Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bremerton, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 627ft / 191mTotal length
  • $98,909,000Total costs
  • 540,814Total average daily traffic
  • 30,411Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bremerton
  • No street view available for this location

New bridges in Bremerton, WA - historical statistics
  • New bridges - historical statistics
  • 51950-1959
  • 51960-1969
  • 51970-1979
  • 21980-1989
  • 51990-1999
  • 32000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Bremerton, WA
Average Bridge Truck Traffic in Bremerton, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Very good
  • 66.7%Good
  • 22.2%Satisfactory
  • 5.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.6%Very good
  • 66.7%Good
  • 16.7%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 61.1%Good
  • 22.2%Satisfactory
  • 5.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 71.4%Very good
  • 14.3%Good
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 1WA015,  Location: 620 M SE OF NEVADA ST. E (Lat: 47.567592,  Lng: -122.551703),  Route carried "on" structure: ServiceFederal lands road ,  Year Built: 1954,  Status: Posted for load,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 20 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 24 (year 2037),  Design Load: H 15,  Features Intersected: PATROL RD. & BEACH DRIVE,  Facility Carried by Structure: FUEL STORAGE FACIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: Navy/Marines,  Approaching Roadway Width: 4.1m (13.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $60,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5237A,  Location: 9.8 N PIERCE CO (Lat: 47.528167,  Lng: -122.677500),  Route carried "on" structure: State highway 16,  Year Built: 1956,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 29,125 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 38,678 (year 2039),  Design Load: HS 20,  Features Intersected: SR 166
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.756,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,872,000,  Roadway Improvement Cost: $374,000,  Total Project Cost: $3,744,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5565A,  Location: 0.7 N JCT SR 304 (Lat: 47.578061,  Lng: -122.632731),  Route carried "on" structure: State highway 303,  Year Built: 1958,  Status: Open,  Structure Length: 52.33m (171.69ft),  Average Daily Traffic: 43,552 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 57,837 (year 2039),  Design Load: HS 20,  Features Intersected: PORT WASHINGTON NARROWS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 24.4m (80.1ft), Horizontal Clearance: 70.4m (231.0ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 12,  Length of Maximum Span: 76.2m (250.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 52.33m (171.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $19,230,000,  Roadway Improvement Cost: $3,846,000,  Total Project Cost: $38,461,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 5770A,  Location: 1.3 N JCT SR 304 (Lat: 47.585556,  Lng: -122.630000),  Route carried "on" structure: State highway 303,  Year Built: 1958,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 40,981 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 54,422 (year 2039),  Design Load: HS 20,  Features Intersected: CALLAHAN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.028,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $882,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6825A,  Location: 0.4 E JCT SR 303 (Lat: 47.562150,  Lng: -122.624817),  Route carried "on" structure: State highway 304,  Year Built: 1961,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 560 (year 2010),  Average Future Daily Traffic: 953 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: SINCLAIR INLET
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 5.649,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: April 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,008,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7883A,  Location: 4.5 N JCT SR 304 (Lat: 47.581944,  Lng: -122.695000),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 5,602 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,829 (year 2036),  Design Load: HS 20,  Features Intersected: SR 3,  Facility Carried by Structure: AUSTIN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $1,814,000,  Roadway Improvement Cost: $363,000,  Total Project Cost: $3,629,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7883B,  Location: 5.6 N JCT SR 304 (Lat: 47.596486,  Lng: -122.698839),  Route carried "on" structure: State highway 3,  Year Built: 1966,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 30,482 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 40,480 (year 2039),  Design Load: HS 20,  Features Intersected: ERLAND POINT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.082,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,344,000,  Roadway Improvement Cost: $269,000,  Total Project Cost: $2,688,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9203A,  Location: 0.7 N JCT SR 304 (Lat: 47.558019,  Lng: -122.672389),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 13,643 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 21,501 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 3,  Facility Carried by Structure: WERNER/LOXIE EAGAN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,130,000,  Roadway Improvement Cost: $426,000,  Total Project Cost: $4,260,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9476B,  Location: 3.5 N JCT SR 304 (Lat: 47.569306,  Lng: -122.684306),  Route carried "on" structure: State highway 3,  Year Built: 1974,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 22,888 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,395 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 310/KITSAP WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.622,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.37m (20.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,006,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $4,013,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 12352A,  Location: 3.5 N JCT SR 304 (Lat: 47.569306,  Lng: -122.684083),  Route carried "on" structure: State highway 3,  Year Built: 1983,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 22,888 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,395 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 310/KITSAP WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.622,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,016,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $4,032,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13652A,  Location: JCT SR 3 (Lat: 47.548194,  Lng: -122.671250),  Route carried "on" structure: State highway 304,  Year Built: 1991,  Status: Open,  Structure Length: 9.72m (31.89ft),  Average Daily Traffic: 14,407 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,132 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.6m (166.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.72m (31.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,182,000,  Roadway Improvement Cost: $636,000,  Total Project Cost: $6,364,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13663A,  Location: 0.4 E JCT SR 303 (Lat: 47.562033,  Lng: -122.625167),  Route carried "on" structure: State highway 304,  Year Built: 1990,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 3,600 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,320 (year 2031),  Design Load: HS 20,  Features Intersected: SINCLAIR INLET
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 5.649,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: April 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,092,000 ( Estimate for 2014),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13663B,  Location: 0.4 E JCT SR 303 (Lat: 47.562028,  Lng: -122.625000),  Route carried "on" structure: State highway 304,  Year Built: 1990,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 12,807 (year 2010),  Average Future Daily Traffic: 15,368 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SINCLAIR INLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.649,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $984,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $1,968,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17926A,  Location: 0.6 E JCT SR 303 (Lat: 47.569297,  Lng: -122.623267),  Route carried "on" structure: City street 303,  Year Built: 2011,  Status: Open,  Structure Length: 47.24m (154.99ft),  Average Daily Traffic: 6,537 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,949 (year 2036),  Design Load: HL 93,  Features Intersected: PORT WASH NARROWS,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Navigation Control: Yes ( Vertical Clearance: 22.9m (75.1ft), Horizontal Clearance: 70.4m (231.0ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 76.2m (250.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 47.24m (154.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2021,  Underwater Inspection Date: May 2017,  Bridge Improvement Cost: $9,920,000,  Roadway Improvement Cost: $1,984,000,  Total Project Cost: $19,840,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 85224,  Location: 00.10 MI E JCT SR 3 (Lat: 47.571861,  Lng: -122.655028),  Route carried "on" structure: City street 2152,  Year Built: 1963,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 19,840 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 21,700 (year 2040),  Design Load: HS 20,  Features Intersected: WYCOFF AVENUE,  Facility Carried by Structure: 11TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $922,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $1,843,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85949,  Location: 0.14 E JCT MINARD RD W (Lat: 47.510897,  Lng: -122.792086),  Route carried "on" structure: County highway 10609,  Year Built: 1992,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 3,789 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,168 (year 2042),  Design Load: HS 20,  Features Intersected: UNION RIVER,  Facility Carried by Structure: W BELFAIR VALY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $639,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89167,  Location: 2.6 MI SE OF SR 3 (Lat: 47.464250,  Lng: -122.745008),  Route carried "on" structure: County highway 25009,  Year Built: 2020,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 4,545 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 5,000 (year 2040),  Design Load: HL 93,  Features Intersected: COUTLER CREEK,  Facility Carried by Structure: SW LAKE FLORA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: GA1206A,  Location: 0.8 E JCT SR 303 (Lat: 47.562800,  Lng: -122.625050),  Route carried "on" structure: ServiceOther road 304,  Year Built: 2000,  Status: Posted for load,  Structure Length: 19.66m (64.50ft),  Average Daily Traffic: 22 (year 2012),  Average Future Daily Traffic: 28 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 304, WSF QUEUE LANES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Lanes under structure: 16,  Owner: State Highway Agency,  Maintenance Responsibility: Local Toll Authority,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 23,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 36.0m (118.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.66m (64.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,193,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $4,386,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5237A,  Location: 0.3 E JCT SR 16 (Lat: 47.528167,  Lng: -122.677500),  Route carried "under" structure: State highway 166,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 14,639 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 166,  Facility Carried by Structure: SR 16 NORTHBOUND
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 7883A,  Location: 4.5 N JCT SR 304 (Lat: 47.581944,  Lng: -122.695000),  Route carried "under" structure: State highway 3,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 57,697 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 3,  Facility Carried by Structure: AUSTIN DRIVE
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 63.279,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 9203A,  Location: 0.7 N JCT SR 304 (Lat: 47.558019,  Lng: -122.672389),  Route carried "under" structure: State highway 3,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 41,787 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 3,  Facility Carried by Structure: WERNER/LOXIE EAGAN
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 60.045,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 9476A,  Location: 1.2 N JCT SR 304 (Lat: 47.564056,  Lng: -122.678000),  Route carried "under" structure: State highway 3,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 50,930 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 3,  Facility Carried by Structure: SEARLE ST PED
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 60.865,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 9476B,  Location: JCT SR 3 (Lat: 47.569306,  Lng: -122.684306),  Route carried "under" structure: State highway 310,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 23,730 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 310/KITSAP WAY,  Facility Carried by Structure: SR 3
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 12352A,  Location: JCT SR 3 (Lat: 47.569306,  Lng: -122.684083),  Route carried "under" structure: State highway 310,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 23,730 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 310/KITSAP WAY,  Facility Carried by Structure: SR 3
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 13652A,  Location: 2.1 N JCT SR 16 (Lat: 47.548194,  Lng: -122.671250),  Route carried "under" structure: State highway 3,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 49,773 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 3
Minimum Vertical Clearance: 6.48m (21.26ft),  Kilometerpoint: 58.886,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: GA1206A,  Location: 0.8 E JCT SR 303 (Lat: 47.562800,  Lng: -122.625050),  Route carried "under" structure: State highway 304,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 1,810 (year 2008),  Truck Traffic: 5%,  Features Intersected: SR 304, WSF QUEUE LANES
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 5.617,  Lanes on structure: 1,  Lanes under structure: 16,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: GA1206B,  Location: 0.8 E JCT SR 303 (Lat: 47.562483,  Lng: -122.624733),  Route carried "under" structure: State highway 304,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 1,430 (year 2010),  Truck Traffic: 4%,  Features Intersected: SR 304,  Facility Carried by Structure: TERMINAL BUILDING
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 5.601,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 65.5m (214.9ft)

Discuss Bremerton, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.