Bridge Statistics for Burien, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 272ft / 83.0mTotal length
  • $74,715,000Total costs
  • 680,061Total average daily traffic
  • 23,060Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Burien
  • No street view available for this location

New bridges in Burien, WA - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 41960-1969
  • 161970-1979
  • 12010-2019
Average Bridge Daily Traffic in Burien, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 50.0%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 75.0%Good
  • 16.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 83.3%Good
  • 8.3%Satisfactory
Find on map >>   Show street view

Structure Number: 8276C,  Location: 1.3 N JCT SR 518 (Lat: 47.488358,  Lng: -122.326142),  Route carried "on" structure: State highway 509,  Year Built: 1968,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 45,683 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 64,504 (year 2039),  Design Load: HS 20,  Features Intersected: S 128TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.227,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,410,000,  Roadway Improvement Cost: $682,000,  Total Project Cost: $6,821,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8592A,  Location: 0.8 N JCT SR 518 (Lat: 47.481250,  Lng: -122.327722),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 7,669 (year 2010),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,378 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 509,  Facility Carried by Structure: S136TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.37m (20.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,006,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $4,013,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8644A,  Location: 0.4 E JCT SR 509 (Lat: 47.469972,  Lng: -122.323806),  Route carried "on" structure: State highway 518,  Year Built: 1970,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 62,986 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 88,936 (year 2039),  Design Load: HS 20,  Features Intersected: 8TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.33m (17.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,010,000,  Roadway Improvement Cost: $602,000,  Total Project Cost: $6,020,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8644B,  Location: 0.6 E JCT SR 509 (Lat: 47.470147,  Lng: -122.319364),  Route carried "on" structure: State highway 518,  Year Built: 1970,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 62,986 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 88,936 (year 2039),  Design Load: HS 20,  Features Intersected: DES MOINES WAY S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 34 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,821,000,  Roadway Improvement Cost: $764,000,  Total Project Cost: $7,642,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8745A,  Location: 5.2 N JCT SR 516 (Lat: 47.459686,  Lng: -122.329861),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 7.71m (25.30ft),  Average Daily Traffic: 11,946 (year 2012),  Truck Traffic: 4%,  Design Load: HS 20,  Features Intersected: SR 509,  Facility Carried by Structure: SO 160TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 18.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.71m (25.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,542,000,  Roadway Improvement Cost: $708,000,  Total Project Cost: $7,084,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8745B,  Location: 6.5 N JCT SR 516 (Lat: 47.463306,  Lng: -122.332000),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 8,754 (year 2010),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,129 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 509,  Facility Carried by Structure: S 156TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.888,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,236,000,  Roadway Improvement Cost: $447,000,  Total Project Cost: $4,471,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8745C,  Location: 5.7 N JCT SR 516 (Lat: 47.466917,  Lng: -122.332167),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 11,984 (year 2010),  Truck Traffic: 4%,  Average Future Daily Traffic: 18,839 (year 2036),  Design Load: HS 20,  Features Intersected: SR 509,  Facility Carried by Structure: SO 152ND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,702,000,  Roadway Improvement Cost: $340,000,  Total Project Cost: $3,405,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8745D,  Location: 0.1 N JCT SR 518 (Lat: 47.472333,  Lng: -122.331778),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 5,632 (year 2012),  Truck Traffic: 4%,  Design Load: HS 20,  Features Intersected: SR 509,  Facility Carried by Structure: SO 146TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 23.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.02m (29.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,894,000,  Roadway Improvement Cost: $379,000,  Total Project Cost: $3,789,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8745E,  Location: JCT SR 509 (Lat: 47.470333,  Lng: -122.332139),  Route carried "on" structure: State highway 518,  Year Built: 1971,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 45,470 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 64,203 (year 2039),  Design Load: HS 20,  Features Intersected: SR 509
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 7,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 21.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.35m (24.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $4,627,000,  Roadway Improvement Cost: $925,000,  Total Project Cost: $9,254,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11070B,  Location: 5.7 N JCT SR 516 (Lat: 47.452222,  Lng: -122.325028),  Route carried "on" structure: State highway 509,  Year Built: 1979,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 32,847 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 46,379 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SO 168TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.075,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.21m (17.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,941,000,  Roadway Improvement Cost: $588,000,  Total Project Cost: $5,882,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11070C,  Location: 5.8 N JCT SR 516 (Lat: 47.453778,  Lng: -122.325833),  Route carried "on" structure: State highway 509,  Year Built: 1979,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 32,847 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 46,379 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: DES MOINES MEMORIAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.252,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 35 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,340,000,  Roadway Improvement Cost: $1,068,000,  Total Project Cost: $10,680,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19078A,  Location: 0.2 E JCT SR 509 (Lat: 47.469917,  Lng: -122.323444),  Route carried "on" structure: Ramp State highway 518,  Year Built: 2018,  Status: Not yet open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 5,000 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,200 (year 2036),  Design Load: HL 93,  Features Intersected: 8TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.67m (18.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,827,000,  Roadway Improvement Cost: $565,000,  Total Project Cost: $5,654,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8276A,  Location: 1.0 N JCT SR 518 (Lat: 47.484806,  Lng: -122.327278),  Route carried "under" structure: State highway 509,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 66,106 (year 2019),  Truck Traffic: 2%,  Features Intersected: SR 509,  Facility Carried by Structure: S 132ND ST PED
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 42.841,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 8592A,  Location: 0.8 N JCT SR 518 (Lat: 47.481250,  Lng: -122.327722),  Route carried "under" structure: State highway 509,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 66,106 (year 2019),  Truck Traffic: 2%,  Features Intersected: SR 509,  Facility Carried by Structure: S136TH ST
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 42.454,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 8745A,  Location: 6.3 N JCT SR 516 (Lat: 47.459686,  Lng: -122.329861),  Route carried "under" structure: State highway 509,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 25,471 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 509,  Facility Carried by Structure: SO 160TH ST
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 39.960,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 8745B,  Location: 6.5 N JCT SR 516 (Lat: 47.463306,  Lng: -122.332000),  Route carried "under" structure: State highway 509,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 39,755 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 509,  Facility Carried by Structure: S 156TH ST
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 40.395,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 8745C,  Location: 6.8 N JCT SR 516 (Lat: 47.466917,  Lng: -122.332167),  Route carried "under" structure: State highway 509,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 39,755 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 509,  Facility Carried by Structure: SO 152ND ST
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 40.813,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 8745D,  Location: 0.1 N JCT SR 518 (Lat: 47.472333,  Lng: -122.331778),  Route carried "under" structure: State highway 509,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 27,125 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 509,  Facility Carried by Structure: SO 146TH ST
Minimum Vertical Clearance: 6.73m (22.08ft),  Kilometerpoint: 41.408,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 8745E,  Location: 7.0 N JCT SR 516 (Lat: 47.470333,  Lng: -122.332139),  Route carried "under" structure: State highway 509,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 27,125 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 509,  Facility Carried by Structure: SR 518
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 41.199,  Lanes on structure: 7,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 11070A,  Location: 5.2 N JCT SR 516 (Lat: 47.445189,  Lng: -122.321347),  Route carried "under" structure: State highway 509,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 32,847 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 509,  Facility Carried by Structure: CLOSED S 176TH ST
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 38.238,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 11070C,  Location: 5.8 N JCT SR 516 (Lat: 47.453778,  Lng: -122.325833),  Route carried "under" structure: City street 509,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 5,467 (year 1993),  Truck Traffic: 3%,  Features Intersected: DES MOINES MEMORIAL
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 2.993,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 80634,  Location: 1ST AVE S & SW 126 (Lat: 47.490653,  Lng: -122.333792),  Route carried "under" structure: City street 138,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 16,500 (year 2018),  Truck Traffic: 6%,  Features Intersected: 1ST AVE S,  Facility Carried by Structure: PEDESTRIAN OX
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.001,  Lanes under structure: 4,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)