Carried by Structure: SNOWVILLE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 123.990,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 1805673,  Location: 2.0 MI. S. OF JCT. SR.82 (Lat: 41.289225,  Lng: -81.636750),  Route carried "on" structure: County highway 187,  Year Built: 1968,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 16,260 (year 2002),  Truck Traffic: 7%,  Average Future Daily Traffic: 90,970 (year 2028),  Design Load: H 20,  Features Intersected: I-77,  Facility Carried by Structure: MILLER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 123.990,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.7m (84.3ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1805703,  Location: 1.2 MI. S. OF JCT. SR-82 (Lat: 41.299739,  Lng: -81.643381),  Route carried "on" structure: County highway 74,  Year Built: 1968,  Status: Open,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 3,363 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 90,970 (year 2028),  Design Load: H 20,  Features Intersected: I-77,  Facility Carried by Structure: HIGHLAND DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 123.990,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 1805738,  Location: 1.07 MI. S. OF JCT. SR-82 (Lat: 41.301386,  Lng: -81.644558),  Route carried "on" structure: City street 1138,  Year Built: 1968,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 21,363 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 90,970 (year 2028),  Design Load: H 15,  Features Intersected: IR77,  Facility Carried by Structure: BRECKSVILLE PKWY.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 33.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 1805762,  Location: .59 MI. S. OF JCT. SR-82 (Lat: 41.307608,  Lng: -81.648486),  Route carried "on" structure: County highway 81,  Year Built: 1971,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 3,533 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 90,970 (year 2028),  Design Load: H 20,  Features Intersected: I-77,  Facility Carried by Structure: OAKES RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 123.990,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 1807269,  Location: .25 MI E SR21 (Lat: 41.320208,  Lng: -81.622069),  Route carried "on" structure: State highway 82,  Year Built: 1932,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 13,300 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,460 (year 2027),  Design Load: H 20,  Features Intersected: CHIPPEWA CRK .40 MI E 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.150,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.5 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1829955,  Location: 2.1MI WEST OF EXIT 11 (Lat: 41.285000,  Lng: -81.658333),  Route carried "on" structure: City street 74,  Year Built: 1954,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 30,000 (year 1990),  Truck Traffic: 20%,  Average Future Daily Traffic: 34,922 (year 2027),  Design Load: H 10,  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: RICHFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1829971,  Location: 1.6MI WEST OF EXIT 11 (Lat: 41.280000,  Lng: -81.650000),  Route carried "on" structure: City street 212,  Year Built: 1954,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 10.49m (34.42ft),  Average Daily Traffic: 30,000 (year 1990),  Truck Traffic: 20%,  Average Future Daily Traffic: 34,922 (year 2027),  Design Load: H 10,  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: BARR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1831054,  Location: 2380' E. OF RIVERVIEW RD (Lat: 41.288333,  Lng: -81.565000),  Route carried "on" structure: County highway 225,  Year Built: 1967,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 3,889 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,079 (year 2023),  Design Load: HS 15,  Features Intersected: CUY RVR/VAUGHN RD #110
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 27.0 metric tons,  Inventory Rating: 19.8 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2005,  Underwater Inspection Date: July 1993,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1831682,  Location: WEST OF BRECKSVILLE RD (Lat: 41.321667,  Lng: -81.641667),  Route carried "on" structure: County highway 267,  Year Built: 1936,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 4,742 (year 1999),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,542 (year 2023),  Design Load: HS 15,  Features Intersected: CHIPPEWA CK/OLD RLTN #10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.3 metric tons,  Inventory Rating: 24.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $118,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 183169,  Location: WEST OF WARRENSVILLE RD (Lat: 41.323333,  Lng: -81.635000),  Route carried "on" structure: County highway 267,  Year Built: 1936,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 4,742 (year 1999),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,542 (year 2023),  Design Load: HS 15,  Features Intersected: CHIPPEWA CRK/OLD RLTN#10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.0 metric tons,  Inventory Rating: 19.8 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $182,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1833898,  Location: 3327' N OF PARKVIEW RD,  Route carried "on" structure: County highway 96,  Year Built: 1974,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 2,033 (year 1998),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,822 (year 2029),  Design Load: HS 20,  Features Intersected: CHIPPEWA CRK/RVRVIEW #11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.5 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1805649,  Location: 2.48 MI. S. OF JCT SR-82 (Lat: 41.282878,  Lng: -81.636258),  Route carried "under" structure: Interstate 77,  Year Built: 1968,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 55,550 (year 2004),  Truck Traffic: 10%,  Features Intersected: SNOWVILLE RD,  Facility Carried by Structure: SNOWVILLE RD.
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.061,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>

Structure Number: 1805673,  Location: 2.0 MI. S. OF JCT. SR.82 (Lat: 41.289225,  Lng: -81.636750),  Route carried "under" structure: Interstate 77,  Year Built: 1968,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 65,540 (year 2004),  Truck Traffic: 9%,  Features Intersected: CR-187 (MILLER RD),  Facility Carried by Structure: MILLER RD.
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.132,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>

Structure Number: 1805703,  Location: 1.2 MI. S. OF JCT. SR-82 (Lat: 41.299739,  Lng: -81.643381),  Route carried "under" structure: Interstate 77,  Year Built: 1968,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 65,540 (year 2004),  Truck Traffic: 9%,  Features Intersected: CR-74 (HIGHLAND DR),  Facility Carried by Structure: HIGHLAND DR
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.261,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>

Structure Number: 1805738,  Location: 1.07 MI. S. OF JCT. SR-82 (Lat: 41.301386,  Lng: -81.644558),  Route carried "under" structure: Interstate 77,  Year Built: 1968,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 65,540 (year 2004),  Truck Traffic: 9%,  Features Intersected: VALLEY PARKWAY,  Facility Carried by Structure: BRECKSVILLE PKWY.
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.282,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>

Structure Number: 1805762,  Location: .59 MI. S. OF JCT. SR-82 (Lat: 41.307608,  Lng: -81.648486),  Route carried "under" structure: Interstate 77,  Year Built: 1971,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 65,540 (year 2004),  Truck Traffic: 9%,  Features Intersected: CR-81 (OAKES RD),  Facility Carried by Structure: OAKES RD.
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.359,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>

Structure Number: 1829955,  Location: 2.1MI WEST OF EXIT 11 (Lat: 41.285000,  Lng: -81.658333),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 25,160 (year 1972),  Features Intersected: RICHFIELD RD MP1711,  Facility Carried by Structure: RICHFIELD RD
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.288,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>

Structure Number: 1829971,  Location: 1.6MI WEST OF EXIT 11 (Lat: 41.280000,  Lng: -81.650000),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 10.49m (34.42ft),  Average Daily Traffic: 25,160 (year 1972),  Features Intersected: BARR RD MP1716,  Facility Carried by Structure: BARR RD
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.296,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Discuss this city on our hugely popular Ohio forum

Back to: Brecksville, OH, Ohio, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.